最佳实践 scrum_Scrum仪式的类型和最佳做法是什么?

最佳实践 scrum

Scrum strongly enforces the goals and time boxes for everything, including the ceremonies. This post covers these outstanding events and identifies the goals for each as well as their necessity. Take 7-8 minutes to figure them out.

Scrum会为所有活动(包括仪式)严格执行目标和时间表。 这篇文章涵盖了这些杰出的事件,并确定了每个目标的必要性。 花7-8分钟找出它们。

image

会议文化又回来了 (Meetings culture is back)

Business meetings are essential to the proper functioning of projects or companies. These kinds of activities are often despised but still are perceived as helpful to the progress of projects.

商务会议对于项目或公司的正常运作至关重要。 这些活动通常被轻视,但仍被认为对项目的进展有帮助。

Often employees spend a lot of time attending meetings and like to complain about it. That's why one of the goals of the meeting moderator is to make employees sure that the meetings are a productivity tool, that the team should learn to use better.

通常,员工会花很多时间参加会议,并且喜欢抱怨。 这就是会议主持人的目标之一就是要确保员工确保会议是一种生产力工具,团队应该学会更好地使用会议。

According to one of the statistical researches, 15% of a company’s time is spent in meetings. Another study proposes 37%. In fact, this depends on the industry, companies' objectives, the number of employees, and many other factors. In any case, companies do not strive to say goodbye to meetings, as these business events can bring real benefits.

根据一项统计研究 ,公司的时间中有15%用于会议。 另一项研究提出37%。 实际上,这取决于行业,公司的目标,员工人数以及许多其他因素。 无论如何,公司不会努力告别会议,因为这些商业活动可以带来真正的好处。

If we are talking about the Scrum culture, then, in this case, meetings are mandatory elements of the concept. The ceremonies in Scrum directly affect the entire team’s performance, its productivity, and efficiency.

如果我们谈论的是Scrum文化,那么在这种情况下,会议是该概念的强制性元素。 Scrum中的仪式直接影响到整个团队的绩效,生产力和效率。

image

Scrum仪式容易解释 (Scrum ceremonies easy explained)

At first sight, Scrum is quite simple but it can be difficult to master. This Agile approach requires self-organizing teams that can quickly solve challenges in unpredictable environments. Holding Scrum meetings provides regular communication and transparency in these conditions.

乍一看,Scrum非常简单,但是可能很难掌握。 这种敏捷方法需要自组织的团队,这些团队可以在无法预测的环境中快速解决挑战。 举行Scrum会议可以在这些情况下进行定期沟通和透明化。

All Scrum events are inherent elements of the Agile software delivery process. Scrum masters set time boxes for each group meeting according to the length of the sprints. That’s why people sometimes name them Scrum master ceremonies.

所有Scrum事件都是敏捷软件交付过程的固有要素。 Scrum主管根据冲刺的长度为每个小组会议设置时间框。 这就是为什么人们有时将它们命名为Scrum主仪式。

5个Scrum仪式可不断增强您的敏捷团队能力 (5 Scrum ceremonies that constantly empower your Agile team)

There are 5 ceremonies of Scrum (four of them are standard and the backlog refinement is considered as additional — aimed to reduce current impediments). All the meetings ensure that everyone in the team (a Scrum Master, Product Owner, and developers) is in-sync.

Scrum共有5个仪式(其中4个是标准仪式,积压工作被认为是额外的,目的是减少当前的障碍)。 所有会议都确保团队中的每个人(Scrum Master,产品负责人和开发人员)保持同步。

1.冲刺计划 (1. Sprint Planning)

Everything starts with planning. This is the time when the team meets and decides what they need to complete in the coming sprint.

一切都始于计划。 这是团队开会并决定在接下来的冲刺中需要完成什么的时间。

During this meeting, the Scrum team and product owner negotiate user stories and other items of a product backlog. The team will attempt to deliver them at the end of the sprint. The product owner focuses on the most important items that will empower business and generate the most return on investment.

在此会议期间,Scrum团队和产品所有者协商用户案例以及产品积压的其他项目。 该团队将尝试在冲刺​​结束时交付它们。 产品负责人专注于最重要的项目,这些项目将增强业务能力并产生最大的投资回报。

It's crucial for the team to determine its capacity throughout the negotiating process in sprint planning. They estimate the number of story points to attribute to a backlog item that will help to define the relative amount of effort to complete every backlog item.

对于团队来说,至关重要的是在sprint计划的整个协商过程中确定其能力。 他们估计可以归因于积压项目的故事点数,这将有助于定义完成每个积压项目的相对工作量。

Breaking up work into small chunks is a key component of Scrum. If implementing a particular feature requires more than 2 weeks, you need to break it up into smaller features before you can start on it.

将工作分解成小块是Scrum的关键组成部分。 如果实施特定功能需要2个多星期,则需要先将其分解为较小的功能,然后才能开始使用。

Fortunately, today you may use many software solutions for planning work. An appropriate project management tool will offer convenient Scrum boards for sprint planning with a helpful set of additional functionality.

幸运的是,今天您可以使用许多软件解决方案来计划工作。 适当的项目管理工具将提供方便的Scrum板,以进行冲刺规划,并提供一组有用的附加功能。

2.每日站起来 (2. Daily Stand Up)

The daily standup is a short (usually 15-minutes) meeting that makes sure everyone knows what’s happening. This daily event ensures transparency across the team.

每日站立是一个简短的会议(通常15分钟),可确保每个人都知道发生了什么事。 这项日常活动可确保整个团队的透明度。

The detailed status meeting is rather light and fun, but also quite informative. It consists of every person speaking and answering the following questions:

详细的状态会议非常轻松有趣,但也很有帮助。 它由每个人说和回答以下问题组成:

  • What did I accomplish yesterday?

    我昨天完成了什么?
  • What will I do today?

    我今天要做什么?
  • Am I blocked by something?

    我被什么东西挡住了吗?

The reason why the meeting is a “Stand up” is connected with the fact that people who are standing feel uncomfortable. So they less likely distracted with unrelated topics. No laptops, notes, important emails, and urgent issues.

会议之所以成为“站起来”,是因为站着的人感到不舒服。 因此,他们不太可能分散无关主题的注意力。 没有笔记本电脑,笔记,重要的电子邮件和紧急问题。

A Scrum master should attend the event to help facilitate possible impediments if they are reported. Team members should report to the rest of their team members. It's highly recommended for product owners to attend the daily standup.

Scrum管理员应参加活动,以帮助缓解可能的障碍(如果已报告)。 团队成员应向其他团队成员报告。 强烈建议产品所有者参加日常站立。

The Stands up should be quick to not waste extra time. If you want to discuss long global issues, it's better to appoint a separate meeting with the people involved.

站起来应该很快,不要浪费额外的时间。 如果您想讨论长期的全球性问题,最好与相关人员单独开会。

3. Sprint审查会议 (3. Sprint Review Meeting)

At the end of each sprint, the product owner, scrum master, and the team are meet together to hold a Sprint review and showcase their work. Stakeholders may also be invited.

在每个Sprint结束时,产品所有者,Scrum Master和团队将聚在一起,进行Sprint审查并展示其工作。 也可以邀请利益相关者。

Each participant reviews new features or whatever they worked on during the Sprint. They demonstrate the finished work and can provide and get feedback from the stakeholders.

每个参与者都要审查新功能或他们在Sprint期间所做的任何工作。 他们演示完成的工作,并可以提供和获取利益相关者的反馈。

Unlike other Scrum events, this review can last as long as it takes to demonstrate all the work done by the team.

与其他Scrum活动不同,此审核可以持续很长时间,以证明团队所做的所有工作。

In general, these demos communicate the value and nature of your work to your team members.

通常,这些演示将您的工作的价值和性质传达给团队成员。

4.冲刺回顾 (4. Sprint Retrospective)

After the release is finished, it’s high time to discuss what worked and what did not, what mistakes were made and what lessons were learned. The main goal of the retrospective is to make the next Sprint better.

发布完成后,就该讨论什么有效,什么无效,犯了什么错误以及从中学到了什么。 回顾的主要目标是使下一个Sprint更好。

There should be no blames during the discussion. You may anonymize your claims, but after all, we all make mistakes and every mistake is an opportunity to learn something.

讨论中不应有任何责备。 您可以匿名声明,但毕竟我们都会犯错,每个错误都是学习知识的机会。

The retro-meeting includes the scrum master, the product owner, and the development team.

追溯会议包括Scrum主管,产品负责人和开发团队。

Scrum strives to continuous improvement and the retrospective meeting is the event that makes sure the product and development culture is constantly improving.

Scrum致力于持续改进,而回顾会议则是确保产品和开发文化在不断改善的盛会。

5.积压整理 (5. Backlog Grooming)

Most Scrum teams participate in a Backlog grooming meeting (also known as a refinement) once per sprint. This ceremony is a recurring event for Agile development teams.

大多数Scrum团队每个sprint参加一次Backlog修饰会议(也称为优化)。 对于敏捷开发团队来说,该仪式是经常性的活动。

The key goal of the refinement session is to ensure that the next few sprints worth of user stories are prepared for Sprint Planning. It also guarantees that the right stories are prioritized. During the Backlog Grooming, teams usually:

优化会议的主要目标是确保为Sprint计划准备接下来的几个Sprint用户故事。 它还保证正确的故事优先。 在待办事项整理期间,团队通常:

  • discuss user stories

    讨论用户故事
  • break down large user stories into smaller ones

    将大型用户故事分解为较小的故事
  • answer any questions to smooth out any ambiguity

    回答任何问题以消除歧义
  • ensure that upcoming user stories meet the definition of readiness

    确保即将到来的用户案例符合准备就绪的定义

Regular arranged refinement sessions keep the overall health of the backlog in check.

定期安排的优化会议可确保积压的总体运行状况。

By the way, we've recently shared some insightful thoughts about how to maximize the value of product backlog grooming.

顺便说一下,我们最近分享了一些有关如何最大程度地提高产品待办事项梳理价值的见解。

image

Scrum仪式之外还有其他会议吗? (Are there other meetings outside Scrum ceremonies?)

Sometimes people involved in a Scrum team may attend a range of meetings outside of the ceremonies described above. That's ok.

有时,参与Scrum团队的人员可能会参加上述仪式之外的一系列会议。 没关系。

However, a large number of attended meetings can be harmful, because the employee will really spend a lot of working time on meetings (necessary and unnecessary). By the way, very often we cannot avoid participating in such meetings. For example, team meetings run by HRs, bug triage meetings, global product positioning meetings, etc.

但是,参加大量会议可能是有害的,因为员工确实会在会议上花费大量工作时间(必要和不必要)。 顺便说一下,我们经常不能避免参加这样的会议。 例如,由人力资源负责的团队会议,错误分类会议,全球产品定位会议等。

That's why some companies may replace some of the must-have Scrum meetings with ordinary emails or special spaces created on the server or apps.

这就是为什么有些公司可能会用服务器或应用程序上创建的普通电子邮件或特殊空间替换某些必备的Scrum会议的原因。

外卖 (Takeaways)

Scrum ceremonies and artifacts are aimed to support the Scrum team in delivering on its objectives.

Scrum仪式和工件旨在支持Scrum团队实现其目标。

All these events and activities are important to Agile software development teams and should be fulfilled to ensure team performance and effectiveness are at their peak. Do not hesitate to spend time on these meetings. Anyway, practice shows that they are worth being held regularly.

所有这些事件和活动对敏捷软件开发团队都非常重要,应予以兑现,以确保团队绩效和有效性达到顶峰。 不要犹豫,花些时间参加这些会议。 无论如何,实践表明值得定期举办。

翻译自: https://habr.com/en/company/hygger/blog/463871/

最佳实践 scrum

敏捷里的 Scrum 会议(5 个仪式) 瀑布侧重计划交付,敏捷侧重价值交付。 阅读详情

相关推荐

SCRUM实践 最佳实践文档

SCRUM实践 最佳实践文档 项目经理的首选

支撑分布式 Scrum 团队的五项最佳实践

分布式 Scrum,从来都不简单。 Scrum 的基石 —— 透明性、开放性、自组织 —— 在分布式 Scrum 团队的环境下的实践难度均有着不同程度的提高,沟通协作障碍重重、团队建设难上加难。但与此同时,受成本节约的影响,很多公司又认为分布式 Scrum 是大势所趋。 与上述争议无关,本文只是一份提供给 Scrum Master 的实践指南,可以为分...

weixin_33725722的博客 468

使用gsplat进行3D高斯泼溅的方案

gsplat 不是一个软件,而是一个深度优化CUDA的开源Python库。它的作者是 Nerfstudio 团队,这个团队最出名的项目是 Nerfstudio,是对 NeRFs 方法支持最好的一套框架。据其所述,出于对新一代技术的好奇,他们构建了 gsplat 这个库。它支持 Windows/Linux 两个系统,使用前必须准备好 Nvidia 显卡。跑这个项目真是特别费劲,官方的文档支持不够完善,以至于遇到问题,开发者们都只能在issue区里抱团取暖。

兴趣使然的创作者 2033

Scrum

Scrum 是一个轻量的框架,它通过提供针对复杂问题的自适应解决方案来帮助人们、团队组织创造价值,Scrum 是用于管理产品开发的单个团队过程框架。该框架包含 Scrum 角色、事件、工件规则,采用迭代方法来交付工作产品。Scrum 团队一般由 5 到 9 个(7±2)团队成员组成。有三种类型角色:产品负责人(PO,Product Owner):产品负责人定义项目愿景、需求优先级,对产品成功负责。负责团队,并移除障碍,帮助他们实现产品负责人所设定的目标。

承缘丶 2211

敏捷开发方法Scrum最佳实践

首先强调一些Scrum的基本概念本文只想为那些不断实验敏捷开发方法、追寻快速交付产品的IT管理者提供全套经过验证的实践经验,供之参考。我首先假设你已经理解了Scrum这种敏捷开发方法的基本概念并认同之,但是仍然,我还是要强调以下我们对Scrum达成的“共识”:-) Scrum开发流程通常以30 天或者更短的一段时间为一个周期,由产品经理(Product Owner) 提供新...

weixin_34144848的博客 375

敏捷开发——SCRUM

SCRUM是当前较火的一种敏捷开发方法,有用户故事、冲刺、燃尽图等很多很酷的玩法,有牛B的产品负责人、SCRUM Master,有很强的自组织团队。

kanban board Scrum board有什么区别?

board是敏捷项目管理方法的基本要素,也是团队工作方式的重要视觉指标。跟踪日常工作根据需要在团队内外共享工作流程进度以集体愿景透明度为决策提供信息,board为产品积压工作(backlog)工作,积压工作是根据路线图及其要求派生的开发团队的优先工作列表。最重要的项显示在产品积压工作的顶部,以便团队知道首先要交付什么。在 Jira 中,看板是数字化的,所有人都可以访问。它们采用kanban board或Scrum board的形式。

weixin_53273474的博客 2236

SCRUM MASTER负责确保团队遵循Scrum框架流程

Scrum Master在Scrum团队中扮演着至关重要的角色,他们负责确保团队能够高效地工作并交付高质量的产品。培训与指导:对团队成员进行Scrum相关知识技能的培训,指导新成员融入Scrum团队。SCRUM MASTER帮助团队成员更好地理解彼此的角色职责,增强团队凝聚力,提升团队整体绩效。保护团队:保护团队免受外部不必要的干扰压力,确保团队能够按照既定的节奏计划开展工作。通过以上步骤,Scrum Master可以更有效地平衡多个项目的优先级,确保团队能够高效地交付价值并满足利益相关者的期望。

[Blog][Domain] programb.blog.csdn.net 2482

Scrum团队的最佳规模?

无论你在小型创业公司工作还是在大公司的新产品线工作,当团队人数越来越多时总会达到一个临界点。尽早识别这个临界点可以让您的团队避免进入低效阶段。每个产品都是不同的,团队合作也是如此。因此,拆分团队也需要做一些反映团队情况的决定。在做决定时有以下几点需要考虑: 团队不在一起工作时如何确保专业知识的完整性? 是否应该按职能划分?(如:前端团队后端团队) 新的团队应该有单独的back...

weixin_30640769的博客 1350

Scrum总结

一个轻量级的软件开发方法 Scrum是一个敏捷开发框架,是一个增量迭代的开发过程.。在这个框架整个开发周期由若干个小的跌代周期,每个小的的跌代周期称为一个Sprint,每个Sprint的长度2到4周。在每个Sprint中,Scrum的开发团队拿到一个排列好优先级的需求列表,我们称它为用户故事或者叫Sprint backlog, 所以我们先开发的是对客户具有较高价值的需求。 在每个迭代...

天天开心 804

如何确定Scrum团队的最佳规模?

无论你在小型创业公司工作还是在大公司的新产品线工作,当团队人数越来越多时总会达到一个临界点。尽早识别这个临界点可以让您的团队避免进入低效阶段。 每个产品都是不同的,团队合作也是如此。因此,拆分团队也需要做一些反映团队情况的决定。在做决定时有以下几点需要考虑: 团队不在一起工作时如何确保专业知识的完整性? 是否应该按职能划分?(如:前端团队后端团队) 新的团队应该有单独的backlog吗? 产品...

柚橙论 1673

Scrum 学习笔记_每个sprint都要做估算吗

Scrum是一个敏捷开发框架,是一个增量的、迭代的开发过程。在这个框架中,整个开发周期包括若干个小的跌代周期,每个小的的跌代周期称为一个 Sprint,每个 Sprint 的建议长度2到4周。在 Scrum 中,使用产品 Backlog 来管理产品或项目的需求,产品 backlog 是一个按照商业价值排序的需求列表,列表条目的体现形式通常为用户故事。Sprint 中挑选的需求经过 Sprint 计划会议上的分析、讨论估算得到一个 Sprint 的任务列表,我们称它为 Sprint backlog。

2401_89317568的博客 475

scrum回顾_「项目管理scrum全面讲解

Scrum 学习笔记敏捷火了很长一段时间了,但是一直没有机会实践,现在开始组队实践了,哈哈,先好好研习下规则~~1.什么是 scrumScrum是一个敏捷开发框架,是一个增量的、迭代的开发过程。在这个框架中,整个开发周期包括若干个小的跌代周期,每个小的的跌代周期称为一个 Sprint,每个 Sprint 的建议长度2到4周。在 Scrum 中,使用产品 Backlog 来管理产品或项目的需求,产品...

weixin_39924329的博客 184

scrum

1、scrum定义以及scrum流行的原因 2、scrum理论以及三大支柱 3、scrum框架组成3355 a、三个角色:产品负责人、scrum master、开发团队 b、三个工件:产品代办列表、Sprint代办列表、产品增量 c、五个会议:冲刺计划会、每日站会、评审会、回顾会、代办事项梳理 d、五个价值观:开放、专注、勇气、承诺、尊重 4、DOD 1、scrum定义以及scrum流行的原因 •...

weixin_37123068的博客 2181

Scrum 学习笔记

Scrum 学习笔记 敏捷火了很长一段时间了,但是一直没有机会实践,现在开始组队实践了,哈哈,先好好研习下规则~~ 什么是 scrum Scrum是一个敏捷开发框架,是一个增量的、迭代的开发过程。在这个框架中,整个开发周期包括若干个小的跌代周期,每个小的的跌代周期称为一个 Sprint,每个 Sprint 的建议长度2到4周。在 Scrum 中,使用产品 Backlog 来管理产品或项目

罗朝辉(飘飘白云) 1万+

Scrum扫盲

什么是Scrum?一张图胜过千言万语。 向大家推荐2本书 http://pan.baidu.com/share/link?shareid=4018745934&uk=2938552241&fid=4027034353 http://ishare.iask.sina.com.cn/f/33976516.html?from=dl 看完这两本书就知道什么是Scrum了。 什么是 scr

步春良 2359

Scrum敏捷项目管理

敏捷的背景与动机 软件危机及软件工程的出现 速度是企业竞争致胜的关键因素,软件项目的最大挑战在于, 一方面要应付变动中的需求,一方面要在紧缩的时程内完成项目, 传统的软件工程难以满足这些要求 所以软件团队除了在技术上必须日益精进,更需要运用有效的开发流程,以确保团队能够发挥综效。 这正是Agile Process (敏捷的软件开发流程)于近年来兴起的主要原因。 软件项目的复杂性 解决复杂性问题需要采用经验式方式 解决问题的两种方式: 预定义过程控制(富士康流水线生产) 经验性过程控制(摸着.

jamin_liu_90的博客 2164

scrum_分布式Scrum

DevOps最佳做法,第7部分 内容系列: 此内容是该系列的第8部分#:DevOps的最佳实践,第7部分 http://www.ibm.com/developerworks/library/?series_title_by=DevOps+best+practices 请继续关注本系列中的其他内容。 该内容是该系列的一部分: DevOps最佳实践,第7部分 请继续...

cusi77914的博客 515
上一篇: MacOS 10.15不再支持32位应用程序。 你能做什么?
下一篇: ca pki_PKI权力下放:提高安全性的建议方法
cullen2012
博客等级 码龄11年 38粉丝 0原创
评论
成就一亿技术人!
拼手气红包6.0元
还能输入1000个字符  | 博主筛选后可见
 
 条评论被折叠 查看
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值