Methods of Project Management

by Vox Guo  翻译 warton (出处不详)

This article is not called methodology but methods, because it concentrates on the specific ways used in the software development procedure. It focuses more on practical applications than on academic analysis. But as you all known, these conclusions are based on the past project experience and my personal feeling. So it is not confusing if there are some errors. Any further discussions and suggestions, therefore, are welcome. 

本文并未起名为方法学,而是叫做方法,因为这里集中讲述的是软件开发过程中被使用到的一些具体的方法。相对于理论分析而言,本文多集中于讲述应用软件开发实践。但是正如你所知道的那样,这些结论是基于过去的工程经验和我个人的感触。所有,请不要被我的文章搞胡涂了,如果这里有些错误的话。因此,任何近一步的讨论和建议都是欢迎的。

1.        Overview
For the software development procedure, the most pivotal factor is controllable. A disordered project directly causes high cost, prolonged developing period and finally low-quality software product. Of course that is not the result that we would like to see. 

1.   概述

对于软件开发过程,最关键的要素是可操控性。一个混乱的项目直接导致高费用、拖延的开发时段和低质的软件产品。当然这并不是我们想看到的结果。

In my opinion, when a project finishes, we need not only a stack of software, but also little maintenance (means high quality) and a bridle-wise team and a heritable developing procedure. Inheriting means accumulation and continuity. That is why many great companies can rapidly issue new products to survive from the competitive market. It is just like the words from a famous scientist, “I have gained so much success. Because I am standing on the shoulder of giant.” 

依我看来,当一个项目结束时,我们需要的不仅仅是一堆软件,而要有更少的维护费用(意味着高质量)和训练有素的团队以及可继承的开发过程。继承意味着积累和连续性。这也是为什么那么多大的公司能够快速发行他们的新产品以幸免于市场的竞争。这就像著名科学家(newton 译者注)讲的那样,“我之所以取得成功,是因为我站在巨人肩膀上的”。

For those developing little-sized companies, it is not worthy to manage software project entirely according to procedure of CMM (Capability Maturity Model for Software), because the cost is so high that these companies will lose their flexibility. Software developing, however, should conform to some basic rules for software quality management. It is helpful for the quality of final product.

对于那些小型开发公司,完全依据CMM(Capability Maturity Model for Software 软件能力成熟度模型)来管理软件项目是不值得的。因为这样的花费太大,以致于公司将失去它们的韧性。为了软件质量管理,软件开发无论如何应该遵守一定的基本规则。这将对于后期的产品质量很有帮助。

If I am asked to describe the project management using only one sentence, I’d like to say it is controllable procedure. What I mean is that the quality and schedule should be controllable whichever software phase you are in. 

如果我让我用一句话来描述项目管理,我想说它是一个可管理,可操控的过程。我其实也就是说,无论在软件开发的那个阶段,质量和进度都应该是可控制的。

2. Tips for Software Developing
Herein I list some tips for software developing. As the background and habits are different, these tips probably are not available to every person. But if these tips will bring you some further thoughts, I think they are valuable.

2.软件中开发的一些提示

于此我为软件开发列出一些提示。由于背景和习惯的不同,这些提示可能并非对任何人有效。但是如果这些提示能带给你某些深入的思考,我想它们是有价值的。

2.1 Software Estimation

The working-out for any plan is based on the software size. In case we grasp the software size and architecture cognition for software project, we can originally arrange the manpower resources and schedule. This arrangement must not be accurate. As the software developing procedure goes along and the understanding deepens, however, software estimation will become more and more accurate and also the plan arrangement will press close to practical case.

2.1软件预算

任何计划的制订(working-out)都是基于软件大小。一旦我们抓住了对项目的软件大小和构架的理解,我们就能初步安排人力数据和进度。这种安排不必精确。当软件开发过程推进,理解加深之后,无论如何,软件预算将变得越来越精确并且计划安排将。。。。

In the initiation phase of software project, we should carry out the first software evaluation. The software project can be divided into some correspondingly independent functional modules (note: the modules are different from those modules defined in HLD phase). Functional points of every module should be nailed down. According to these functional points, we can evaluate the size of the module through our software common sense (note: some methods are provided by software engineering). Meanwhile we can also realize which module is most difficult and which module is most significant. Once we have these data, our rudimentary manpower resources and schedule are not far from us. At the same time, we can keep our eyes on those difficult and significant modules on which more resources are used.

在软件项目的初始阶段,我们应该实施第一次软件软件评估。软件项目可以被分解成一些功能相对独立的功能模块(注意:这里的模块不同于那些在HLD阶段中被定义的模块)。其间,我们也能认识到哪个模块是最难以及哪个是最重要的。一旦我们有了这些数据,我们根本的人力数据和进度就离我们不远了。同时,我们可以保持我们的眼光在这些困难和重大模块之上,也就是那些投入较大的资源地方。

At the end of every software development phase, such as SRS and LLD, we should re-estimate our software size and adjust our project plan. In fact it is a review procedure to the project plan. The advantages of this review are to make good use of our project resources and find the existing problems in the project. Only through these continuous updates, can the project plan really direct our developing activities. Otherwise it will become a piece of useless white paper with the project going on. Then you will feel that the schedule is always controlled in your hand. Of course, it is a very pleasant feeling. 

在每一个软件开发阶段的结束,正如SRS和LLD,我们可以重新评估软件的规模并调整我们的项目计划。实际上这是一个项目计划的回顾过程。这种回顾的优点是更好地使用项目资源和发现存在的项目问题。仅仅通过这些持续的更新,项目计划真的能指引我们的开发行为。否则,随着项目的进行,这将变成一块没有使用的白纸。于是,你会感觉进度总是在你的掌控之下。当然,这是一种非常令人愉快的感觉。

2.2 Discussion and Review 

Software development is a team project. So we think that team spirit is very important, even it is a key to the success of the project. Usually there is not so much time left to software project because of market competition. Every project manager, therefore, should pursue doing a thing well in one time. Discussion and review are good ways to reach that goal.

2.2 讨论和评审

软件开发是一个团队项目,所以我们认为团队精神是非常重要的,甚至它是关键项目成功的一个关键。一般由于市场竞争我们没有足够的剩余时间留给软件项目。因此,一个项目经理,在任何时候应该追踪正在做的事情。讨论和评审是通向目的非常好的路径。

A good project must have a good developing procedure. It is document that reflects this good developing procedure. How can we finish top-quality documents in limited time? I think there are three significant factors. First of all, before you begin to write, discussion among related team members is required. This discussion includes not only technical problems, but also some details such as document style. Once these problems are solved by the team, the following work is only documental work which is a piece of cake. Secondly, in the process of writing document, if you find new problems that you can’t understand or you think the previous design is wrong, please don’t hesitate to put forward these problems to discuss with your colleagues. Through this continuous discussion, we can converge the wisdoms of all the team members to assure there are few errors left in the final document. With the project going on, our understanding will deepen. Then we maybe find some ignored sectors which will influence our design. So the third factor to get top-quality documents, I think, is the review and upgrade of the finished document whenever we have new findings. 

好的项目必须有一个好的开发过程。它是一个反映好的开发过程的文档。我们如何在有限时间内完成高质量的文档?我想有三方面的重大因素。第一,在你开始写之前,和相关的团队成员讨论是必要的。这种讨论不仅包括技术问题,而且还包括如文档风格等细节问题。一旦这些问题被团队解决了,接下来的文档工作只是小菜一碟。第二,在写文档的过程中,如果你发现新的问题,而你不能理解或者你认识先前的设计是错误的,请毫不犹豫地把这些问题拿出来和你的同事讨论。通过这种持续的讨论,我们可以会聚所有团队成员的智慧以保证在最终的文档中出现更少的错误。随着项目的进行,我们的理解也加深了。于是我们可能发现一些被忽略了的部分,这些将影响我们的设计。所以无论何时,只要我们有了新的发现,以获得高质量的文档,我想第三种因素──评审和更新已经结束的文档是很有必要的。

Undoubtedly, for a limited-period project, discussion and review mean abundant cost of time and it is not easy to arrange in most cases, especially in case of work occurring synchronously. The key to resolve the problem is elaborate partition for time and manpower. Giving an example, if we have some documents to review next week, it is reasonable to finish arrangement in this weekend. This arrangement includes attendees, time, sites and duration of every review. Only through this careful arrangement, can we avoid conflict of review. Usually before the formal review, we leave time to team members to prejudge the review content. In the review meeting, in order to save time, the only aim is finding problems, not solving problems. Further discussion should be held after the review meeting. Meanwhile we should adopt some steps to trace the problems found on the review meeting to avoid missing. 

无庸置疑,对于一个时段限制的项目,讨论和评审意味着你要花费大量的时间,并且在某些情形下这不易于安排,特别是在工作同时变故的情况下。关键的解决这人问题的方法是把时间和人力精心划分。给个示例,如果我们下周有一些文档需要评审,那么理所当然应该在本周末完成安排。这种安排包括评审的参与者、时间、地点和持续时间等。只有通过这种仔细的安排,我们才能避免评审冲突。通常在正式评审之前,我们应该留出时间给项目组成员来预告判断评审的内容。在评审会议上,为节省时间,唯一目的是发现问题,而不是解决问题。深入的讨论应当被在评审会议之后举行。其间,我们应该采取措施来跟踪在评审会议上被发现的问题以避免缺失。

It is worth using plenty of time on discussion and reviews, because many personal errors are exposed in discussion and reviews. At the end of our project, we find that the value of discussion and reviews is incredible. Additionally, through this continuous communication and cooperation, we know each other better and the effectiveness of the team has been strengthened. 

花费大量时间来讨论和评审是有价值的,因为许多人个错误会在讨论和评审中被暴露出来。在项目结束时,我们发现讨论和评审简直令人难以置信。另外,通过这种持续的交流与合作,我们对彼此的了解更多了些并且团队的效力也被加固了。

2.3 Venture Management

Venture occurs everywhere. In the process of software developing, we will meet many difficulties and we will indeed try our best to overcome them. On the other hand, we still need to forecast the ventures we will encounter in the future and take action to decrease the influence of those potential ventures. This is the concept of venture management.

2.3风险管理

风险到处都有。在软件开发阶段,我们会遇到许多困难,并且我们应该真正尝试克服它们。另一方面,我们仍然需要预见我们未来可能发生的风险,并采取行动来减少这种潜在风险对项目的影响。这就是风险管理的概念。

For a software project, the most serious venture is manpower. Most projects are divided into different functional modules managed by individual engineer. Can you imagine some engineer leave the company suddenly? To avoid catastrophic sequent, manpower backup plan should be initiated in the beginning phase of software project.

对于一个软件项目,最严重的风险是人力资源问题。大多数项目被分割为由单独的工程师管理的功能模块,你能想象某一个工程师的突然离去对公司造成的影响吗?在软件项目的开始阶段,为避免灾难的接肿面至,人力后备计划应该被发起。

How can we process manpower backup plan in case of lacking engineers, which is occurring in many companies? Although we have no way to make some engineers backup the other engineers, it is possible that some engineers are partly in charge of other modules. At least they must understand the basic principle of other modules. This thought can be realized in the process of discussion and review if we make management reasonably. If one engineer is selected as a candidate to a module, he should take part in all the discussion and review related to this module. That is to say he is relative to this module. When a project manager lays a course, therefore, he should consider this relationship. As long as we stick to this method, that engineer or more engineers will be familiar with that module which is not in the scope of his or their charge essentially. As a result, even if this venture becomes reality, the project can survive more smoothly. 

假如缺少工程师,我们如何处理人力后备计划?这在很多公司正在发生。尽管我们没有办法让一些工程师作为另一些的后备,让某些工程师部分掌控其它模块也是可能的。至少,他们一定能理解别的模块的基本原理。如果我们做到适当的管理,这种想法可以在讨论和评审的过程中实现。如果一个工程师被选为一个模块的后选人,他应该参与到所有关于这个模块的讨论和评审之中。也就是说,他与这个模块有关系。因此,当一个项目经理布置一个过程,他应当考虑这种关联。只要我们坚持这种方法,那个工程师或都更多的工程师将熟悉那个本来不属于他们掌管的模块。结果,即使这种风险变为实事,项目也可以更平稳地生还。

There are other ventures beside manpower, such as lab equipment, tool software and test environment. All these ventures should be recorded and traced. Meanwhile the project should have a plan to reduce the effect of the ventures. While one venture disappears, the record related to this venture should be closed. At the end of every developing phase, project manager should call a meeting to discuss which venture we will probably meet in the next phase. It is just like a saying, “Although it does not rain, we should get the umbrella ready. ” 

除出人力,还有很多其它的风险,比如实验设备,工具软件以及测试环境。所以这些风险应该被记录和追踪。其间,项目应该有一个计划来减少这种风险的影响。当一个风险过去之后,这个风险的记录应该被关闭。在每一个开发过程的结束,项目经理应该招开一次会议讨论哪个风险可能会在下一阶段发生。这就是说,“即使没有下雨,我们也应该准备好雨伞”。

3. Epilogue

There are many factors determining the success of a software project. After all person with ability is the most important resource in a company. For most companies, we think that controllable and regular developing procedure is also an essential condition. Efficiency from the combination of person with ability and fine developing procedure will be incredible.

结语

决定软件项目的成功的因素很多。毕竟,在一个公司有能力的人是最重要的资源。对于大多数公司来说,我想那种可操控,规范的软件过程也是一个基本条件。来自人才的联合和好的开发过程的功效将是令人难以置信的。

软件项目管理 5.2.任务分解方法 【公众号 “项目管理研究所” 将会第一时间更新文章并[分享行业分析报告]】 归档于软件项目管理初级学习路线 第五章 软件项目任务分解 《初级学习路线合集 》 前言 大家好,这节我们学习软件项目管理—任务分解方法。介绍类比,模板参照,自上而下,自下而上的WBS任务分解方法、 一、类比方法 有些项目有相同或相似的周期,因此而形成的相同或相似的工作细目,那么这些项目进行任务分解的时候,可以采用类比的方法。 二、模板参照 如果某项目有可以参照的WBS模板,例如这个图就是用项目可以参照的WBS模板,在进行任务. 阅读详情

相关推荐

33、软件项目管理方法:Scrum、传统方法与敏捷方法的对比分析

本文深入分析了软件项目管理中的几种主流方法,包括 Scrum(敏捷框架)、传统方法中的 Function Points 和 UDP,以及敏捷方法的适用性与特性。通过对测量粒度、控制程度和适用场景的对比,探讨了不同方法在应对项目不确定性和变化中的表现。文章还详细分析了敏捷方法在处理加急请求方面的优势,并结合统计过程控制理论对各种方法进行了综合比较。最后,文章提供了选择合适方法的决策框架,帮助团队根据项目特性、团队能力和市场环境做出科学决策。

sql99的博客 142

项目管理软件的技巧和使用方法

优秀的项目经理,总能利用一切资源带领团队做出最佳效果。他们能跟踪项目每一步,能实时了解所有动态,会计划效果,会鼓舞人心,也会解决问题。不得不提到一些厉害的项目经理,不再像过去一样,大会小会随时开。那他们是怎么选择适合公司的软件呢?

TCloud95的博客 1516

11、软件项目管理:工具、方法与结构解析

本文深入探讨了软件项目管理的重要性及其实用工具,包括传统与敏捷方法的结合使用。文章详细解析了产品分解结构(PBS)、甘特图和看板等工具的应用及其与需求工具之间的联系,并强调了团队协作在项目管理中的关键作用。无论是学生还是项目管理从业者,都能从中获得提升项目成功率的方法和启示。

a3b4c5的博客 77

软件开发项目如何管理

团队协作和沟通是项目管理中非常重要的一个方面,它可以促进团队成员之间的合作和知识共享,提高团队效率和效果。持续集成和持续交付是一种自动化的软件交付方式,通过频繁地集成和测试代码,确保软件质量和稳定性,同时缩短交付周期。1、项目计划:制定项目计划,确定项目的目标和范围,制定时间表和预算,并确定项目的关键要素和风险因素。5、项目改进:对项目过程和结果进行评估,识别成功因素和改进机会,并采取措施改进项目管理能力和效率。2、项目组织:组建项目团队,明确团队成员的职责和角色,并提供必要的培训和支持。

weixin_62658761的博客 1705

项目文档管理指南和管理方法

文档范围是指《工程实施指南》中规定的项目交付成果中所涉及的文档,也包括在项目实施过程中所产生的不在《工程实施指南》中规定之列的有关文档(包括临时过渡性文档)。 文档管理员即是对文档的变化进行跟踪管理的专职人员。该专职人员由“XXX系统”集成商委派。考虑到文档是重要的成果资料,在软件的生命周期内其维护具有不断延续性,且是一个动态的跟踪过程。建议甲方也能委派一名专职文档管理员协助“XXX系统”集成商的文档管理人员共同对文档进行管理。 文档的版本控制是基于配置管理工具而言的,是文档动态演进过程中配置工具的内部版本标识。 文档备份是文档管理的一个重要环节。万一文档库崩溃,备份是恢复文档库的唯一途径。

软件项目管理方案(完整版).pdf

软件项目管理方案(完整版).pdf软件项目管理方案(完整版).pdf软件项目管理方案(完整版).pdf软件项目管理方案(完整版).pdf软件项目管理方案(完整版).pdf软件项目管理方案(完整版).pdf软件项目管理方案(完整版).pdf软件项目管理方案(完整版).pdf

第五章软件项目风险管理

一、学习的目的与要求 进行合理的风险管理、制定及时的风险计划是预防软件项目失败的一种重要手段; 了解软件项目中存在的风险; 掌握集中常用的风险识别方法、风险评估方法 理解风险规划的主要内容 二、学习内容 1. 软件项目风险管理概述(重要) 1. 风险 目标 损失 或然 2. 软件风险 3. 软件项目风险管理 4. 软件项目风险管理的意义 2. 风险识别(重点) 1. 风险识别依据 2. 常见软件风险 人力资源风险 需求风险 项目接口风险 设计风险 管理风险 开发过程风险 项目集成与测试风险

qq_38085704的博客 4827

deepfacelab下载安装及训练(小白篇),以及导出SAEHD为dfm文件,解决broken pipe问题

其中如果用的是RTX30系列显卡的话,需要把WIN10升级到20H4或更新版本,然后打开硬件加速,不然会出现训练时一直卡在第一个迭代不动了,我的服务器版本为22H2,符合。支持WIN10,win11,WIN7,LINUX,不支持mac(因为mac不支持NVIDIA显卡)

caoyongsheng的博客 3967

不可不知的项目管理策略:十大方法论深度剖析

​ 深入了解项目管理的十大方法论,包括敏捷、六西格玛、看板等,并探讨它们各自的优势和适用场景。本文为您提供全面的指南,帮助您选择最适合您项目和团队的方法论,提升工作效率和项目成功率。

柚橙论 3231

LangChain4j 开发

市场上主流的 Java 调用大模型的工具库有两种:LangChain4j 是一个 面向 Java 的开源框架,用于构建 基于大语言模型(LLMs) 的应用程序。它是 LangChain(Python 生态中非常流行的 LLM 应用框架)的 Java 实现,旨在让 Java 开发者能够轻松地集成和使用各种 LLM 服务,快速开发 智能聊天机器人、智能搜索、文档问答、Agent系统 等 AI 驱动的应用。官网文档:https://docs.langchain4j.dev/。引入依赖(JDK17 及以上): 构建

m0_62943934的博客 2803

IPMItool 控制风扇转速

然后手动设置风扇,最后一位0x1e为设置30%的转速(16进制)。最后4位 0x0f 表示15%,0x0a,表示10%,不建议小于10%,因为10%已经很静音了 如果再小怕不能控温,烧毁硬件。首先停止服务器的自动风扇控制,最后一位0x00表示停止自动风扇控制,0x01为开启自动风扇控制。首先开启主板上的ipmi 设置好 用户名密码。此过程可以在网上搜索,有很多的资料可以参考。解压只有在目录里面有ipmltool。下面是一些常用的修改温度命令。

m0_37970303的博客 5072

软件项目管理方法和工具

作者:林锐  2007-11-231. 为什么需要软件项目管理方法和工具   软件开发和项目管理是软件企业最主要的工作,两者相辅相成,缺一不可。项目管理应当覆盖整个软件开发过程。软件项目管理的主要工作有:立项与结项、项目规划与监控、风险管理和变更管理、需求管理、质量管理、软件配置管理等。软件开发的主要过程域有:需求开发、软件设计、软件实现、软件测试、软件发布、客户验收、软件维护等。  

xinzang2009的专栏 1150

Cryptomatte For Nuke的安装

进入官网https://github.com/Psyop/Cryptomatte,下载文件代码。 将Cryptomatte/nuke里的文件内容复制粘贴到 .nuke文件夹内。 在我们复制粘贴的内容中可以看到两个文件。 同时,我们进入nuke的下载目录,打开plugins文件夹,看到和插件中一样python文件——init.py和menu.py。 我们将Cryptomatte里的init.py和menu.py里的python代码复制粘贴到Nuke/plugins下的init...

qq_41627587的博客 9072

软件项目管理方法发展历史与适用场景分析

软件项目管理方法随着技术进步和市场需求不断演进,从传统的瀑布模型发展到现代的敏捷和DevOps方法。本文将系统介绍主要项目管理方法的发展历程、核心特点及适用场景。

一起探索IT的世界 1085

手把手教你玩转CPU微架构专栏--​​​​1.5 工具准备:用Gem5模拟器“看见”微架构(安装、基础仿真命令)​

本文介绍了如何使用Gem5模拟器进行微架构学习和实验。Gem5是一款支持多种指令集的开源微架构模拟器,可模拟CPU流水线、缓存等核心组件。文章详细说明了在Ubuntu和macOS上安装Gem5的步骤,包括依赖安装、源码编译和验证方法。通过一个简单的加法指令测试程序,演示了如何运行基础仿真并解读输出日志,包括指令执行流程和性能统计数据。此外,还提供了两个实战实验:修改L1缓存大小和观察分支预测失败,帮助读者理解微架构参数对性能的影响。最后指出Gem5是学习微架构的"显微镜",能直观观察指令

xiaoheshang_123的博客 144

2025年上半年第1批信息系统项目管理师论文真题解析与范文

文章首先分析了项目经理在交付绩效域中应关注的重点领域,然后按照项目管理五大过程组顺序,阐述了各过程组中与交付绩效域协同的绩效域及协调目标,最后制定了各过程组中交付绩效域的测量指标。本项目的实践表明,系统化的交付绩效管理不仅能保证项目成功,还能创造超出预期的业务价值。需要结合具体项目案例,按照五大过程组(启动、规划、执行、监控、收尾)顺序,分析各过程组中与交付绩效域协同的其他绩效域及其协调目标。价值交付连续性:建立敏捷交付机制,将项目分解为12个迭代周期,每周期交付可验证成果,确保价值持续流动。

Programming Talk 825

软件工程 chap-8 软件项目管理方法

软件项目管理方法软件度量软件计划和进度控制人力资源管理软件质量保证软件风险管理软件配置管理 软件度量 度量:提供了一个产品过程的某个属性的程度、数量、尺寸、容量等的定量指标 度量范围:一般涉及到软件成本、工作量、生产率、质量、可靠性、性能、结构和复杂性等方面 软件特征量:软件规模、开发成本、开发期限、开发工作量、软件质量 面向尺寸的特征量 – 每KLOC(千行编码)的错误数 – 每KLOC的缺陷数 – 每KLOC的文档页数 – 每KLOC的成本 – LOC (行编码) /人-月 面向功能的特征量 计算功能点

terae的博客 450

笔试题-2023-乐鑫-数字IC设计【纯净题目版】

笔试题-2023-乐鑫-数字IC设计【纯净题目版】

w0shishabi的博客 1782

软件项目管理指南:定义、5大过程、估算及进度管理方法等

本文将分享:1、软件项目管理的定义;2、软件项目管理的过程步骤;3、软件项目管理的内容;4、软件项目估算与进度管理方法;5、软件开发各生命周期阶段与文档、角色间的关系;6、软件开发项目中的各大角色职能;7、软件项目的实施阶段包括哪些。

柚橙论 6196

openmediavault(OMV) (1)安装部署

EXT3(Third Extended File System): EXT3 是 Linux 中广泛使用的日志文件系统,是 EXT2 文件系统的升级版本。这里可以根据自己的需求进行设置,目前只设置了自动登出为1天,为方便后续配置使用,其他设置可根据自己的具体需求进行设置。通过cd 命令进入到我们的raid存储中,通过ls发现里面没有任何的数据,因为我们的raid存储中还未创建任何数据。我的系统要安装在100G的磁盘上,故选择100G的磁盘,实际可以根据具体情况选择。

Monster✺◟(∗❛ัᴗ❛ั∗)◞✺的博客 2175

C# WinForm 基于DirectShow.dll编写的程序,可边预览边保存视频,音频和图片

基于微软的DirectShow.dll的二次开发1.自动识别连接的摄像头跟麦克风且可以对其进行选择(默认选中第一个)2.可录制wmv和avi两种格式的视频并且都带有音频,avi可以录制的分辨率和帧数进行选择,wmv默认进行了淸晰度优化如不喜欢可去除代码中有相关提示3.可在预览点开之后进行拍照,也可边录制视频边拍照4.添加了视频和音频的压缩功能(酌情使用)这次二次开发发现C#对DirectShow的相关信息太少,这次做完也不敢藏私共享出来,还望大家指正

IFPUG功能点估算方法使用指南:提高软件项目管理效率的利器

IFPUG功能点估算方法使用指南:提高软件项目管理效率的利器 【下载地址】IFPUG功能点估算方法使用指南 IFPUG功能点估算方法使用指南为软件项目管理、开发和测试人员提供了全面的功能点估算指导。文档详细介绍了IFPUG方法的基本概念、估算步骤及实际应用案例,帮助用户准确评估软件项目的规模和复杂性。通过结合实际项目情况...

gitblog_06770的博客 862

贝叶斯统计 [韦来生编]

贝叶斯(Bayes)统计是近几十年来迅速发展起来的数理统计的一个重要分支。贝叶斯方法与经典统计方法的主要不同之处是进行统计推断时除了利用样本信息外,还要利用参数的先验信息,因此可以提高统计推断或统计决策的效果。它在经济、金融、生物、医学、自然科学和社会科学等许多领域具有广泛的应用。贝叶斯方法的研究已渗透到了统计学的几乎所有领域。作者在给中国科学技术大学概率论与数理统计专业本科生开设的“数理统计”课程中有一章专门讲授“贝叶斯方法和统计决策理论”,近十年来也给中国科学技术大学概率统计专业研究生开设过几次“贝叶斯分析”课。本书是在对过去讲稿的内容作了适当的增减和调整的基础上完成的。  本书共分六章。第1章是绪论,介绍了贝叶斯统计的若干基本概念,同时对必要的数理统计的基础知识有重点地作了回顾。第二章介绍了确定先验分布的若干可供选择的方法。第三章介绍了几类常见统计模型参数的后验分布的主要结果和计算方法。第四章和第五章分别介绍了“贝叶斯统计推断”和“贝叶斯统计决策”的内容。第六章介绍了贝叶斯统计计算的若干方法,包括蒙特卡洛方法和马尔可夫链蒙特卡洛(MCMC)方法以及相关统计软件的简介。本书的每一章附右大量的例题和习题,书末附有常用的几个表格和部分习题解答供读者查用。  大约可在54学时内讲授本书的第1章至第六章的主要内容,教师可根据学时需要选讲本书第1章至第六章的部分内容。书中标“*”号的章节可略去不讲,留给读者作为阅读材料。第六章例题中的R代码和部分例题的数据文件等可从作者个人主页下载。  作者在编写本书的过程中参考了J.O.Berger教授的《统计决策论及贝叶斯分析》和茆诗松教授编写的《贝叶斯统计》等书中的一些内容,以及《贝叶斯分析》一书中由张伟平博士编写的有关贝叶斯统计计算的一些内容。在此表示衷心感谢。  本书编写准备过程中,中国科学技术大学统计与金融系的几个研究生帮助完成了本书部分中文的录入和排版,作者对他们的辛勤工作表示真诚的感谢。高等教育出版社为本书的出版给予了大力支持。在此一并致谢。

02.软件项目管理与敏捷方法——<<PMBOK Guide>>到敏捷方法的映射笔记

02.软件项目管理与敏捷方法——&lt;&lt;PMBOK Guide&gt;&gt;到敏捷方法的映射笔记 00.一种新的学说要经理三个阶段。首先是它受到攻击并且被声称是荒谬的;然后它得到了承认,被认为是正确的、显然的,但确实无关紧要的。最后它真正的重要性得到承认,它的敌人声称因为发现它而感到荣耀。——William James   01.当你改变...

艾小小雨的博客 337

蓝牙模块HM-10手册

蓝牙模块HM-10手册,该手册对蓝牙模块HM-10进行了详细的介绍和使用方法以及一些AT指令。

jdk-8u144-linux-x64.tar.gz.

该资源为搭建Linux系统Java环境用,资源的后缀为tar.gz格式的压缩包

包干到户是最好的软件项目管理方法

“包干到户”与软件项目管理有嘛关系?“包干到户”如何应用到软件项目管理上,它的挑战是什么?

安晓辉生涯——聚焦程序员的职业规划与成长 7390
上一篇: sniffer技术原理及应用,包括编程方法和工具使用
下一篇: Apache2.2+ PHP5.14+Zend3.01+MySQL 5.0.22+tomcat5.5.17+Axis安装配置
warton
博客等级 码龄25年 61粉丝 35原创
评论 2
成就一亿技术人!
拼手气红包6.0元
还能输入1000个字符
 
 条评论被折叠 查看
添加红包

请填写红包祝福语或标题

个

红包个数最小为10个

元

红包金额最低5元

当前余额3.43元 前往充值 >
需支付:10.00元
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付元
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值