Interstate 75 in Georgia
I-75 highlighted in red | ||||
| Route information | ||||
| Maintained by GDOT | ||||
| Length | 355.11 mi[1] (571.49 km) | |||
| Existed | August 14, 1957[2]–present | |||
| NHS | Entire route | |||
| Major junctions | ||||
| South end | ||||
| North end | ||||
| Location | ||||
| Country | United States | |||
| State | Georgia | |||
| Counties | Lowndes, Cook, Tift, Turner, Crisp, Dooly, Houston, Peach, Crawford, Bibb, Monroe, Lamar, Butts, Spalding, Henry, Clayton, Fulton, Cobb, Cherokee, Bartow, Gordon, Whitfield, Catoosa | |||
| Highway system | ||||
| ||||
| ||||
| ||||
Interstate 75 (I-75) in the US state of Georgia travels north–south along the U.S. Route 41 (US 41) corridor in the central part of the state, traveling through the cities of Valdosta, Macon, and Atlanta. It is also designated—but not signed—as State Route 401 (SR 401).
I-75 is the only Interstate to traverse the full length of the state from north to south, from the flat Atlantic Coastal Plains in southeast Georgia to the rolling mountains of North Georgia. In Downtown Atlanta, I-75 runs concurrently with I-85 as the Downtown Connector. The segment from SR 49 in Byron to I-16 in Macon is part of the Fall Line Freeway and may be incorporated into the eastern extension of I-14, which is currently entirely within Central Texas and is proposed to be extended to Augusta.
What would become the general routing of I-75 in Georgia was initially used by the western routing of the Dixie Highway beginning in 1916. Established in 1926, the Interstate's direct predecessor in Georgia is US 41, a national highway that has been largely supplanted in favor of the federally-funded freeway built under the Interstate Highway System—though limited-access elements of the Interstate existed as early as 1951. The last section of I-75, located in Georgia, opened in 1977.
Route description
[edit]With a length of 355.1 miles (571.5 km), I-75 is the longest Interstate Highway in Georgia.[1] It enters the state near Valdosta, and it continues northward through the towns of Tifton and Cordele until it reaches the Macon area, where it intersects with I-16 eastbound toward Savannah. For northbound traffic, I-475 provides a relatively straight bypass west of that city and I-75's route.
After Macon, I-75 passes the small town of Forsyth. The freeway reaches no major junctions again until in the Atlanta metropolitan area. The first metropolitan freeway met is I-675, then followed by the Atlanta "Perimeter" bypass, I-285. It crosses inside the Perimeter and heads north several miles toward the Atlanta city center. I-75 then runs concurrently with I-85 due north over the Downtown Connector through the central business district of Atlanta. The two Interstates intersect I-20 in downtown. Several miles north of the I-20 interchange, the two Interstates split, I-75 heads in a general northwest direction while I-85 heads northeast, crossing outside the I-285 Perimeter and heading toward the major suburban city of Marietta. This section of I-75 just north of I-285 has 16 through lanes, making it the widest roadway anywhere in the Interstate Highway System.[3] North of Marietta, the final major junction in the Atlanta metropolitan area is the I-575 spur. I-75 then traverses the hilly North Georgia terrain as it travels toward Chattanooga, Tennessee.
The 190-mile-long (310 km) section of I-75 from the northern I-475 intersection to the US 11/US 64 intersection in Ooltewah, Tennessee, is one of the longest continuous multi-state six-lane freeways in the US (some segments along this corridor have as many as 16 lanes).[citation needed]
Due to recent lane widening in southern Georgia completed in 2011,[4] the only four-lane section of I-75 in Georgia is bypassed by six-lane I-475; along this route, there are at least six lanes from the Alligator Alley portion of I-75 in Naples, Florida, to a portion of I-75 in Ooltewah (except a four-lane overpass on I-475 over a railroad track in Macon).
I-75 is the only Interstate to traverse the full length of the state from north to south. The entire length of I-75 in Georgia is part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense.[5][6][7][8][9][10][11]
Services
[edit]The Georgia Department of Transportation operates two welcome centers at both ends of Interstate 75 and nine rest areas, the most of any interstate highway within the state. The northbound welcome center is located between exits 2 and 5 [12] The southbound welcome center is located between exits 353 and 350.[13] The other rest areas include two in Cook County, two in Turner County, two in Dooly County, one southbound rest area in Monroe County, and two in Gordon County.[14]
History
[edit]
Early national highways
[edit]The general routing of I-75 within Georgia was originally developed as the western routing of the Dixie Highway. The western route of the Dixie Highway as designated in 1916, followed present-day US 41 south from the Tennessee border through Atlanta and Macon south to Echeconnee, Georgia. The section that would become US 41, I-75's direct predecessor, from Echeconnee south through Perry and Valdosta to the border with Florida was paved beginning in 1919 and was later designated as a part of the Dixie Highway in 1924. In 1926, the western route of the Dixie Highway following the newer Perry and Valdosta route was officially designated as US 41. By October 1929, the majority of US 41 was paved in Georgia, the only sections that were not paved at that point were between Fort Oglethorpe and Ringgold, and another on the south side of Calhoun.[15]
1950s
[edit]The first section of the highway that would eventually become I-75 in Georgia were portions of the Downtown Connector that were integrated into the Interstate Highway System.[16][17] The first section, located between Williams Street and the Brookwood Interchange, began construction in September 1948 and opened on September 25, 1951.[18] By late 1953, this expressway was signed as US 19/US 41 as far north as Lakewood Avenue. It was also under construction to Howell Mill Road, and proposed from this road to the northwest part of Atlanta.[17][19] By mid-1954, the expressway was signed as SR 295 from Lakewood Avenue to University Avenue. It was under construction from the Downtown Connector to US 41/SR 3E, just north of West Paces Ferry Road.[19][20] By mid-1955, the highway was under construction from University Avenue to Glenn Street. It was open from Williams Street to US 41/SR 3E in the central part of Atlanta.[20][21] A 1.4-mile (2.3 km) section between University Avenue and Richardson Street began in March 1955 and was dedicated and opened on July 25, 1957.[22][23] The 0.6 mi-long (0.97 km) stretch from Piedmont Avenue to Williams Street opened on May 5, 1959.[24] On October 9, 1959, a 37-mile (60 km) section in Turner and Tift Counties was dedicated and opened to traffic by Governor Ernest Vandiver. At the ceremony, Vandiver also unveiled the first Interstate Highway shield used in Georgia.[25][26]
1960s
[edit]On September 21, 1962, two separate sections totalling 51 miles (82 km)– from US 84/221 in Valdosta to Ashburn, and from Hahira to Unadilla–opened to traffic.[27][28] On July 15, 1963, the 26-mile (42 km) section between Florida State Road 6 near Jasper, Florida, and US 84/US 221 was jointly opened to traffic in a dedication ceremony at the state line by Georgia Governor Carl Sanders and Florida Governor C. Farris Bryant.[29][30] This completed I-75 from the state line to US 41/SR 7 in Unadilla. On May 27, 1964, the 14-mile (23 km) section between Unadilla and Perry opened to traffic.[31] The final stretch of the Downtown Connector, 2.3 miles (3.7 km) between Richardson Street and Piedmont Avenue, including the interchange with I-20,[32] opened on September 18, 1964.[33][34] On December 8, 1964, the state announced the opening of the 16-mile (26 km) section between SR 53 in Calhoun and US 41 south of Dalton.[35] The 19-mile (31 km) section between US 41/76 in Dalton and the Tennessee state line was announced to have been opened two days later.[36] In 1966, the highway was open from the Florida state line to its southern interchange with I-475 near Macon. It was open from I-16 to US 23/SR 42 near Forsyth. It was open from Forest Park to its northern interchange with I-285.[37] The 6.3-mile (10.1 km) section between SR 140 in Adairsville and SR 53 in Calhoun opened on December 7, 1966.[38][39] The five-mile (8.0 km) section between I-285 and SR 120 in Marietta opened in January 1967.[40][41] On March 6, 1967, the short stretch in Macon between I-16 and SR 247 (Pierce Avenue), along with a short stretch of I-16 extending to Main Street, was dedicated and opened to traffic.[42] The 13.5-mile (21.7 km) section from SR 247 in Macon and Bolingbroke was completed in late April 1967.[43] The 1.8-mile (2.9 km) segment in Marietta between SR 120 and Allgood Road was completed and opened on August 14, 1968.[44] The section between US 23/SR 42 near Forsyth and SR 20 in McDonough opened on November 18, 1968.[45] The section from SR 20 in McDonough to SR 54 in Morrow opened on October 15, 1969, completing I-75 between Macon and Atlanta.[46] It was under construction from US 411/SR 61 near Cartersville to SR 140 in Adairsville.[47] In 1969, the highway was under construction from its southern interchange with I-475 to I-16 in Macon. It was open from I-16 to Allgood Road in Marietta.[47][48]
1970s
[edit]
The southbound lanes of the 12-mile (19 km) stretch between US 411 in Cartersville and SR 140 in Adairsville opened on September 1, 1971.[49] The remainder of this stretch was opened to traffic and dedicated by Governor Jimmy Carter and state highway director Bert Lance on September 30, 1971.[50] Construction on the six-mile (9.7 km) section between the southern interchange with I-475 and US 80/SR 22 in Macon began on May 7, 1969, and was dedicated and opened to traffic on November 24, 1971.[51][52] In 1971, it was open from the Florida state line to Allgood Road in Marietta.[53][54] In 1973, it was under construction from Marietta to SR 92 in Acworth.[55][56] The five-mile (8.0 km) section between Allgood Road and Barrett Parkway (then Roberts Road) in Marietta opened on November 27, 1974, eliminating one of the worst bottlenecks on US 41.[57][58] That year, the highway was under construction from Emerson to US 411/SR 61 near Cartersville.[56][59] The last segment of I-75 in Georgia, located between Barrett Parkway in Marietta and US 411 in Cartersville, was dedicated and opened on December 21, 1977.[60][61]
Since completion
[edit]Much of the work to widen interstates across Atlanta including I-75 from six to eight lanes and the Downtown Connector to 10 lanes including the elimination of sharp curves and grades, left-hand exits, excessive interchanges, and short acceleration/deceleration lanes, took place in the 1980s. Construction began with widening I-285 first, beginning in 1976, continued to the radiating expressways, and concluded with the depressed sections of the Downtown Connector which were completed in 1988. I-75 widening from I-285 and Aviation Boulevard to the Downtown Connector was completed by late 1984. I-75 widening from the Brookwood Interchange to the Chattahoochee River and Cobb County line was widened in the early 1980s and completed by 1985. Work on the Downtown Connector portion began in 1984, and included redesigning the massive interchange between I-20 and I-75/I-85 and the design and construction of 55 bridges over the connector portion alone.[62] The project was completed in November 1988.

In addition to the general-purpose lanes added in the 1980s, provisions for high-occupancy vehicle lanes (HOV lanes) and dedicated onramps at Williams Street, Piedmont Avenue, and Memorial Drive were built and were subsequently converted to HOV usage in 1996 on the Downtown Connector. In 1996, HOV lanes were also added from I-285 on the south side of Atlanta to I-285 on the north side of Atlanta.[citation needed]
In 1998, the portion of I-75 that from the Chattahoochee River north to the Tennessee state line was named the Larry McDonald Memorial Highway.[63] Larry McDonald, a conservative Democratic representative to Congress, was aboard Korean Air Lines Flight 007 when it was shot down by the Soviet Union on September 1, 1983. He was the only sitting Congressperson to be reportedly killed by the Soviets during the Cold War.[citation needed] I-75 was also designated as the Horace E. Tate Freeway between I-85 to I-285 northwest of Downtown Atlanta, in honor of Horace Tate, who was a state senator in 1974.[when?][citation needed]
Until 2000, the state of Georgia used the sequential interchange numbering system on all of its Interstate Highways. The first exit on each highway would begin with the number "1" and increase numerically with each exit. In 2000, the Georgia Department of Transportation (GDOT) switched to a mileage-based exit system, in which the exit number corresponded to the nearest milepost.[64][65]
In March 2007, I-75's HOV ramp serving Northside Drive in Atlanta was the site of the Bluffton University bus crash where 7 out 35 people on board the bus were killed.[66]
The highway had a lane widening project completed in 2011, allowing the entirety of the Interstate in Georgia to be three lanes in each direction.[4] On January 28, 2017, the new Peach Pass-only South Metro Express Lanes from SR 155 to SR 138 and I-675, opened.[67] On September 8, 2018, new Northwest Corridor Express Lanes from the I-285/I-75 interchange to Hickory Grove Road and from I-75/I-575 interchange to Sixes Road have opened, the lanes require a Peach Pass to use.[68]
Future
[edit]The I-75/I-16 interchange is being revamped with extra ramps to and from US 23/US 129/SR 49.[69] GDOT estimates that the final portion of the project will be bid on in 2023.
The segment of I-75 from SR 49 in Byron to I-16 in Macon is part of the Fall Line Freeway and may be incorporated into the eastern extension of I-14, which is currently entirely within Central Texas and is proposed to be extended to Augusta.[70]
Exit list
[edit]Note: exit numbers along Georgia Interstates were renumbered in 1999 and 2000 to be mileage based instead of being sequential.[64][71]
| County | Location | mi[72] | km | Old exit[73] | New exit | Destinations | Notes | |
|---|---|---|---|---|---|---|---|---|
| Florida state line | 0.00 | 0.00 | Continuation into Florida | |||||
| Lowndes | | 1.53 | 2.46 | 1 | 2 | Bellville Fla, Lake Park | Belleville Road | |
| Lake Park | 4.77 | 7.68 | 2 | 5 | ||||
| | 10.58 | 17.03 | 3 | 11 | ||||
| | 12.83 | 20.65 | 13 | Old Clyattville Road – Valdosta | ||||
| Valdosta | 15.91 | 25.60 | 4 | 16 | Southern terminus of unsigned I-75 BL | |||
| 17.94 | 28.87 | 5 | 18 | |||||
| | 21.71 | 34.94 | 6 | 22 | Southern end of US 41/SR 7 concurrency; northern terminus of unsigned I-75 BL | |||
| Hahira | 28.73 | 46.24 | 7 | 29 | Northern end of US 41/SR 7 concurrency | |||
| Cook | Cecil | 32.39 | 52.13 | 8 | 32 | Old Coffee Road – Cecil | ||
| Adel | 37.52 | 60.38 | 9 | 37 | Adel | |||
| 39.26 | 63.18 | 10 | 39 | |||||
| Sparks | 41.42 | 66.66 | 11 | 41 | Rountree Bridge Road – Sparks | |||
| | 44.88 | 72.23 | 12 | 45 | Barneyville Road | |||
| Lenox | 48.66 | 78.31 | 13 | 49 | Kinard Bridge Road – Lenox | |||
| Tift | | 54.96 | 88.45 | 14 | 55 | Eldorado, Omega | ||
| | 59.04 | 95.02 | 15 | 59 | Southwell Boulevard / I-75 BL north – Tifton | Southern terminus of unsigned I-75 BL | ||
| | 60.30 | 97.04 | 16 | 60 | South Central Avenue | |||
| Phillipsburg–Tifton line | 61.26 | 98.59 | 17 | 61 | Eastern terminus of SR 35 Loop | |||
| Tifton | 61.89 | 99.60 | 18 | 62 | ||||
| 62.44 | 100.49 | 19 | 63A | 2nd Street | ||||
| 62.82 | 101.10 | 20 | 63B | 8th Street | ||||
| 64.06 | 103.09 | 21 | 64 | Northern terminus of unsigned I-75 BL | ||||
| | 66.02 | 106.25 | 22 | 66 | Brighton Road | |||
| | 69.28 | 111.50 | 23 | 69 | Chula Brookfield Road | |||
| | 70.89 | 114.09 | 24 | 71 | Willis Still Road – Sunsweet | |||
| Turner | | 75.17 | 120.97 | 25 | 75 | Inaha Road | ||
| | 78.45 | 126.25 | 26 | 78 | ||||
| | 79.71 | 128.28 | 27 | 80 | Bussey Road – Sycamore | |||
| Ashburn | 82.07 | 132.08 | 28 | 82 | ||||
| | 83.95 | 135.10 | 29 | 84 | ||||
| Crisp | Arabi | 91.86 | 147.83 | 30 | 92 | Arabi | ||
| | 96.97 | 156.06 | 31 | 97 | ||||
| Cordele | 98.98 | 159.29 | 32 | 99 | ||||
| 100.75 | 162.14 | 33 | 101 | Southern terminus of unsigned I-75 BL | ||||
| 101.80 | 163.83 | 34 | 102 | |||||
| | 103.86 | 167.15 | 35 | 104 | Farmers Market Road / I-75 BL south | Northern terminus of unsigned I-75 BL | ||
| Dooly | | 109.54 | 176.29 | 36 | 109 | |||
| | 112.07 | 180.36 | 37 | 112 | ||||
| | 116.88 | 188.10 | 38 | 117 | Pinehurst | |||
| Unadilla | 120.81 | 194.42 | 39 | 121 | ||||
| 121.79 | 196.00 | 40 | 122 | |||||
| Houston | | 127.17 | 204.66 | 41 | 127 | |||
| Perry | 133.80 | 215.33 | — | 134 | South Perry Parkway | |||
| 134.86 | 217.04 | 42 | 135 | |||||
| 136.69 | 219.98 | 43 | 136 | |||||
| 138.20 | 222.41 | — | 138 | |||||
| Peach | | 141.86 | 228.30 | 44 | 142 | |||
| | 144.66 | 232.81 | — | 144 | Richard B. Russell Parkway | |||
| | 146.44 | 235.67 | 45 | 146 | ||||
| Byron | 149.69 | 240.90 | 46 | 149 | Southern end of SR 540 concurrency | |||
| Crawford |
No major junctions | |||||||
| Bibb | Macon | 153.75 | 247.44 | — | 153 | Sardis Church Road | ||
| 155.80 | 250.74 | 47 | 155 | Hartley Bridge Road | Collector-distributor lanes on southbound exit and northbound entrance | |||
| 156.81– 156.89 | 252.36– 252.49 | 48 | 156 | Northbound exit and southbound entrance; southern terminus of I-475 | ||||
| 160.07 | 257.61 | 49 | 160A | Signed as exit 160 northbound | ||||
| 160.26 | 257.91 | 49A | 160B | Rocky Creek Road | Northbound exit is via exit 160. | |||
| 162.02 | 260.75 | 50 | 162 | |||||
| 162.84 | 262.07 | 51 | 163 | Eastern terminus of SR 74 | ||||
| 163.98– 164.08 | 263.90– 264.06 | 52 | 164 | |||||
| 165.28 | 265.99 | 53 | 165 | Northern end of SR 540 concurrency; western terminus of I-16, exit 0; Major Bobby Jones MD POW-MIA Interchange | ||||
| 167.02 | 268.79 | 54 | 167 | |||||
| 169.47 | 272.74 | 55A | 169 | |||||
| 171.19 | 275.50 | 55 | 171 | |||||
| 172.64 | 277.84 | 56 | 172 | Bass Road | ||||
| Monroe | | 175.78 | 282.89 | 57 | 175 | Pate Road – Bolingbroke | Northbound exit and southbound entrance; former SR 19 Spur | |
| | 177.96 | 286.40 | 58 | 177 | Southbound exit and northbound entrance; northern terminus of I-475 | |||
| | 180.97 | 291.24 | 59 | 181 | Rumble Road – Smarr | |||
| | 185.53 | 298.58 | 60 | 185 | ||||
| Forsyth | 186.38 | 299.95 | 61 | 186 | Tift College Drive | |||
| 187.45 | 301.67 | 62 | 187 | |||||
| 188.52 | 303.39 | 63 | 188 | |||||
| | 193.75 | 311.81 | 64 | 193 | Johnstonville Road | |||
| | 198.18 | 318.94 | 65 | 198 | High Falls Road | Access to High Falls State Park | ||
| Lamar |
No major junctions | |||||||
| Butts | | 201.31 | 323.98 | 66 | 201 | |||
| | 205.58 | 330.85 | 67 | 205 | ||||
| Spalding |
No major junctions | |||||||
| Henry | Locust Grove | 212.19 | 341.49 | 68 | 212 | Bill Gardner Parkway – Jenkinsburg, Locust Grove, Hampton, Jackson | ||
| | 214.08 | 344.53 | — | 214 | Bethlehem Road to US 23, Locust Grove | Construction on new exit planned to begin in 2024[74] | ||
| | 216.77 | 348.86 | 69 | 216 | ||||
| | 216.00 | 347.62 | — | — | South end of South Metro I-75 Express lanes | |||
| | 218.38 | 351.45 | 70 | 218 | ||||
| | 219.00 | 352.45 | — | — | Northbound exit and southbound entrance | |||
| | 221.35 | 356.23 | 71 | 221 | Jonesboro Road – Lovejoy | Former SR 920 | ||
| | 222.76 | 358.50 | 72 | 222 | Jodeco Road – Flippen | Former SR 351 | ||
| | 224.62 | 361.49 | 73 | 224 | Hudson Bridge Road / Eagles Landing Parkway | |||
| | 228.07 | 367.04 | 74 | 227 | Northbound exit and southbound entrance; southern terminus of I-675 | |||
| Stockbridge | 228.00 | 366.93 | — | — | North end of South Metro I-75 Express lanes | |||
| | 228.61 | 367.91 | 75 | 228 | ||||
| Clayton | | 231.33 | 372.29 | — | 231 | Mount Zion Boulevard | ||
| Morrow | 232.81 | 374.67 | 76 | 233 | ||||
| | 235.04– 235.15 | 378.26– 378.44 | 77 | 235 | ||||
| | 237.61 | 382.40 | 78 | 237 | ||||
| | 238.00 | 383.02 | 79 | Northbound exit only | ||||
| | 238.25 | 383.43 | 80 | 237A | Southbound exit only | |||
| | 238.69 | 384.13 | 81A | 238A | I-285 exit 58 | |||
| | 81B | 238B | ||||||
| Fulton | Hapeville | 239.23– 240.10 | 385.00– 386.40 | 82, 84, and 85 | 239 | Additional ramps for direct HOV lane access to/from C.W. Grant Parkway; Exit 82 (northbound) and 84 (southbound) were to C.W. Grant Parkway formerly Aviation Boulevard and Exit 85 was to US 41. Today, they are all marked as exit 239. | ||
| 239.00 | 384.63 | 83 | — | Frontage Road to Mountain View | ||||
| Atlanta | 242.09 | 389.61 | 86 | 241 | Cleveland Avenue | |||
| 242.65 | 390.51 | 87 | 242 | Southbound exit and northbound entrance; southern end of I-85/SR 295 concurrency; southern terminus of SR 295 | ||||
| 243.27 | 391.51 | 88 | 243 | |||||
| 245.13 | 394.50 | 89 | 244 | University Avenue / Pryor Street | ||||
| 246.18 | 396.19 | 90 | 245 | Abernathy Boulevard / Capitol Avenue – Center Parc Stadium | Northbound exit and southbound entrance | |||
| 246.00 | 395.90 | 90A | — | Georgia Avenue East – Stadium, Grant Park, Zoo Atlanta | Exits 90 A and B were northbound only and replaced in the 1980s by a single exit 90 (currently exit 245) which was moved several blocks south and not given direct access to Georgia Avenue. | |||
| 246.00 | 395.90 | 90B | — | Georgia Avenue West – West End | Exits 90 A and B were northbound only and replaced in the 1980s by a single exit 90 (currently exit 245) which was moved several blocks south and not given direct access to Georgia Avenue. | |||
| 246.53 | 396.75 | 91 | 246 | Fulton Street / Central Avenue – Downtown Atlanta | ||||
| 246.77 | 397.14 | 92 A & B | 247 | I-20 exit 57 | ||||
| 247.15 | 397.75 | 93 | 248A | Martin Luther King Jr. Drive – State Capitol | Southbound exit and northbound entrance | |||
| 247.72 | 398.67 | 94 | 248B | Edgewood Avenue / Auburn Avenue / J.W. Dobbs Avenue | Northbound exit and southbound entrance | |||
| 248.07 | 399.23 | 96 A & B | 248C | Exit 96 A went to Freedom Parkway and exit 96 B went to International Boulevard before the 1980s when they were made into one exit. | ||||
| 248.12 | 399.31 | 95 | 248D | J.W. Dobbs Avenue / Edgewood Avenue / Jesse Hill Drive / Auburn Avenue | Southbound exit and northbound entrance | |||
| 248.52 | 399.95 | 97 | 249A | Courtland Street – Georgia State University | Southbound exit only | |||
| 248.77 | 400.36 | 98 | 249B | Pine Street, Peachtree Street – Civic Center | Northbound exit only | |||
| 248.97 | 400.68 | 99 | 249C | Williams Street – Georgia World Congress Center, Mercedes-Benz Stadium | No northbound exit (only northbound entrance, southbound entrance, southbound exit); additional ramps for direct HOV access: southbound exit and northbound entrance | |||
| 249.04 | 400.79 | 100 | 249D | Spring Street, West Peachtree Street | Northbound exit and southbound entrance | |||
| 249.17 | 401.00 | 100 | 249D | Southbound exit and northbound entrance | ||||
| 249.88 | 402.14 | 101 and 102 | 250 | 10th Street, 14th Street – Georgia Tech | Northbound exit and southbound entrance; no northbound entrance to I-85 north; exit 101 went to 10th Street and exit 102 went to 14th Street before the 1980s. | |||
| 250.22 | 402.69 | 101 and 102 | 250 | 16th Street, 14th Street, 10th Street | Southbound exit and northbound entrance; exit 101 went to 10th Street and exit 102 went to 14th Street before the 1980s. | |||
| 250.58 | 403.27 | — | 251A | 17th Street – Midtown | Northbound exit only | |||
| 250.87 | 403.74 | 103 | 251B | Northern end of I-85/SR 295 concurrency; northern terminus of SR 295 | ||||
| 251.89 | 405.38 | 104 | 252A | Saunders exit 252 southbound | ||||
| — | ⬥ | Southbound exit and northbound entrance | ||||||
| 252.25 | 405.96 | 105 | 252B | Howell Mill Road | ||||
| 254.27 | 409.21 | 106 | 254 | Moores Mill Road | ||||
| 255.50 | 411.19 | 107 | 255 | No access from US 41/SR 3 north to I-75 south | ||||
| 256.60– 256.76 | 412.96– 413.22 | 108 | 256 | Mount Paran Road | Southbound and northbound entrance via US 41/SR 3 | |||
| Chattahoochee River | 257.07– 257.27 | 413.71– 414.04 | Lester and Virginia Maddox Bridge | |||||
| Cobb | | 257.65 | 414.65 | — | 258 | Cumberland Boulevard | ||
| | 257.90 | 415.05 | — | ⬥ | Akers Mill Road | HOV-only ramps for northbound exit and southbound entrance; Express Lane Only ramps for southbound exit or northbound entrance | ||
| | 258.40 | 415.85 | 109A | 259A | Southbound Exit has an Additional Ramp to US 41/SR 3 (Cobb Parkway); I-285 exit 20 | |||
| | 109B | 259B | I-285 exit 20 | |||||
| | 258.60 | 416.18 | — | — | South end of Northwest Corridor I-75 Express lanes | |||
| | 259.98 | 418.40 | 110 | 260 | Windy Hill Road – Smyrna | |||
| Marietta | 261.58 | 420.97 | 111 | 261 | Eastern terminus of SR 280 | |||
| 263.29 | 423.72 | 112 | 263 | Former SR 120 Loop | ||||
| 265.08 | 426.60 | 113 | 265 | Former SR 120 Loop | ||||
| 267.12 | 429.89 | 114A | 267A | Southern terminus of SR 5 Spur | ||||
| | 114B | 267B | Southern end of SR 5 concurrency | |||||
| | 268.71 | 432.45 | 115 | 268 | Northern end of SR 5 concurrency; southern terminus of I-575; southbound exit is via exit 269. | |||
| | 269.46 | 433.65 | 116 | 269 | Formerly Roberts Road | |||
| | 271.19 | 436.44 | 117 | 271 | To north | |||
| Kennesaw | 272.95 | 439.27 | 118 | 273 | Wade Green Road – Kennesaw | |||
| Acworth | 274.20 | 441.28 | — | — | North end of Northwest Corridor I-75 Express lanes | |||
| Cherokee | | 277.19 | 446.09 | 120 | 277 | |||
| Bartow | | 278.48 | 448.17 | 121 | 278 | Glade Road – Acworth | ||
| Emerson | 283.58 | 456.38 | 122 | 283 | Allatoona Road – Emerson | |||
| | 285.27 | 459.10 | 123 | 285 | Red Top Mountain Road | Future northern terminus of SR 113[75] | ||
| Cartersville | 287.82 | 463.20 | 124 | 288 | Current northern terminus of SR 113; future northern terminus of SR 61 Conn.[75] | |||
| | 290.20 | 467.03 | 125 | 290 | ||||
| Cartersville | 293.60 | 472.50 | 126 | 293 | ||||
| | 296.54 | 477.23 | 127 | 296 | Cassville–White Road | |||
| Adairsville | 305.82 | 492.17 | 128 | 306 | ||||
| Gordon | | 310.42 | 499.57 | — | 310 | |||
| Calhoun | 312.44 | 502.82 | 129 | 312 | Calhoun, Fairmount, Rome | Former SR 53 | ||
| 315.26 | 507.36 | 130 | 315 | |||||
| | 317.29 | 510.63 | 131 | 317 | ||||
| Resaca | 318.67 | 512.85 | 132 | 318 | ||||
| 320.29 | 515.46 | 133 | 320 | |||||
| Whitfield | | 325.93 | 524.53 | 134 | 326 | Carbondale Road | ||
| | 328.56 | 528.77 | 135 | 328 | ||||
| Dalton | 333.71 | 537.05 | 136 | 333 | ||||
| 335.96 | 540.68 | 137 | 336 | |||||
| | 341.16 | 549.04 | 138 | 341 | ||||
| Catoosa | | 344.72 | 554.77 | 139 | 345 | |||
| | 348.07 | 560.16 | 140 | 348 | ||||
| | 350.13 | 563.48 | 141 | 350 | ||||
| | 353.70 | 569.22 | 142 | 353 | ||||
| Tennessee state line | 355.10 | 571.48 | Continuation into Tennessee | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| ||||||||
Related routes
[edit]
There are three auxiliary Interstate Highways related to I-75 in Georgia and a fourth that was proposed. I-175 was a proposed spur from Albany northeast to Cordele. The road was built, but not as a freeway; it is SR 300, the Florida–Georgia Parkway. I-475 is a western bypass of Macon, shortening the trip for through I-75 traffic. I-575 is a spur from near Marietta north to Canton and Nelson, and I-675 is a cutoff from I-75 south of Atlanta north to I-285 (Atlanta's perimeter)—east of I-75.
Additionally, there are three business routes of I-75 in the state. The first I-75 Business Loop (I-75 BL) runs through central Valdosta mostly concurrent with US 221. The second I-75 BL runs through downtown Tifton mostly concurrent with US 41, and a third one that runs through Cordele. There was a former I-75 BL in Adel–Sparks.
See also
[edit]References
[edit]- 1 2 Adderly, Kevin (December 31, 2014). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways as of December 31, 2014". Route Log and Finder List. Federal Highway Administration. Retrieved August 4, 2015.
- ↑ Public Roads Administration (August 14, 1957). Official Route Numbering for the National System of Interstate and Defense Highways as Adopted by the American Association of State Highway Officials (Map). Washington, DC: Public Roads Administration. Retrieved June 14, 2018 – via Wikimedia Commons.
- ↑ Federal Highway Administration (January 2004). "Interstate System Facts". Highway Information Quarterly Newsletter. Federal Highway Administration. Archived from the original on September 17, 2008. Retrieved November 26, 2008.
- 1 2 Thompson, Angie (April 8, 2011). "Widening of I-75 now complete". Tifton Gazette. Retrieved June 7, 2020.
- ↑ Federal Highway Administration (May 8, 2019). National Highway System: Georgia (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved August 10, 2019.
- ↑ Federal Highway Administration (May 9, 2019). National Highway System: Valdosta, GA (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved August 10, 2019.
- ↑ Federal Highway Administration (May 9, 2019). National Highway System: Macon, GA (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved August 10, 2019.
- ↑ Federal Highway Administration (May 9, 2019). National Highway System: Atlanta, GA (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved August 10, 2019.
- ↑ Federal Highway Administration (May 9, 2019). National Highway System: Cartersville, GA (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved August 10, 2019.
- ↑ Federal Highway Administration (May 9, 2019). National Highway System: Dalton, GA (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved August 10, 2019.
- ↑ Federal Highway Administration (May 10, 2019). National Highway System: Chattanooga, TN--GA (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved August 10, 2019.
- ↑ Georgia Visitor Information Center - Valdosta
- ↑ Georgia Visitor Information Center - Ringgold
- ↑ Rest Areas (Georgia Department of Transportation)
- ↑ Ed Jackson. "Whatever Happened to Georgia's Dixie Highway?" (PDF). Retrieved June 15, 2021.
- ↑ State Highway Department of Georgia (1950). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved December 27, 2016. (Corrected to August 1, 1950.)
- 1 2 State Highway Department of Georgia (1952). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved December 27, 2016. (Corrected to January 1, 1952.)
- ↑ Joiner, Alex (September 26, 1951). "3,000 Persons See Opening Of $6 Million Expressway". The Atlanta Constitution. pp. 1, 7. Retrieved September 5, 2022 – via Newspapers.com.
- 1 2 State Highway Department of Georgia (1953). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved December 27, 2016. (Corrected to September 1, 1953.)
- 1 2 State Highway Department of Georgia (1954). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved December 27, 2016. (Corrected to June 1, 1954.)
- ↑ State Highway Department of Georgia (1955). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved December 27, 2016. (Corrected to June 1, 1955.)
- ↑ "Griffin Opens New Leg Of Atlanta's Expressway". The Atlanta Constitution. July 26, 1957. p. 15. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ State Highway Department of Georgia (1957). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved December 27, 2016. (Corrected to July 1, 1957.)
- ↑ "Expressway Link Opens Wednesday". The Atlanta Constitution. May 1, 1959. p. 29. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ "Vandiver to Open Interstate Link". The Columbus Ledger. Associated Press. October 8, 1959. p. 52. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ Landry, George (October 10, 1959). "Interstate 75 Is Dedicated". The Macon Telegraph. p. 1. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "I-75 Is Open From Valdosta To Unadilla". The Valdosta Daily Times. September 21, 1962. p. 1. Retrieved August 29, 2026 – via Newspapers.com.
- ↑ "109-Mile Stretch of I-75 Officially Open To Traffic". The Macon Telegraph. October 3, 1962. p. 6. Retrieved August 29, 2026 – via Newspapers.com.
- ↑ "26 Miles of Interstate Route 75 To Be Formally Opened On July 15". The Newnan Times-Herald. July 11, 1963. p. 4C. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ Tyson, Remer (July 15, 1963). "Bryant, Sanders Open New Interstate Link". The Valdosta Daily Times. pp. 1, 2. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "Stretch of Interstate 75 Opens". The Macon News. May 28, 1964. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "Double Shift Possible on Road Link". The Atlanta Constitution. February 28, 1962. p. 5. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ Gaines, Marion (September 19, 1964). "Cars Breeze Along On New Connector". The Atlanta Constitution. pp. 1, 9. Retrieved September 5, 2022.
- ↑ "Connector to Open For Traffic Friday". The Atlanta Constitution. September 16, 1964. pp. 1, 10. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ "New Interstate Link Opened to Traffic". The Columbus Enquirer. Associated Press. December 10, 1964. p. 7. Retrieved August 29, 2026 – via Newspapers.com.
- ↑ "Part of I-75 Opened In Northwest Georgia". The Macon News. United Press International. December 10, 1964. p. 10. Retrieved August 29, 2026 – via Newspapers.com.
- ↑ State Highway Department of Georgia (January 1967). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved December 27, 2016.
- ↑ "Interstate 75 Stretch Opened". The Columbus Enquirer. Associated Press. December 8, 1966. p. 16. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "State Highway Dept. Opens 6.3 Miles of I-75". The Newnan Times-Herald. December 8, 1966. p. 8A. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "Interstate Leg Open by Yule". The Atlanta Journal. December 1, 1966. p. 2. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "5-Mile Link Opens I-75 Into Marietta". The Atlanta Constitution. January 12, 1967. p. 17. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "Ribbon Cut To Open 16-75 Here". The Macon Telegraph. March 7, 1967. p. 1. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "I-75 Paving To Forsyth Is Finished". The Macon Telegraph. April 25, 1967. p. 1. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "'Critical' Mile Of I-75 Due By Aug. 14". The Atlanta Journal. July 22, 1968. p. 5-B. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "Another I-75 Link To Open Monday". The Atlanta Journal. November 14, 1968. p. 16-A. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "Macon-Atlanta I-75 Link Open". The Macon Telegraph. October 17, 1969. p. 8C. Retrieved August 28, 2026 – via Newspapers.com.
- 1 2 State Highway Department of Georgia (January 1969). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved December 27, 2016.
- ↑ State Highway Department of Georgia (January 1970). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved December 27, 2016.
- ↑ "I-75 Traffic South Can Go Length of State—for Awhile". The Atlanta Constitution. September 3, 1971. p. 9-B. Retrieved August 29, 2026 – via Newspapers.com.
- ↑ "Carter to Open Stretch of I-75". The Atlanta Constitution. United Press International. September 30, 1971. p. 5-C. Retrieved August 29, 2026 – via Newspapers.com.
- ↑ "I-75 Crosstown Leg to Open On Nov. 24". The Macon News. November 18, 1971. Section B, Page 1. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "Ribbon-Tugging Opens Crosstown Leg of I-75". The Macon News. November 21, 1971. pp. 1A, 2A. Retrieved August 29, 2026 – via Newspapers.com.
- ↑ State Highway Department of Georgia (January 1971). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved December 27, 2016.
- ↑ State Highway Department of Georgia (January 1972). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved December 27, 2016.
- ↑ Georgia Department of Transportation (January 1973). Official Highway Map (PDF) (Map). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved December 27, 2016.
- 1 2 Georgia Department of Transportation (January 1974). Official Highway Map (PDF) (Map) (1974–1975 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved December 27, 2016.
- ↑ Turner, John (November 26, 1974). "I-75 Motorists Can Leave Marietta in a Cloud of Dust". The Atlanta Journal. p. 2-A. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ "Five Mighty Miles". The Atlanta Journal. November 29, 1974. p. 18-A. Retrieved August 28, 2026 – via Newspapers.com.
- ↑ Georgia Department of Transportation (January 1975). Official Highway Map (PDF) (Map) (1975–1976 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved December 27, 2016.
- ↑ Lukachick Smith, Joy (December 21, 2012). "Interstate 75 turns 35". Chattanooga Times Free Press. Chattanooga, Tennessee. Retrieved June 16, 2018.
- ↑ Ayres Jr., B. Drummond (December 22, 1977). "I-75 Link Opens First Full Interstate Route". The New York Times. p. 14. Retrieved March 11, 2022.
- ↑ "Historical Context of the Interstate Highway System in Georgia" (PDF). Georgia Department of Transportation. March 2007. Retrieved June 15, 2021.
- ↑ HR 1098 - Larry McDonald Memorial Highway; designate (Resolution). Georgia House of Representatives. February 26, 1998. p. 1-2. Archived from the original on December 10, 2018. Retrieved June 15, 2021.
- 1 2 Phillips, Noelle (December 1, 1999). "Interstate Exit Signs to Get New Numbers in Georgia". The Florida Times-Union. Jacksonville. Morris News Service. Archived from the original on August 8, 2017. Retrieved November 11, 2017.
- ↑ "Interstate Exit Numbers". Georgia Department of Transportation. 2021. Archived from the original on December 27, 2021. Retrieved June 15, 2021.
- ↑ "FOX – Baseball player dies a week after Georgia bus crash kills 6 others". Fox News. March 9, 2007. Archived from the original on March 11, 2007. Retrieved June 15, 2021.
- ↑ Wickert, David; Joyner, Tammy (January 19, 2017). "New I-75 express lanes to speed up traffic — at a price". The Atlanta Journal-Constitution. Retrieved November 27, 2018.
- ↑ "Georgia Express Lanes Northwest Corridor". Georgia Department of Transportation. 2019. Archived from the original on February 26, 2020. Retrieved June 15, 2021.
- ↑ "I-16/I-75/ Interchange Project". www.dot.ga.gov. Archived from the original on February 5, 2021. Retrieved July 11, 2018.
- ↑ "14th Amendment Highway". Federal Highway Administration. Retrieved February 10, 2019.
- ↑ "I-75 Exit Number Conversion". Georgia Department of Transportation. Archived from the original on June 22, 2000.
- ↑ MapQuest (2009). "Map of Interstate 75 in Georgia" (Map). MapQuest. MapQuest. Retrieved July 23, 2011.[dead link]
- ↑ Georgia Department of Transportation (1980). Official Highway and Transportation Map (PDF) (Map) (1980–1981 ed.). Scale not given. Atlanta: Georgia Department of Transportation.
- ↑ Georgia Department of Transportation (2021). "I-75 @ CR 312/Bethlehem Road". Georgia Department of Transportation. Retrieved June 15, 2021.
- 1 2 "The Power of GIS: Advancing Geographic Literacy". Esri StoryMaps. 2022. Retrieved November 22, 2025.
External links
[edit]- I-75 Archived October 18, 2012, at the Wayback Machine at the Interstate Guide
- Interstate 75
- Interstate Highways in Georgia (U.S. state)
- Transportation in Lowndes County, Georgia
- Transportation in Cook County, Georgia
- Transportation in Tift County, Georgia
- Transportation in Turner County, Georgia
- Transportation in Crisp County, Georgia
- Transportation in Dooly County, Georgia
- Transportation in Houston County, Georgia
- Transportation in Peach County, Georgia
- Transportation in Crawford County, Georgia
- Transportation in Bibb County, Georgia
- Transportation in Macon, Georgia
- Transportation in Monroe County, Georgia
- Transportation in Lamar County, Georgia
- Transportation in Butts County, Georgia
- Transportation in Spalding County, Georgia
- Transportation in Henry County, Georgia
- Transportation in Clayton County, Georgia
- Transportation in Fulton County, Georgia
- Roads in Atlanta
- Transportation in Cobb County, Georgia
- Transportation in Cherokee County, Georgia
- Transportation in Bartow County, Georgia
- Transportation in Gordon County, Georgia
- Transportation in Whitfield County, Georgia
- Transportation in Catoosa County, Georgia
