List of megaprojects

From Wikipedia, the free encyclopedia

This is a list of megaprojects, which may be defined as projects that cost more than US$1 billion and attract a large amount of public attention because of their effects on communities, the natural and built environment, and budgets; or more simply "initiatives that are physical, very expensive, and public".[1]

Megaprojects can be found in many fields of human endeavor, including bridges, tunnels, highways, railways, hospitals, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and military weapons. The following lists are far from comprehensive.

Legend

[edit]
Terms used in the Status columnStatus color
Proposed
In Planning, Approved, Under/In Development, Under Construction, Re-Construction In Progress, Nearly Complete
On Hold
Abandoned, Cancelled
Completed

Aerospace projects

[edit]
ProjectCompaniesLocationProposal yearStatusEnd yearCostNotesRef
A-7 Corsair IILing-Temco-VoughtUnited States1963Completed1984A single-seat carrier-capable subsonic attack fighter used by the U.S. Air Force and U.S. Navy in the 1960s to 1990s. A derivative of the Vought F-8 Crusader, it saw heavy use in battle in Southeast Asia in addition to its subsequent use in later conflicts such as the Gulf War.[2]
Airbus A380Airbus2003Completed2021US$25 billionA double-deck, wide-body, four-engine jet airliner.[3]
Antonov An-225Antonov1988Completed2022This was the longest and heaviest aircraft in service until it was destroyed during the Russian-Ukrainian conflict. Only one was completed.
B-1 LancerRockwell InternationalUnited States1980sCompletedA supersonic bomber with a variable-sweep wing built in the 1980s as a strategic bomber. It has since acquired conventional and multi-role capabilities.
B-2 SpiritNorthrop GrummanUnited States1987Completed2000A US heavy bomber with "low observable" stealth. Total program cost including development, engineering, and testing averaged $2.1 billion per aircraft in 1997.[4]
B-29 SuperfortressBoeingUnited States1943Completed1946US$3 billionThe first nuclear bomber cost 50% more to develop than the bombs in the Manhattan Project.[5][6]
B-52 StratofortressBoeingUnited States1952Completed1963One of the largest military aircraft ever built. In service since 1955, with decades more planned. All subsequent U.S. bombers have also been megaprojects.
B-58 HustlerConvairUnited States1960Completed1970An all-weather, high altitude supersonic bomber with a fixed delta wing and 4 engines. The Hustler was operational from 1960 to 1970 in the US Air Force's Strategic Air Command for the deployment of up to 5 gravity nuclear weapons.
Boeing 2707 and Lockheed L-2000 supersonic aircraftLockheed, Boeing, US Department of DefenseUnited States1963Cancelled1971A U.S. government competition to build the first U.S. supersonic transport (SST) was canceled before prototypes were built for political, environmental and economic reasons.
Boeing 747Boeing1970Completed2023A wide-body commercial airliner first produced in 1970, often referred to by the nickname Jumbo Jet, is among the world's most recognizable aircraft with uses for long-distance passenger transport, cargo, the US President's official shuttle plane, and as NASA's Shuttle Carrier Aircraft.[7][8]
Boeing 787BoeingUnited States2007CompletedOngoingMade with local and globally sourced parts; the first major aircraft to be made largely out of composite materials.
[9]
C-5 GalaxyLockheedUnited States1961Completed1969Over $1 billionThe largest and heaviest aircraft of any kind for over a decade (1970 to 1982). This military cargo plane was the first development program with a billion dollar cost overrun.[10][11]
ConcordeAérospatiale, British Aircraft CorporationUnited Kingdom, France1965Completed1979A product of an Anglo-French government treaty, the supersonic passenger airliner Concorde entered service in 1976 and continued commercial flights for twenty-seven years.
F-22 RaptorLockheed MartinUnited States1996Completed2011A single seat, twin-engine fifth-generation fighter that uses stealth technology.
F-35 Lightning IILockheed MartinUnited States2006CompletedOngoingUS$2 trillionA single seat, single engine, all-weather stealth multirole combat aircraft that is intended to perform both air superiority and strike missions. $2 trillion cost is from 2000 to 2088.[12]
KH-11 KennenLockheedUnited States1976Completed1990Reconnaissance satellite.
Sukhoi Su-57SukhoiRussiaCompletedA fifth-generation stealth fighter jointly developed for the Russian Air Force. Indian Air Force cancelled its order.
TF KaanTurkish Aerospace IndustriesTurkey2011In progress2030s$20 billionA stealthy, twin-engine, all-weather air superiority fighter, classified as a fifth-generation fighter.[13]
Tupolev Tu-144TupolevSoviet Union1968CompletedThe first supersonic transport aircraft. First flown on 31 Dec 1968; entered service on 26 Dec 1975.
Tupolev Tu-160TupolevSoviet UnionCompletedThe largest combat aircraft, supersonic aircraft, and variable-sweep aircraft ever built.

Disaster cleanup

[edit]

While most megaprojects are planned and undertaken with careful forethought, some are undertaken out of necessity after a natural disaster occurs. There have also been a few human-made disasters. Major restoration was necessary after the destruction caused by World War I and II, some of which was paid for by German reparations for World War I and for World War II.

ProjectLocationDisasterDisaster yearStatusCompletion yearCostNotesRef
Great Mississippi Flood reliefMississippi Delta regionGreat Mississippi Flood of 19271927Completed$246 million to $1 billion$4.2–$17.3 billion in 2023 dollars[14]
Mount St. Helens eruption cleanupWashington state, U.S.1980 eruption of Mount St. Helens1980Completed$1.1 billion[15]
Chernobyl New Safe ConfinementChernobyl, UkraineChernobyl disaster1986Completed2019€2.15 billionThe New Safe Confinement accounts for €1.5 billion, with the remainder going to related remedial work and maintenance.[16][17]
Exxon Valdez oil spillPrince William SoundExxon Valdez oil spill1989CompletedOver $2 billion[18]
Northridge earthquake disaster reliefLos Angeles, U.S.1994 Northridge earthquake1994Completed$13–50 billion
AZF chemical factory explosion cleanupToulouse, FranceToulouse chemical factory explosion2001Completed€2 billion[18][19]
Humanitarian response to the 2004 Indian Ocean earthquakeIndian Ocean coastline areas2004 Indian Ocean earthquake and tsunami2004CompletedUS$6.25 billion[20]
Hurricane Katrina disaster reliefAtlantic basin countriesHurricane Katrina2005Completed$190 billion [21]
Deepwater Horizon cleanupGulf of MexicoDeepwater Horizon oil spill2010Completed$65 billion[18][22]
Fukushima disaster cleanupFukushima, JapanFukushima Daiichi nuclear disaster2011CompletedUS$187 billionCost includes compensation, decontamination, interim storage, and decommissioning of reactors.[23]
Tōhoku earthquake and tsunami disaster reliefPacific Rim2011 Tōhoku earthquake and tsunami2011CompletedUS$360 billionCost includes Fukushima disaster cleanup and economic losses.[24][25]

Energy projects

[edit]
ProjectLocationCapacity
(MW)
Start yearStatusCompletion yearCost
(billions)
NotesRef
Abreu e Lima Refinery Abreu e Lima, Brazil 2007 Under construction est. 2029 $20 bn USD [26]
Angra 3 Nuclear Power Plant Angra dos Reis, Brazil 1405 MW 1981 Under construction est. 2033 $6.7 bn USD The construction works have undergone several stoppages over the decades. [27]
Australia-Asia Power LinkNorthern Territory, AustraliaProposed$35 bn AUD (est.)Electricity infrastructure project planned to include the world's largest solar plant, the world's largest battery, and the world's longest submarine power cable.[28]
Celtic InterconnectorCork, Ireland7002023Under constructionest. 2026€1.6 bn EUR (est.)Subsea HVDC connection between Ireland and France under the Celtic Sea[29]
Khavda Solar ParkGujarat, India30000Completed2025Located in the Rann of Kutch; will cover an area of 726 km2 (280 sq mi) once completed.
Omkareshwar Floating Solar Power ParkMadhya Pradesh, India600Under construction2023
(Phase I)
Aims to become the world's largest floating solar park.
KSEB- Kerala Dam Wind Farm, India[30]Kerala, India100 MWUnder construction2025
Bhadla Solar ParkRajasthan, India2245Completed2020One of the world's largest photovoltaic power stations.[31][32][33]
Benban Solar ParkEgypt1500Completed2019$3.5–4 bn USD[34]
Bataan Nuclear Power PlantMorong, Bataan, Philippines621Completed1984Over $2.3 bn USDThe plant never opened due to political change and safety issues, and its planned reactivation has become the focal point of the Anti-nuclear movement in the Philippines.[35][36][37][38][39][40]
Boundary Dam Power StationSaskatchewan, Canada5311959Completed$1.5 bn CADThe world's first large-scale, coal-fired carbon capture and storage plant[41]
Gorakhpur Nuclear Power PlantHaryana, India1400In progress2032NPCIL had started the procurement activities for this project, as BHEL secured the order for supply of steam generators to this project
Genesis Solar Energy ProjectBlythe, California, U.S.250Completed2014One of the largest operational solar thermal power stations.[citation needed]
Ivanpah Solar Power FacilityMojave Desert, California, U.S.392CompletedOne of the largest operational solar thermal power stations. Operational since February 2014.[citation needed]
Kemper County Energy FacilityMississippi, U.S.5822010Suspended$7.5 bn USDThe world's first construction attempt of an Integrated Gasification Combined Cycle plant with Carbon Capture & Sequestration. However, after significant delays and cost overruns, the gasification process is currently suspended and the power plant runs just on regular natural gas.[42]
Mojave Solar ProjectBarstow, California, U.S.280Completed2014One of the largest operational solar thermal power stations.[citation needed]
Noor Abu DhabiAbu Dhabi, UAE1177Completed2019One of the world's largest photovoltaic power stations.[43]
Olkiluoto 3Eurajoki, Finland16002005Completed2022€11 bn EURBegan regular operations in April 2023.[44][45]
Panamanian Natural Gas electric power plantColón Province, PanamaCurrently has an investment of $1.15 bn USD.[46]
Pavagada Solar ParkKarnataka, India2050Completed2019One of the world's largest photovoltaic power stations.[47][48]
Quaid-e-Azam Solar ParkBahawalpur, Pakistan10002015CompletedPhase-1 of 100 MW Operational since 2015. Expected to be one of the largest operational solar thermal power stations.[citation needed]
Rio de Janeiro Petrochemical Complex Rio de Janeiro, Brazil 2006 Under construction est. 2030 Over $47 bn USD [49]
Rooppur Nuclear Power Plant Ishwardi, Bangladesh 2017 Under construction est. 2027 $12.65 billion It will be the country's first nuclear power plant. [citation needed]
Solana Generating StationGila Bend, Arizona, U.S.280Completed2013Includes a 6h thermal energy storage. One of the largest operational solar thermal power stations.[citation needed]
Solar Energy Generating SystemsMojave Desert, California, U.S.3541984-1991CompletedCollection of 9 units. One of the largest operational solar thermal power stations.[citation needed]
Tengger Desert Solar ParkNingxia, China1547Completed2016One of the world's largest photovoltaic power stations.[50][51]
Three Gorges DamHubei Province, China225001994Completed2003¥203 bnThe largest hydro-electric facility in the world.[citation needed]
Tres Amigas SuperStationUnited Statesn/aCancelledn/a$2 bn (early estimate)A proposed interconnection between the Eastern Interconnection, the Western Interconnection, and the Texas Interconnection, effectively connecting nearly all electrical grids in North America.[citation needed]
Virgil C. Summer Nuclear Generating StationJenkinsville, South Carolina, U.S.9732013CancelledOver $2.5 bn USDThe project planned to construct some of the first new nuclear units in the United States in over 30 years at an existing nuclear power plant. The project was cancelled and all work stopped in July 2017.[52]
Vogtle Electric Generating PlantWaynesboro, Georgia, U.S.2013Completed2024 (proj.)Construction of two new nuclear units at an existing nuclear power plant.[citation needed]
Yarlung Zangbo hydropower project Nyingchi, Tibet Autonomous Region, China 2025 Under construction 1.2 trillion RMB A hydropower project under construction on the lower reaches of the Yarlung Tsangpo River in the People's Republic of China. [53]

Science projects

[edit]

Research and development

[edit]
ProjectLocationStart yearStatusEnd yearCostNotesRef
CopernicusEuropean Union1998Ongoing6.8 billion (2020)Satellite constellation program for global monitoring[citation needed]
COVID-19 vaccine developmentWorldwide2020Completed202393 billion (2021) Global efforts to develop a vaccine against the SARS-CoV-2 virus[54]
Human Genome ProjectUnited States/Worldwide1990Completed2003$5 billion USD (2021 adj.)U.S.-led international effort to sequence the human genome[55]
Manhattan ProjectUnited States1942Completed1946$22.8 billion USD (2021 adj.)U.S. government effort to produce the first nuclear bombs.[56]

Physics and astronomy infrastructure

[edit]
ProjectLocationStart yearStatusEnd yearCostNotesRef
Atacama Large Millimeter ArrayAtacama Desert, ChileCompleted[citation needed]
Deep Underground Neutrino Experiment and the Long Baseline Neutrino FacilityFermilab, Sanford Underground Research Facility, U.S.2032 (proj.)In progress$3 billion USD (phase 1 est.)[57]
Electron-ion colliderBrookhaven National Laboratory, U.S.2020In progressUS$1.6–2.6 billion[citation needed]
EnvisatOuter space2002CompletedAn Earth observation satellite of the European Space Agency; inactive since 2012.[citation needed]
European Spallation SourceLund, Sweden2013In progress2025 (proj.)Strongest-ever spallation source for advanced and new material research development.[citation needed]
European X-ray free electron laserSchenefeld, Germany2017Completed€1.22 billionUsed for material research.[58]
Extreme Light InfrastructureCzech Republic, Hungary, RomaniaEuropean centers for the most intense lasers[citation needed]
Extremely Large TelescopeChile2014In progress2029 (proj.)World's largest optical to mid infrared telescope.[59]
Facility for Antiproton and Ion ResearchDarmstadt, Germany2012In progress2025 (proj.)[60]
Five hundred meter Aperture Spherical TelescopeGuizhou Province, China2011Completed2020¥1.2 billionThe world's largest static/semi-static radio telescope measuring 500 m (1,600 ft) across.[citation needed]
Giant Magellan TelescopeVallenar, Chile2015In progress2025 (proj.)US$2 billionA large ground-based optical and near infrared telescope.[citation needed]
India-based Neutrino ObservatoryTamil Nadu, India2015In progress1,500 crore (est.)
(15 billion)
[citation needed]
ITERFrance2013In progress2025 (proj.)Up to 65 billion (est.)International effort to build the world's largest nuclear fusion reactor.
Large Hadron ColliderSwitzerland, France19972007~$4.75 billion13 TeV CERN particle accelerator.
Compact Muon Solenoid detector for the Large Hadron Collider
Compact Muon Solenoid detector for the Large Hadron Collider
[61]
Advanced LIGOWashington state and Louisiana, U.S.1994Completed2002More than US$1 billionA large-scale physics experiment and observatory to measure gravitational waves[62]
MYRRHABelgiumIn progress2036 (proj.)Prototype of an accelerator-driven system to transmute nuclear waste[citation needed]
National Ignition FacilityLawrence Livermore National Laboratory, U.S.1997Completed2009Almost $1 billion (2002 est.)United States nuclear fusion project[citation needed]
Ocean Networks CanadaUniversity of Victoria, CanadaLargest underwater observatories, providing 24/7 access to hundreds of instruments in the Pacific Ocean and the Salish Sea.[citation needed]
Proton Improvement Project ("PIP II")2020In progress2028 (proj.)$1.28 billion USD2022 est.[63]
Square Kilometre ArraySouth Africa, Australia2018In progress2028 (proj.)€2 billion[citation needed]
Superconducting Super ColliderWaxahachie, Texas, U.S.CancelledUS$8.4 billion (1993 est.)40 TeV particle accelerator[citation needed]
TevatronBatavia, Illinois, U.S.1969Completed1983US$120 millionInactive TeV particle accelerator.[citation needed]
Thirty Meter TelescopeMauna Kea Observatories, U.S.2014HaltedLarge optical and near infrared telescope. Halted due to protests.[citation needed]
Very Large ArrayNew Mexico, U.S.1973Completed1980Radio astronomy observatory.[citation needed]
Virgo interferometerCascina, Italy1996Completed2003Gravitational-wave observatory
Wendelstein 7-XGreifswald, Germany2005Completed2015€1.06 billionAn experimental stellarator (nuclear fusion reactor)[citation needed]

Spacecraft

[edit]
ProjectOrganization(s)Start yearStatusEnd yearCostNotesRef
Advanced Telescope for High Energy AstrophysicsESA2000sIn progress2035 (proj.)Planned X-ray telescope.[citation needed]
Cassini–HuygensNASA, ESA, ASICompleted2017$3.26 billion USDSpacecraft mission that studied Saturn and its many natural satellites.[64]
Chandrayaan programISRO2003Active$170 million USDLunar exploration program.[citation needed]
Chang'e 1 to Chang'e 6ChinaActiveLunar exploration spacecraft equipped with landers, orbiters and rover. It will for the first time in history explore the dark side of the Moon.[citation needed]
Compass navigation systemChinaEst. 2015CompletedEst. 2017Independent system of satellite navigation[citation needed]
Europa ClipperNASA2022ActiveInterplanetary mission to study Jupiter's moon Europa. Launched October 2024.[citation needed]
Gaia spacecraftESA2013Active2025 (proj.)$1 billion USDMission to create a 3D map of local Milky Way.[65]
Galileo Navigation Satellite SystemEuropean Union, ESA2016Active€5 billion EUR[66]
Galileo spacecraftNASA1989Completed2003$1.5 billion USD (2003)Mission to Jupiter.[67][68]
Global Positioning SystemUnited States Department of Defense1973ActiveOver $21.7 billion USDGlobal satellite navigation system.[69]
GLONASSRoscosmos1982ActiveThe Russian global navigation satellite system.[citation needed]
Herschel Space ObservatoryESA, NASA2009Completed2013€1.1 billionSpace observatory sensitive to the far infrared and submillimetre bands.[70]
Hubble Space TelescopeNASA1978Active$10 billion USDOptical telescope orbiting in low Earth orbit[71]
International Space StationNASA, Roscosmos, JAXA, ESA, CSA1998Active$150 billion USD (2010)[citation needed]
James Webb Space TelescopeNASA, ESA, CSA2021Active$8.8 billion USD (2013)[72])
Juno spacecraftNASA2011ActiveNew Frontiers mission to Jupiter[citation needed]
Jupiter Icy Moon ExplorerESA2023ActiveMission to Jupiter[citation needed]
Laser Interferometer Space AntennaESA2032 (proj.)ProposedAn L3 class mission designed to detect and accurately measure gravitational waves.[citation needed]
Lunokhod ("Moonwalker")Soviet space program1969Completed1977Inactive series of Soviet robotic lunar rovers designed to land on the Moon. Lunokhod 1 was the first roving remote-controlled robot to land on another world.[citation needed]
Mars programSoviet space program1960Completed1973Inactive series of uncrewed spacecraft. The spacecraft were intended to explore Mars, and included flyby probes, landers and orbiters.[citation needed]
Mars Science Laboratory (with Curiosity)NASA2011Active$2.5 billion USD[73]
Mars 2020 (with Perseverance and IngenuityNASA2020ActiveA Mars rover mission under the Mars Exploration Program.[citation needed]
MirSoviet space program, Roscosmos1986Completed2001Russian space station in low Earth orbit.[citation needed]
Nancy Grace Roman Space TelescopeNASA2026In developmentA wide field infrared space telescope.[citation needed]
NAVICISRO2013ActiveThe Indian equivalent of GPS.[citation needed]
Orion spacecraftNASA2014ActivePart of the Artemis program.[citation needed]
Planck spacecraftESA2009Completed2013A mission to measure the cosmic microwave background.[citation needed]
VeneraSoviet space program1961Completed1984Venus series space probes developed to gather data from Venus. Venera 7 became the first spacecraft to land on Venus and first to transmit data from there back to Earth.[citation needed]
Sutherland spaceportBritish space programme2023In developmentThis will be the first spaceport in the UK.[citation needed]

Other spaceflight projects

[edit]
ProjectOrganization(s)Start yearStatusEnd yearCostNotesRef
Alpha Magnetic SpectrometerNASA, Roscosmos, JAXA, ESA, CSA2011Active$2 billionA particle physics experiment module mounted on the International Space Station[74]
Apollo programNASA1960Completed1975$203.4 billion USD (2015)As a centerpiece of the US Space Program, culminated in crewed exploratory missions to the Moon.[75]
ArianeESA1973ActiveA family of European launch vehicles; the most recent variant is Ariane 6.[citation needed]
Artemis programNASA with partners JAXA, ESA, CSA, DLR, ASI, ISA2017Active[citation needed]
Avatar RLVDRDO, ISROProposedIndian version of the Space Shuttle.[citation needed]
Baikonur CosmodromeSoviet space program, Roscosmos, Russian Aerospace Forces1955ActiveThe world's first and largest operational space launch facility. It was originally built by the Soviet Union in the late 1950s as the base of operations for the Soviet space program.[citation needed]
Buran programSoviet space program, Roscosmos1974Cancelled1993Soviet version of the Space Shuttle.[citation needed]
Constellation programNASA2005Cancelled2010Cancelled planned Moon landing spacecraft and Space Shuttle replacement. Part of it lives on as future Crew Escape Vehicle for the ISS.[citation needed]
SpaceX Mars transportation infrastructureSpaceX2016ActiveA privately funded spaceflight system capable of enabling human settlements on Mars.[citation needed]
Kennedy Space CenterNASA1968ActiveThe main spaceport for US-crewed space flight.[citation needed]
Shenzhou programChina Manned Space Agency1992ActiveChinese human spaceflight program.[citation needed]
Soyuz programSoviet space program, Roscosmos1966ActiveHuman spaceflight program.[citation needed]
Soviet MoonshotSoviet space program1962Cancelled1969Cancelled Moon landing program.[citation needed]
Space Launch SystemNASA2011ActiveAn American Space Shuttle-derived heavy expendable launch vehicle.[citation needed]
Space Shuttle programNASA1972Completed2011$203.6 billion USD (2015)Low Earth orbiters designed as crewed cargo vessels that could be reused after each spaceflight and landed like a glider.[76]
Vostochny Cosmodrome ("Eastern Spaceport")Roscosmos2011ActiveRussian spaceport on the 51st parallel north.[citation needed]
Vostok programSoviet space program1959Completed1963Soviet program to put the first man in space.[citation needed]

Sports and culture projects

[edit]

Every Olympic Games and FIFA World Cup in the latter part of the twentieth century and entering into the 21st century has cost more than $1 billion in arenas, hotels etc., usually several billions. The Olympic Games are considered to be the world's foremost international sporting event with over 200 nations participating. Sports-related costs for the Summer Games since 1960 is on average $5.2 billion (USD) and for the Winter Games $393.1 million. The highest recorded total cost was the 2014 Sochi Winter Olympics, costing approximately US$55 billion. The International Olympic Committee requires a minimum of 40,000 hotel rooms available for visiting spectators and an Olympic Village that is able to house 15,000 athletes, referees, and officials.

ProjectOrganization(s)LocationStart yearStatusEnd yearCost
(billions)
& date
NotesRef
Allegiant StadiumNational Football LeagueParadise, Nevada, U.S.Completed2020$1.9 (2020)This covered-roof stadium is home to the Las Vegas Raiders as well as a local college team, the UNLV Rebels[77]
AT&T StadiumNational Football LeagueArlington, Texas, U.S.Completed2009$1.3 (2009)A retractable-roof stadium that houses the Dallas Cowboys. It also hosts other major events, most notably the Big 12 Championship Game and Cotton Bowl Classic in college football.[78]
Barclays CenterNational Basketball AssociationBrooklyn, New York, U.S.Completed2012$1 (2012)Home of the Brooklyn Nets. Also served as full-time or part-time home of the NHL's New York Islanders from 2015 to 2020.
Climate Pledge ArenaNational Hockey LeagueSeattle, Washington, U.S.Completed2021$1.05 (2021)Renovation and expansion of Seattle's main indoor arena for the Seattle Kraken, which started NHL play in the rebuilt venue in 2021. The originally planned cost of $700 million was increased due to changes to the arena plans and COVID-19 issues. A very small part of the total cost was to pay for another major arena tenant, the Seattle Storm of the WNBA, to move its home games to other area venues during the project. The arena will also be suitable for a potential NBA franchise in the city.[79]
Globe Life FieldMajor League BaseballArlington, Texas, U.S.Completed2020$1.1 (2020)This retractable-roof stadium houses the Texas Rangers.[80]
Guangzhou Football ParkChina League OneGuangzhou, Guangdong, China2020In progress¥12 (2022)100,000-seat football stadium intended to be the future home of Guangzhou F.C. of the Chinese Super League. Construction began in April 2020 and cancelled in 2022 due Evergrande's financial difficulties. Construction recontinued in 2023.[citation needed]
Levi's StadiumNational Football LeagueSanta Clara, California, U.S.Completed2014$1.3 (2014)An open-air stadium that houses the San Francisco 49ers.[81]
Mercedes-Benz StadiumNational Football LeagueAtlanta, Georgia, U.S.Completed2017$1.6 (2017)A retractable-roof stadium to house the Atlanta Falcons, as well as Atlanta United FC of Major League Soccer.[citation needed]
MetLife StadiumNational Football LeagueEast Rutherford, New Jersey, U.S.Completed2010$1.6 (2010)An open-air stadium that houses two NFL teams, the New York Giants and New York Jets.[citation needed]
Narendra Modi StadiumBoard of Control for Cricket in IndiaAhmedabad, Gujarat, India2015Completed2020US$0.11 (2020)It is the largest cricket stadium in the world with a seating capacity of 132,000 spectators.[82]
New Stadium at RFK CampusNational Football LeagueWashington, D.C., U.S.2027In progress2030$3.8 (2026)A covered-roof stadium to house the NFL team Washington Commanders. Includes adjacent mixed-use districts.[83]
New Highmark StadiumNational Football LeagueOrchard Park, New York, U.S.2023In progress2026$1.7 (2023)An open-air stadium to house the Buffalo Bills.[84]
New Nissan StadiumNational Football LeagueNashville, Tennessee, U.S.2024In progress2027$2.1 (2024)A covered-roof stadium to house the Tennessee Titans.[85]
Sardar Vallbhbhai Patel Sports EnclaveSummer Olympic GamesAhmedabad, Gujarat, India2021In progressUS$0.64 (2021)[citation needed]
SoFi StadiumNational Football LeagueInglewood, California, U.S.Completed2020$4.9 (2020)This covered-roof stadium houses two NFL teams, the Los Angeles Rams, who own the stadium, and the Los Angeles Chargers.[86]
Tottenham Hotspur StadiumPremier LeagueLondon, UKCompleted2019£0.85 (2019)Home to the Tottenham Hotspur F.C. Also designed to host American football games in the NFL International Series[87]
U.S. Bank StadiumNational Football LeagueMinneapolis, Minnesota, U.S.Completed2016$1.061 (2016)A covered-roof stadium that is home to the Minnesota Vikings.[88]
UBS ArenaNational Hockey LeagueElmont, New York, U.S.2019Completed2021$1 (2021)This new multi-use arena is designed to handle 18,000 seats to host New York Islanders home games.[89]
Wembley StadiumThe Football AssociationLondon, UKCompleted2007£0.798 (2007)Home of the England national football team; also designed to host many other large events.[90]
Yankee StadiumMajor League BaseballBronx, New York, U.S.Completed2009$2.309 (2009)This open-air stadium opened as the replacement for the New York Yankees' original Yankee Stadium. It has since become home to a Major League Soccer team, New York City FC.[91]

Roads and transport infrastructure

[edit]

Ground transportation systems like roads, tunnels, bridges, terminals, railways, and mass transit systems are often megaprojects. Numerous large airports and terminals used for airborne passenger and cargo transportation are built as megaprojects.

Africa

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
African UnionGreat Green Wall of the Sahara and the SahelSahel region2007ActiveEffort to prevent the expansion of the Sahara Desert.[citation needed]
EthiopiaAddis Ababa–Debre Markos ExpresswayAddis Ababa, Debre MarkosIn progress$1.64 billion[92]
Addis Ababa–Djibouti RailwayEthiopia, Djibouti2011Completed2016$4.5 billion
Addis Ababa–Jimma ExpresswayAddis Ababa, JimmaIn progress$2.03 billion[93]
Addis Ababa–Kombolcha–Dessie ExpresswayAddis Ababa, Kombolcha, DessieIn progress$2.32 billion[94]
Awash–Weldiya RailwayEthiopia, Djibouti2015In progress$1.7 billion
Bishoftu International AirportBishoftu, Ethiopia2026In progress2030$12.5 billionThe first phase, which can accommodate up to 60 million passengers per year, is currently under construction and is expected to finish work in 2030. The second phase, which will increase capacity to 110 million, will follow suit.[95]
Weldiya–Mekelle RailwayEthiopia, Djibouti2017In progress$1.5 billion
NigeriaAbuja Light RailAbuja, FCT, NigeriaSuspended2020$2.65 billionThe first phase of the project connects the city centre to Nnamdi Azikiwe International Airport, stopping at the Lagos–Kano Standard Gauge Railway station in Idu. The first 12 stations opened in July 2018 before services were suspended in early 2020 due to the COVID-19 pandemic.[96][97][98]
Fourth Mainland BridgeLagos State2022In progress$4.2 billionThe fourth mainland bridge will join three other bridges connecting Lagos Island to the mainland. The 38 km (24 mi) bridge and expressway will become the longest bridge and expressway in the world when completed.[99]
Lagos-Calabar RailwayLagos, Cross River, Rivers, Anambra States2014In progress$11.920 billionPhase 1 of this 1,402 km (871 mi) standard gauge railway will connect Lagos to Calabar; the second phase will connect Calabar and Lagos through Onitsha.[100][needs update]
Lagos–Kano Standard Gauge RailwayLagos, Kano, Kaduna, and Oyo States; FCT2016In progress$8.3 billionThis 2,733 km (1,698 mi) standard gauge railway has three planned routes: Abuja to Kaduna, Lagos and Ibadan, and Lagos to Kano. The first two lines opened in 2016 and 2021, respectively.[101]
Lagos Rail Mass TransitLagos State2009Completed2022-2024$3.6 billionAn urban rail system that is planned to have seven lines. The first line (Blue line) opened in 2023, second (Red line) in 2024.[102][103]
Third Mainland BridgeLagos State1970sCompleted1990Currently the longest of three bridges connecting Lagos Island to mainland Lagos. It is 11 km (6.8 mi) in length.
[citation needed]

Asia

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
BangladeshPadma BridgeMunshiganj, Shariatpur, and Madaripur Districts2014Completed2022$3.6 billionA 6.150 km (3.821 mi) two-level road-rail bridge. It is the longest bridge in Bangladesh, the second-longest in the Indo-Gangetic Plain, and the longest over the Ganges River in terms of both span and the total length.[citation needed]
Dhaka Metro RailDhaka2016In progress2030$2.8 billionOf the six planned lines, two are operational as of 2022 and 2023, respectively.[citation needed]
Karnaphuli TunnelChittagong2017Completed2023$1.2 billionFirst underwater tunnel in the South Asian region.[citation needed]
Jamuna Railway BridgeSirajganj to Tangail2020Completed2024$1.6 billionA 4.8 km (3.0 mi) long railway bridge that is expected to be the largest dedicated rail bridge in the country after completion.[citation needed]
Hazrat Shahjalal International Airport Terminal 3Dhaka2019Completed2025$2.5 billionUpon completion of the third terminal, passenger handling capacity of the airport will increase to 20 million from the current 8 million per annum. Cargo handling capacity will also increase to 500,000 from 200,000 tonnes annually.[citation needed]
Central Business DistrictPurbachalIn progress$17 billionIt will have three super-tall skyscrapers, surrounded by thirty-eight 40+ floor skyscrapers.[citation needed]
BahrainBahrain International Airport Expansion ProjectMuharraq, Muharraq IslandCompleted2021$1.1 billion USD[citation needed]
Bahrain Light Rail NetworkNationwideIn progress2025 (proj.)$2 billion USD[citation needed]
IndiaBharatmalaNationwide2017In progressMore than $110 billionRoad development project under the Ministry of Road Transport and Highways.[104]
Char Dham HighwayUttarakhandIn progressMore than $1.5 billionA two-lane National Highway.[citation needed]
Delhi–Mumbai Industrial Corridor ProjectSix Indian statesIn progressMore than $90 billionInvestments will be spread across the 1,500 km (930 mi) long Western Dedicated Freight Corridor, which will serve as the industrial corridor's transportation backbone.[105][106][107]
Hyderabad Metro RailHyderabad, Telangana2012In progressMore than $2.5 billionTwo of the three planned lines became operational in 2017.[108][109][110]
HyperloopNationwideProposedProposal to establish hyperloop infrastructure for the Pune-Mumbai, Chennai-Bangalore, and Amaravati-Vijayawada corridors.[111][112][113]
Mumbai–Ahmedabad high-speed rail corridorMumbai-Ahmedabad corridorIn progress2027 (proj.)More than $18 billionWhen completed, it will be India's first high-speed rail line.[114]
Navi Mumbai International AirportMumbai2021Completed2025More than $2.5 billionThis project aims to ease air traffic congestion at Chhatrapati Shivaji Maharaj International Airport.[115]
Noida International AirportNoida, Uttar Pradesh2021Completed2025More than $4 billionThis airport aims to decongest the load of the Indira Gandhi International Airport in Delhi by serving 120 million passengers per year over eight runways. The airport is expected to expand in three phases over 30 years and will be one of the world's largest airports upon completion. Phase 1 will be completed in 2024.[116][117]
SagarmalaNationwideIn progressMore than $130 billionA Ministry of Ports, Shipping and Waterways project meant to enhance the country's logistics sector.[118][119]
IndonesiaJakarta MRTJakarta2013In progress$2.86 billionAs of 2019, one of the four planned lines is operational. The next two lines to open are expected to open in 2024 and 2026.[citation needed]
Greater Jakarta LRTJakarta2004Completed2023$1.58 billionPhase 1, the Bekasi Line and part of the Cibubur Line, were completed in 2023.[120]
Jakarta–Bandung HSRJava2016Completed2023$5.5 billion3 of the 4 planned lines have been opened and are operational.[citation needed]
Trans-Sumatra Toll RoadSumatraIn progress$33.2 billionOf the 17 planned segments, 8 have been completed as of 2019.[citation needed]
IranTehran-Shomal FreewayTehran-Mazandaran provinceIn progressAbout $1 billion USDWill be 121 km (75 mi) in length. As of 2023, three of the four planned sections are operational.[121]
IsraelTel Aviv–Jerusalem railwayTel Aviv-Jerusalem2001Completed$1.9 - $2.8 billion USD[citation needed]
Tel Aviv Light RailTel Aviv Metropolitan Area2015In progress187.5 billionAs of 2023, 1 of the 4 planned light rail transit has been completed. Three metro lines will also be constructed.[citation needed]
JapanJapan's Maglev High-Speed Rail (Chūō Shinkansen)TokyoNagoyaOsaka2014In progress2037 (proj.)¥9 trillion[citation needed]
KuwaitSheikh Jaber Al-Ahmad Al-Sabah Causeway ProjectKuwait Bay2013Completed2019$3 billionLaunching point of Madinat Al-Hareer in Subiya.[citation needed]
Kuwait International Airport Passenger Terminal 2Kuwait City2017In progress2025 (proj.)$4.3 billionConstruction was delayed due to the COVID-19 pandemic.[122]
MalaysiaKlang Valley Mass Rapid Transit ProjectKuala Lumpur2016In progress2028 proj.RM50 billionWhen completed, it will be operated as part of the Klang Valley Integrated Transit System.[citation needed]
MRL East Coast Rail Link (ECRL)Kelantan, Terengganu, Pahang, Negeri Sembilan, Selangor2017In progress2027 (proj.)RM44 billion[citation needed]
Kuala Lumpur International AirportSelangor1993Completed1998RM3.92 billion[citation needed]
Penang SentralPenang2007Completed2018RM230 million[citation needed]
West Coast ExpresswaySelangor and Perak2014In progressRM5.044 billion[citation needed]
PakistanKarachi–Lahore MotorwayKarachi to Peshawar through Islamabad, Lahore, Multan and Sukkur2015Completed2020$6.6 billionThis six-lane, high-speed, limited-access motorway is 1,694 km (1,053 mi) in length.[citation needed]
Karachi Circular RailwayKarachi2001In progress$1.6 billionRevival of the Karachi Circular Railway, which became operational in 1969 and closed in 1999 due to mismanagement. The project includes 23 stations, 3 lines and more than 50 km (31 mi) of track.[citation needed]
Karachi MetrobusKarachi2013In progress$400 millionTwo of the 6 planned lines are operational.[citation needed]
Malir ExpresswayKarachi2022In progress2024 (proj.)$400 millionAs of August 2023, half of the 40.3 km (25.0 mi) expressway is operational.[citation needed]
New Gwadar International AirportGwadarCompleted2024$400 millionThis will replace the existing Gwadar International Airport.[citation needed]
Karachi–Peshawar Railway Line ML-1Multiple Pakistani provinces2024 (proj.)In progress$7 billionThis renovation is part of the China–Pakistan Economic Corridor.[citation needed]
Orange Line MetroLahore2015Completed2020$1.500 billionThis is the first of the three planned Lahore Metro lines and is Pakistan's first driverless metro.[citation needed]
ChinaChina–Pakistan Economic CorridorPakistan and Xinjiang, ChinaIn progress$62 billionThe project aims to connect Gwadar Port to Xinjiang via a network of highways, railways and pipelines to transport oil and gas. The economic corridor is expected to run about 3,000 km (1,900 mi)[123]
Beijing Daxing International AirportBeijing2014Completed2019$17 billion[citation needed]
Hong Kong-Zhuhai-Macao BridgePearl River Delta2009Completed2018$10.600 billion[citation needed]
PhilippinesBataan–Cavite Interlink BridgeBataan-Cavite2023In progress$3.75 billionA 32 km (20 mi) bridge over Manila Bay that will connect Central and Southern Luzon.[124]
Manila Metro Rail Transit SystemMetro Manila1996In progress2028 proj.$15.845 millionOne line operational as of 2020. It is expected to have a total of eight lines with a total length of 142 km (88 mi).[125][126][127]

[128][129][130]

Mindanao Railway expansionMindanao[131]
New Manila International AirportBulacan2022In progress2027 (proj.)$14.111 billionAims to decongest and eventually replace Ninoy Aquino International Airport. It will be operated by the San Miguel Corporation.[132]
North–South Commuter RailwayMetro Manila, Central Luzon2019In progress2029 proj.$14.95 billionThe railway will connect Clark International Airport with Metro Manila and Calabarzon.[133]
PNR South Long HaulLuzonIn progress2027 (proj.)$3.45 billion[134]
South Luzon Expressway expansionMetro Manila, Calabarzon2006In progress$2.278 billionIncludes Toll Road 4 from Calamba to Lucena, Toll Road 5 from Lucena to Matnog, and the Pasig River Expressway.[citation needed]
QatarDoha MetroDohaIn progress2026 (proj.)$36 billionConstruction will add 300 km (190 mi) of track.[citation needed]
Qatar Expressway ProgrammeDohaIn progress$28 billion USD (CAPEX)This programme aims to deliver more than 800 km (500 mi) of new or upgraded roads and more than 200 interchanges in Qatar. It is part of the Qatar National Vision 2030. One of the motivating factors was the 2022 FIFA World Cup.[135]
Saudi ArabiaKing Abdulaziz International Airport expansionJeddah2006Completed2019$7.2 billion[citation needed]
Riyadh MetroRiyadh2014Completed2024 (proj.)$23.5 billion[136]
SingaporeCross Island MRT LineNationwide2023In progress$40.7 billion SGD[citation needed]
Changi Airport Terminal 5Asia–Pacific2022In progressMid-2030s (proj.)$10 billion USDThe terminal will be able to handle a capacity of 70 million passengers a year upon completion.[citation needed]
Marina Coastal ExpresswayNationwide2008Completed2013$4.3 billion SGDFirst undersea expressway in Singapore.[137]
Tuas Mega PortIn progress$20 billionTuas Port will be able to handle 65 million twenty-foot equivalent units (TEUs) annually, almost double the 36.9 million TEUs that Singapore handled in 2020.[citation needed]
South KoreaIncheon International AirportSeoul Capital Area1992Completed2024 (proj.)Over 3,903 trillionIntended to replace Gimpo International Airport[138][139]
ThailandHigh-speed rail in ThailandCentral, Western and Southern ThailandIn progress2037 (proj.)$30 billionThe project consists of four high-speed rail corridors: one international corridor, which will be a part of the Kunming–Singapore Railway project after completion.[citation needed]
VietnamLong Thanh International AirportHo Chi Minh City2019In progressAfter 2035 (proj.$7.8 billionThis project is partially operational.[citation needed]
UAEAl Maktoum International AirportDubaiIn progress2030 (proj.)$82 billionUpon completion, it will be the largest airport in the world.[140]

Europe

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
CroatiaPelješac BridgeDubrovnik-Neretva County2018Completed2022Around €420 million (€357 million of EU funds)The bridge links the Croatian exclave to the rest of the country while bypassing Bosnia and Herzegovina's short coastal strip at Neum.[141]
Czech RepublicBlanka tunnel complexPrague2006Completed2015$1.97 billionThe longest city tunnel in Europe at 5.5 km (3.4 mi)[citation needed]
Denmark/GermanyFehmarn Belt fixed linkLolland, Fehmarn2021In progress2029€10 billionAn immersed tunnel connection the Danish island of Lolland with the German island of Fehmarn.[citation needed]
European UnionTEN-T Core NetworkEuropeIn progressMore than €600 billionThe purpose of the project is to connect nine European Corridors. The Trans-European conventional rail network is part of the EU megaproject to help alleviate and assist in the transport of goods throughout the 27 EU member states.[142][143]
FranceGrand Paris ExpressParis2015In progress2030 (proj.)$45 billionLines will be opened in stages between 2024 and 2030.[citation needed]
GermanyGerman Reunification Transport Projects Number 8Berlin Central Station and Nuremberg Main StationIn progress$10 billionProposed after German Reunification, this is a set of major construction projects meant to increase and improve transport links between East and West Germany.[citation needed]
GreeceAthens MetroAthens2021In progress2032 (proj.)€5.75 billionLines 1, 2 and 3 are already operational and are undergoing upgrades.[144][145][146]
Egnatia OdosIgoumenitsa-Kipoi1994Completed2009€5.93 billionThis project was built alongside the general route of the ancient Roman Via Egnatia and consisted of 670 km (420 mi) of motorways.[147]
Egnatia RailwayAlexandroupolis-IgoumenitsaApproved€10 billionProposed in 2017; upon completion, it will be Europe's largest railway megaproject.[148][149]
A5 motorway (Ionia Odos)Ioannina-Gulf of Corinth2006Completed2017Over €1.1 billionAs part of this project, 196 km (122 mi) of motorways were built.[150]
Thessaloniki MetroThessaloniki2006Completed2024 / 2026€2.26 billionThe purpose of the project is to create a 35-station underground rapid transit system in Greece's second-largest city. Construction was delayed due to the Greek government-debt crisis.[151]
ThessalonikiKavalaXanthi railwayNorthern Greece2025In progress2030s (proj.)€1.25 billionA new electrified railway line running parallel to the A2 motorway, cutting travel times and will replace the existing Thessaloniki–Alexandroupoli railway which was built during the Ottoman Empire. It forms part of the Egnatia Railway.[152]
Tithorea-Domokos bypassPhthiotis Municipality1997Completed2019€1.8 billionA total of 106 km (66 mi) of high-speed railways were built as a bypass to the existing conventional mountainous railway line linking Thessaloniki with Athens, including 35.5 km (22.1 mi) of tunnels and 6.8 km (4.2 mi) of bridges.[153][154]
ItalyStrait of Messina BridgeSicily and Calabria2024Proposed2032€11 billionIf fully approved and built, the bridge will be the longest suspension bridge in the world, surpassing the 1915 Çanakkale Bridge in Turkey, the world's current longest suspension bridge span as this Messina Bridge will be 60% more than the main span. The bridge could also potentially be part of the Berlin–Palermo railway axis (Line 1) of the Trans-European Transport Networks (TEN-T).[155]
MontenegroBar-Boljare motorwayBar, Boljare2015In progress2022$3 billionThe highway is 40.871 km (25.396 mi) long ad tunnels and bridges make up about 60% of the entire route. The first section between Podgorica and Mateševo opened in July 2022.[citation needed]
NorwayCoastal Highway E39Trondheim-Kristiansand2018In progress382 kr billionThe purpose of the project is to replace all ferry links along the route with fixed connections to reduce travel time from 21 hours to 11 hours. Construction is uncertain and each project will be evaluated separately.[citation needed]
InterCityØstlandetIn progress2034 (proj.)50 kr billion (2022)Project to connect all major towns in the vicinity of Oslo by a double-rail line.[citation needed]
Fornebu LineOslo, Bærum2020In progress2027 (proj.)13.32 kr billionA new metro line stretching from Majorstuen to Fornebu through Oslo.[citation needed]
PolandCentral Transport HubGmina BaranówProposedMore than $8 billionAirport/train station in Warsaw. Phase 1 is scheduled to open in 2027.[156]
PortugalVasco da Gama BridgeLisbon1995Completed1998$1.1 billionIt is the longest bridge in Europe (including viaducts), with a total length of 12.3 km (7.6 mi), including 0.8 km (0.50 mi) for the main bridge and 11.5 km (7.1 mi) in viaducts.[citation needed]
Porto–Lisbon high-speed rail linePorto-LisbonIn progress2030+(proj.)€4.5 billionWhen completed, the project will shorten journey time between the two cities to 75 minutes.[157]
SerbiaBelgrade MetroBelgrade2021In progress2028 (proj.)$5 billionThis construction will includes 43 stations and 2 lines.[citation needed]
Belgrade-Boljare motorwayBelgrade, BoljareIn progress$2.5 billionPart of the Belgrade-Bar motorway. The second section is the most expensive section of the entire motorway due to unfavourable terrain, requiring the construction of many tunnels and bridges.[citation needed]
Belgrade WaterfrontBelgrade2014In progress$3.5 billionAn urban renewal development project.[citation needed]
Serbia-HungaryBudapest–Belgrade railwayBudapest-Belgrade2021In progressAround $5 billionThis will connect the two capitals by high-speed rail. This is stage one of the Budapest–Belgrade–Skopje–Athens railway, which itself is part of China's Belt and Road Initiative.[citation needed]
Serbia /
North Macedonia /
Greece
Morava-Vardar CanalSerbia, North Macedonia, GreeceProposed$17 billionThis would make Great Morava and South Morava accessible to boats from Thessaloniki and make Morava and Vardar navigable rivers, and clean them for passage of boats. China has a vested interest in building the canal.[why?][158]
SloveniaDivača–Koper Railway upgradeSlovenia2021In progress2025 (proj.)$1.175 billionThis 27.1 km (16.8 mi) railway will better connect inland regions with the seaside and port of Koper.[159][160]
SwitzerlandGotthard Base TunnelAlps1999Completed2015CHF 9.56 billionAt 57 km (35 mi), it became the world's longest and deepest rail tunnel upon its completion in 2015.[citation needed]
Turkey1915 Çanakkale BridgeÇanakkale2017Completed2022$2.7 billionThe bridge is the longest suspension bridge in the world[citation needed]
Eurasia TunnelIstanbul2011Completed2016$1.24 billionIt is the first road tunnel connecting the Asian and European continents underneath the seafloor.
Istanbul AirportIstanbul2014Completed2018$22 billionIt replaced the existing Atatürk Airport.
MarmarayIstanbul2004Completed2013$4.1 billionMarmaray is the first standard gauge rail connection between Europe and Asia.
Osmangazi BridgeGebze2013Completed2016$1.2 billionThe bridge was upon opening the longest suspension bridge in Turkey
Yavuz Sultan Selim BridgeIstanbul2013Completed2016$4.5 billionIt is one of the world's widest suspension bridge
United Kingdom Expansion of Heathrow AirportLondonProposed$25.24 billion USDThis construction would add a third runway and an additional terminal.[161]
Irish Sea BridgeIrish Sea
-
Cancelled£335 billionAbandoned due to cost.[162]
High Speed 2Greater London, South East England, West Midlands2020In progress, partially cancelled2040 (proj.)£98 billion[163]
London Crossrail Project Elizabeth lineGreater London, Berkshire, Buckinghamshire, Essex2009Completed2022£18.8 billionFully operational by May 2023.[164]
M8 motorwayGlasgow-Edinburgh2015Completed2017£30 million[165]
Northern Powerhouse RailNorthern EnglandProposed2033 (proj.)£14.75 billionSometimes referred to as High Speed 3.[166]
East West Rail Southern England 2011In progress2030s (proj)£1.085 billionUnder construction
Oxford–Cambridge ExpresswaySouthern England2016Cancelled £3 billion (est) Cancelled due to cost in 2021 [167]
Lower Thames Crossing Kent, Essex 2009 Proposed 2031 (est) £9 billion (est)
Crossrail 2 Surrey, Greater London,Hertfordshire 2020s (planned) Proposed 2030s
to 2040s
£31.2 billion (est) On hold due to COVID-19 [168]

North America

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
CanadaTrans Mountain Expansion ProjectEdmonton, Alberta to Burnaby, British Columbia2004Completed2024CA$34 billionPipeline expansion constructed in stages along the existing Trans Mountain Line from Edmonton to Burnaby. The pipeline looped Kinder Morgan's existing 60 cm pipeline with a new 76 cm pipeline. TMX-1, the Anchor Loop, was completed in 2008 including 7 new pump stations and upgrading 6 existing pump stations ($210 million). TMX-2 included 243 km of 30- and 36-inch pipe between Valemount, British Columbia and Kamloops and back to Edmonton. In spring 2012, Kinder Morgan received customer commitment resulting in an increased planned expansion to 750,000 barrels/day. A total of 900 km of twinned pipeline was part of the expansion project. Regulatory approval was received from the National Energy Board, and a final investment decision was reached in May 2017. Construction of the pipeline was completed with commissioning taking place in spring 2024.[169]
Southwest Calgary Ring RoadCalgary2016Completed2021More than $5 billionPart of the CANAMEX Corridor and the Stoney Trail.[170]
West Calgary Ring Road[clarification needed]Calgary2019Completed19 December 2023More than $1 billion[citation needed]
Calgary LRT ExpansionCalgary2022In progress2026 (proj.)More than $4.5 billion[citation needed]
New Champlain Bridge Corridor ProjectQuébec2015Completed2019$4.24 billionReplaced the existing Champlain Bridge.[citation needed]
Confederation BridgeThe Maritimes1993Completed1997$1.3 billionThe 12.9 km (8.0 mi) bridge is the longest bridge in the world crossing ice-covered water.[citation needed]
Confederation LineOttawa2013Completed2019$2.1 billionThe largest project in Ottawa since the Rideau Canal.[171] (Phase 1).
Crowchild Trail UpgradesCalgaryAfter 2027 (proj.)Approved2030 (proj.)More than $3 billion[citation needed]
Gordie Howe International BridgeWindsor, Ontario2018Completed2026$5.7 billionInternational cable stayed bridge over the Detroit River between Canada and the United States.[citation needed]
Line 5 EglintonToronto2011Completed2026$9.1 billion[170]
Port Mann BridgeVancouver2009Completed2015$1.93 billionThe widest bridge in the world at the time of opening. The cable-stayed bridge uses 288 cables to reach the total bridge length of 6,866 ft (2,093 m)
Broadway SubwayVancouver2019In progress2027$2.95 billionThe Broadway Subway Project is a 5.7 km extension of the Millennium Line, from VCC-Clark Station to Broadway and Arbutus.[172]
Réseau Express MétropolitainMontréal2018In progress2027 (proj.)$6.95 billionPartly operational beginning in July 2023, with other parts expecting to be opened in stages between 2024 and 2027.[170][173]
Costa RicaOrotina Mega AirportOrotina[citation needed]
Green Costa Rican Canal[citation needed]
Electric Train of The Great Metropolitan Area[citation needed]
MexicoDurango-Mazatlán HighwayDurango-Sinaloa2008Completed2012$1.4 billionThe Baluarte Bridge, which is part of the highway, received a Guinness World Record for being the highest suspension bridge in western Mexico.[citation needed]
Mexico City Texcoco AirportMexico City
-
Cancelled
-
$13.3 billionAfter taking office, President Andrés Manuel López Obrador cancelled this mega-project in favor of a "metropolitan airport system", which kept the two-runway Mexico City International Airport from being decommissioned.[citation needed]
Felipe Ángeles International AirportMexico City2019In progress2032–2050 (proj.)$7.1 billionThe airport's first terminal and two runways were opened in 2022, though long-term expansion projects and master plan completions extend out toward 2032 and 2050.[citation needed]
Panama4th bridge over the Panama CanalPanama CanalIn progress$1.4 billion[citation needed]
Panama Metro line 1Panama City2010Completed2014$1.8 billion[citation needed]
Panama Metro line 2Panama City2015Completed2019$2 billion[174]
Panama Metro line 3Panama City2021In progress2025 (proj.)$2.6 billion[175]
United StatesAlaskan Way Viaduct replacement tunnelSeattle2007Completed2019$3.1 billion[citation needed]
Big DigBoston1991Completed2007$14.6 billion($24.3 billion after interest)[citation needed]
Brightline WestLas Vegas Valley-Greater Los Angeles2023 (proj.)In progress2027 (proj.)$10 billionThis link would connect with the California High-Speed Rail.[citation needed]
California High-Speed RailLos Angeles-San Francisco2015In progress2030 (proj.)$100 billionA 1,300 km (810 mi) high-speed rail system is expected to be completed in phases up to 2030.[citation needed]
Chicago Region Environmental and Transportation Efficiency ProgramChicagoIn progress2025 (proj.)$4.6 billionCREATE is a railway improvement program consisting of 70 projects, including the construction of grade separations, overpasses, and other rail projects.[176]
East Side AccessManhattan and Queens2007Completed2023More than $11.1 billionThis network expansion project intended to increase direct services into Grand Central Terminal and decrease congestion in Midtown Manhattan. It also provides regular access from the New Haven and Hudson Lines to Penn Station.[citation needed]
Evergreen Point Floating BridgeSeattle2011Completed2016$4.56 billionThis 2,350 m (7,710 ft) long floating bridge is the longest of its type in the world; its predecessor previously held the title.[citation needed]
Hampton Roads Bridge–Tunnel ExpansionHampton Roads2020In progress2027 (proj.)More than $3.9 billionThis project will widen the current four-lane segments to eight lanes along nearly 10 mi (16 km) of the Hampton Roads Beltway corridor from Hampton to Norfolk, Virginia with new twin tunnels.[177]
Interstate Highway SystemNationwide1956Completed2018$500 billion[citation needed]
John F. Kennedy International Airport RedevelopmentNew York City2020In progress2026 (proj.)$19 billionPhase 1, which covers Terminals 1, 4, 6, and 8, is expected to be completed by 2026. The redevelopment project aims to rebuild passenger facilities and approaches to the airport.[178]
LaGuardia Airport ProjectNew York City2016Completed2022$8 billionA complete retrofit of the airport was completed on time and on budget by 2022.[179]
Los Angeles International AirportLos Angeles2017In progress2028 (proj.)$14 billionRenovation of existing terminals, as well as new terminals and infrastructure.[180]
Newark Airport Terminal ANewark2018Completed2023$14 billionConstruction added a new parking garage, 33 gates, and a walkway connecting the AirTrain, parking garage, and terminal.[181]
Norfolk Southern Railway Crescent Corridor ExpansionNortheast to Southeast regions; New York and Philadelphia to Atlanta and New Orleans2010Completed2013$2.5 billionA public-private partnership between Norfolk Southern (NS), the Federal Government, and the various state governments impacted by the 2,500 mi (4,000 km) corridor. Project involved construction of 4 new intermodal terminals, expansion of several other NS railyards, and double-tracking and siding improvements at strategic locations along the corridor.[182][183][184]
O'Hare Modernization PlanChicago2001Completed2021$8.8 billionChicago's O'Hare Modernization Plan is a massive project transforming the airport's airfield and terminals for a 21st-century global hub, featuring new runways for efficiency, expanded concourses (like Concourse D), a new Global Terminal, upgraded T5, better roadways, and improved passenger experience.[185][186]
Ohio River Bridges ProjectLouisville, Kentucky2014Completed2016$2.3 billionThe project involved reconstructing the Kennedy Interchange, the completion of two new Ohio River bridges and the reconstruction of ramps on Interstate 65. The final project omitted some features of the original plan.[187]
Project ConnectAustin, Texas2021In progress2034$7.1 billionPublic transit expansion including the construction of two new light rail lines, a new commuter rail line, and a bus rapid transit line. The project has undergone several cuts since its passing in 2020.[188][189]
Puget Sound Gateway ProgramSeattle & Tacoma, Washington2015In progress2028 (proj.)$2.38 billionThis project includes the completion of SR 167 between Puyallup and Tacoma and of SR 509 from I-5 to Burien.[190]
Reagan Airport's Project JourneyWashington, D.C.2018Completed2021$1 billionThis renovation introduced a new security building and checkpoints and added a new 14-gate concourse.[191]
San Francisco International Airport RedevelopmentSan Francisco2016Completed2024$2.4 billionThe airport began a multiphase renovation project to turn Terminal 1 into a more environmentally friendly passenger facility.[192]
Eastern span replacement of the San Francisco–Oakland Bay BridgeSan Francisco-Oakland, California2002Completed2013$6.4 billionThe eastern span replacement of the San Francisco–Oakland Bay Bridge was a construction project to replace a seismically unsound portion of the Bay Bridge with a new self-anchored suspension bridge (SAS) and a pair of viaducts. The bridge is in the U.S. state of California and crosses the San Francisco Bay between Yerba Buena Island and Oakland.[193]
Second Avenue Subway ProjectManhattan1972In progress2027 (proj.)$17 billionThe proposed full line would be 13.7 km (8.5 mi) long, with 16 stations and a projected ridership of 560,000 people. Phase 1 opened in 2017.[194]
Washington Metro Silver LineWashington, D.C.2009Completed2022$6.8 billionPhase 1 included the creation of a new line through Tysons which opened in 2014. Phase 2 expanded this line to Dulles International Airport and beyond, and opened in 2022.[195]
Sound Transit 3SeattleLate 2020s (proj.)Planned2041 (proj.)$50 billionThis project is to expand the current light rail and bus system currently used by the city and is to be completed in stages from 2024 to 2041.[196]

South America

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
Brazil São Paulo Metro São Paulo 1968 Under construction $22.5 billion Continuous expansion over decades. Largest subway system in Latin America. [197]
Rio–Niterói Bridge Rio de Janeiro 1969 Completed 1974 [198]
Trans-Amazonian Highway North and Northeast Region of Brazil 1970 Completed 1972 $1.5 billion [199]
Great Carajás Project Pará and Maranhão 1978 Completed 1986 $2.9 billion Construction of the Carajás Railway and Ponta da Madeira Port, along with investments in the Carajás mine and its processing plant. [200][AI-retrieved source]
North–South Railway National 1987 Completed 2023 $2.6 billion [201]
Transnordestina Railway Northeast Region of Brazil 2006 Under construction 2029 (proj.) $2.8 billion [202]
West–East Integration Railway Bahia and Tocantins 2011 Under construction 2027 (proj.) $1 billion [203]

Oceania

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
AustraliaCentral Station RedevelopmentSydney-EveleighProposed$10 billionExtension of Sydney's CBD with an approximately 3 km (1.9 mi) long renewal corridor[204]
Cross River RailBrisbane2017In progress2026 (proj.)$5.4 billionUpon completion, it will be the first rail-only Brisbane River crossing since the completion of the Merivale Bridge in 1978[205]
Metro TunnelMelbourne2017Completed2025$11 billionThis construction includes two 9 km (5.6 mi) rail tunnels and five new underground stations.[citation needed]
North East LinkMelbourne2020In progress2028 (proj.)$15.8 billionThis will connect the M80 Ring Road to the Eastern Freeway.[citation needed]
OneSKYCanberraIn progress2024 (proj.)$2 billionReplacement for the Australian Advanced Air Traffic System.[206]
Suburban Rail LoopMelbourne2022In progress2050 (proj.)$50 billionThe East and North sections, the two main ones, are planned to form a single 60 km (37 mi), fully automated orbital metro line through the middle suburbs. Construction began on SRL East in 2022.[207]
NorthConnexSydney2015Completed2020$2.65 billion9-kilometre twin-tunnel motorway in Sydney, Australia, connecting the M1 Pacific Motorway (Wahroonga) to the M2 Hills Motorway (West Pennant Hills)[citation needed]
WestConnexSydney2017Completed2023$45 billion (2017)33 km (21 mi) of new and expanded motorways, largest road tunnelling project in Australia.[citation needed]
Sydney Metro City & SouthwestSydney2017In progress2024 (proj.)$20.5 billion (2023)30 km (19 mi) rapid transit railway line.[208]
Sydney Metro WestSydney2020In progress2033 (proj.)$27 billion AUD24 km (15 mi) rapid transit railway line.[209]
Inland RailBrisbaneMelbourne2018In progress2030–31 (proj.)$31 billion AUD (2022)1,600 km (990 mi) freight rail line between the cities of Melbourne and Brisbane.[citation needed]
Western Sydney International AirportGreater Sydney2018In progress2026 (proj.)$5.3 billionAn airport located in Luddenham and Badgerys Creek.[citation needed]
Western Harbour TunnelSydney Harbour2021In progress2028 (proj.)$14 billionThe six lane, 6.5-kilometre (4.0 mi) twin tunnels will run from Cammeray to Rozelle, passing beneath Sydney Harbour.[citation needed]

Planned cities and urban renewal projects

[edit]

Africa

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
EgyptMadinatyCairo Governorate2006In progress$10 billionHousing project.[210]
New Administrative CapitalCairo Governorate2015Completed2024$250 billionPhase 1 of 3 is completed; phase 2 to start construction in 2026. The full project is expected to house 6,500,000 people.[citation needed]
New Alamein CityMatrouh Governorate2015In progress$60 billionConstruction is spread out over three phases.[citation needed]
Galala CitySuez Governorate2018In progress$63 billionConstruction is spread out over three phases. Phase 1 has been completed.[211]
New Mansoura CityCairo Governorate2017In progress$3.7 billion[citation needed]
EthiopiaChaka ProjectAddis Ababa2022In progress$16 billion[citation needed]
KenyaKonza TechnopolisKonzaPlanned$14.5 billionPart of Kenya Vision 2030.[citation needed]
NigeriaAbujaFederal Capital Territory1980sCompletedAbuja has been the capital of Nigeria since 1991 and is among the four largest urban areas in Nigeria.[212]
Asokoro IslandAbujaIn progress$1 billionA peninsula development located in Abuja's Asokoro district on approximately 60 hectares (150 acres) of land.[213][214]
Centenary CityFederal Capital Territory2014In progress$18 billionA planned smart city to mark the country's centennial anniversary. It is expected to house 400,000 residents.[215]
Eko AtlanticLagos State2007In progress$6 billionThis planned city is being built on land reclaimed from the Atlantic Ocean. Upon completion, the project anticipates at least 250,000 residents and an additional daily flow of 150,000 commuters.[216]
Festac Town Phase 2Lagos StateIn progress$2.4 billionPhase 2 of the development was approved in 2014.[217]
LekkiLagos StateIn progressPhase 1 was completed and is currently in use. Other phases of the project include areas for free-trade zones, an airport, and a seaport. The completed city is expected to accommodate more than 3.4 million residents with an influx of 1.9 million commuters.[218]
South AfricaModderfontein New CityJohannesburg Metropolitan Municipality
-
Abandoned
-
$7.8 billion[219][220][221]

Asia

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
AzerbaijanKhazar IslandsBaku ArchipelagoStalled$100 billion USDArtificial archipelago consisting of 41 islands spreading 3,000 hectares (7,400 acres). It is expected to house 1 million people upon completion.[citation needed]
IndiaChennai Bangalore Industrial CorridorChennai-BangaloreIn progress[citation needed]
Delhi Mumbai Industrial CorridorDelhi-MumbaiIn progress2037 (proj.)$90 billionThe project aims to create seven smart cities distributed along the backbone of the freight corridor between Delhi and Mumbai.[citation needed]
Dholera SIRGujaratPlannedBefore 2040 (proj.)Part of India's Smart Cities Mission.[citation needed]
Gujarat International Finance Tec-CityGujarat2007In progress2025 (proj.)$20 billionIndia's first International Financial Services Centre. The city is operational, with the fourth and final phase of the project commencing in 2021.[223][224]
Mumbai-Bangalore Economic CorridorBangalore-MumbaiProposed[citation needed]
Navi MumbaiIndiaIn progress$13.4 billionWorld's largest planned city. Contains a population of 2.6 million.[225]
Visakhapatnam–Chennai Industrial CorridorVizag-ChennaiProposedPart of the East Coast Economic Corridor.[citation needed]
IndonesiaAncol DreamlandJakartaCompleted600 hectares (1,500 acres) integrated tourism area.[citation needed]
BSD CityGreater JakartaCompleted19896,000 hectares (15,000 acres)[citation needed]
Lippo CikarangGreater Jakarta1990Completed$18.75 billionA township and industrial park on 332 hectares (820 acres) of land.[citation needed]
Pantai Indah KapukJakartaCompletedA prestigious gated community.[citation needed]
NusantaraModern-day East Kalimantan2022In progressSet to replace Jakarta as the capital.[226]
IranIran MallTehran2010Completed2018200,000 billion IRR

CBI Rate equivalent US$5.2 billion

The project spans more than 1.6 million m2 (17 million sq ft) that includes shopping mall, two tower, two 5-star hotels, and a lake.[227][228]
IraqThe Bride of the GulfBasraProposedPart of Basra's project to rebuild.[citation needed]
Bismayah city Baghdad In progress $10 billion Part of Iraq plan to rebuild the country
Iraq gate Baghdad Completed 2024 750 million Part of Iraq's plan to expand the real estate market
Baghdad Meteo Baghdad In progress 2029 $17 billion World's 2nd largest driverless metro
JapanRoppongi HillsTokyo2000Completed2003$4 billion USDOne of Japan's largest integrated property developments.[citation needed]
Sky Mile TowerTokyoProposed2045 (proj.)If built, construction would conclude around 2045. The tower would stand 1.7 km (5,600 ft) high and have a capacity of around 55,000 people.[citation needed]
JordanAbdali ProjectAmmanIn progress$5 billion USDThis project is being developed on 384,000 m2 (0.148 mi2) of land, intending to create a total built-up area of over 1,700,000 m2 (0.66 mi2).[229][230]
KuwaitMadinat al-HareerKuwait2019In progress$632 billion USDA 250 km2 (62,000 acres) planned urban area.[citation needed]
MalaysiaForest CityJohor BahruIn progress2035 (proj.)$100 billion USDA private town on reclaimed land.[citation needed]
Iskandar MalaysiaJohor Bahru2006In progress$100 billion USD[citation needed]
KL River CityKuala LumpurIn progressRm16.5 billionRehabilitation project along the Gombak River.[231]
Melaka GatewayMalacca City2014In progress2025 (proj.)$400 billion USD[citation needed]
Merdeka 118Kuala Lumpur2016Completed2023Rm5 billionUpon completion, it became the tallest building in Malaysia.[citation needed]
PutrajayaSepang District1995Completed$8.1 billion USDIn 1999, most of the seats of government moved from Kuala Lumpur to Putrajaya.[citation needed]
PakistanBahria ParadiseKarachiIn progressPart of Bahria Town[citation needed]
Bahria TownKarachi2014In progress$1 billion USDA gated community near Karachi.[232]
Bundel Island CityKarachiProposed$50 billion USDWhile the project has been long proposed, it has never materialized due to environmental concerns, especially the threat to mangroves, and objections from the Sindh Government.[citation needed]
Capital Smart CityIslamabadPlannedA planned housing development and smart city near New Islamabad International Airport.[citation needed]
Crescent BayKarachi2006In progress2050 (proj.)$2.4 billion USDAn upscale, mixed-use oceanfront development in Karachi.[citation needed]
DHA City (DCK)KarachiPlannedUpon completion, the new city anticipates at least 250,000 residents and a daily flow of 50,000 commuters.[233][234]
Gwadar PortGwadar$62 billion[citation needed]
IslamabadIslamabad Capital Territory1960sCompleted24 billionReplaced Karachi as Pakistan's capital city. Islamabad has a population of 2.2 million.[235]
LDA CityLahoreIn progressThe city is to be built on a 3,059 hectares (7,560 acres) piece of virgin land and is the largest housing development in Punjab.[236]
Port Tower ComplexKarachiPlanned$350 million USDThe 593 m (1,946 ft) tall skyscraper will be situation on a manmade island and, upon completion, will be the tallest building in South Asia.[citation needed]
Ravi Riverfront Urban Development ProjectLahore2020In progress$41.04 billion USD70,000-acre urban development along both sides of the Ravi River.[237][238][239]
ChinaTodtownShanghai2014Completed2022$1.5 billion USDA mixed-use development.[citation needed]
PhilippinesBonifacio Global CityMetro ManilaCompletedPreviously occupied by the Philippine Army headquarters, it is currently one of Metro Manila's main central business districts.[citation needed]
Eastwood CityQuezon CityCompletedA high-density mixed-use development.[citation needed]
Entertainment CityManila BayIn progress$15 billion USDAn entertainment complex intended to be the Philippine counterpart of Macau and Las Vegas. It is built upon reclaimed land along Manila Bay.[citation needed]
Lancaster New City Zone 1 and Zone 2CaviteIn progress2,000 hectares (4,900 acres) planned community.
New Clark CityTarlac, PampangaIn progress3.2 billionA 9,450 hectares (23,400 acres) planned city modeled after South Korea's Songdo City.[citation needed]
NuvaliLagunaIn progress2,290 hectares (5,700 acres) planned community.
Palestine Rawabi RamallahJerusalem Completed $1.4 billion
Lana Jerusalem In progress
QatarLusailAl Daayen MunicipalityCompleted$45 billion USDHost city of the 2022 FIFA World Cup. As of 2022, it has a population of 198,600 people.[citation needed]
Saudi ArabiaJeddah Economic CityJeddah2013In progress2030 (proj.)SAR75 billionThe centerpiece of the development project will be the SAR4.45 billion Jeddah Tower, a tower planned to become the tallest in the world.[citation needed]
Jeddah TowerJeddah2013In progress2028 (proj.)SAR100 billionThe Jeddah Tower is planned to be the first 1-kilometre-tall (3,281 ft) building and would be the world's tallest building or structure upon completion, standing at least 180 m (591 ft) taller than the Burj Khalifa.[240][241][citation needed]
King Abdullah Economic CityMecca ProvinceIn progress$100 billion USDPhase 1 was completed in 2010.[citation needed]
King Abdullah Financial DistrictRiyadhIn progress$78 billion USDOne of five phases has been completed.[citation needed]
Masjid al-HaramMeccaCompleted2020$100 billion[citation needed]
NeomTabuk Province2017In progress2039 (proj.)$500 billion USDA planned urban area containing The Line and Neom Bay Airport.[242][243]
South KoreaSejong CitySejong City2014In progress2030 (proj.)Set to replace Seoul as the capital city of the country.[244]
Sri LankaColombo Port CityColombo2014In progress2041 (proj.)$15 billion USDA reclaimed offshore city that serves as a special economic zone and international financial centre.[245]
Thailand One Bangkok Bangkok 2018 In progress 2030 $3.9 billion
Iconsiam Bangkok 2014 Completed 2018 $1.5 billion
Dusit Central Park Bangkok 2019 In progress 2026 $1.5 billion
United Arab EmiratesBurj Al ArabDubai1994Completed1999AED3.7 billionThe third tallest hotel in the world.[citation needed]
Burj KhalifaDubai2004Completed2009AED5.51 billionThe tallest building in the world since its grand opening in January 2010.[citation needed]
Business BayDubaiIn progressAED110.18 billionOnce completed, it will be the region's business capital and will be composed primarily of office and residential towers.[citation needed]
Dubai Creek TowerDubai2016In progressAED3.67 billionWhen completed, it will surpass the height of the Burj Khalifa, the world's tallest building since 2010.[citation needed]
Dubai International CityDubai2004In progressAED348.65 billionThe city is expected to house 60,000 residents when completed.[citation needed]
Dubai MarinaDubaiIn progressA district of Dubai and the world's largest manmade marina. The area is operational and continues to undergo development.[citation needed]
Dubai Meydan CityDubaiIn progressAED8.08 billion[citation needed]
Dubai WaterfrontDubai
-
Cancelled
-
After persistent erosion issues and the 2008 financial crisis, the project was cancelled.[citation needed]
DubailandDubai2003In progress2025 (proj.)AED245.99 billionOriginally intended to be the largest leisure development in the world, Dubailand faced financial trouble during the 2008 financial crisis. Plans have been scaled down since.[citation needed]
Falconcity of WondersDubai2005In progress$36.5 billion USD[citation needed]
Jumeirah Garden CityDubaiStalledAED348.65 billion[citation needed]
Mall of the WorldDubaiPlanned2029 (proj.)$6.8 billion USDUpon completion, this will be the world's largest shopping mall.[citation needed]
Masdar CityAbu Dhabi2006In progressAED80.8 billionThe city will rely entirely on solar energy and other renewable energy sources, with a sustainable, zero-carbon, zero-waste ecology and will be a car free city.[citation needed]
Palm DeiraDubai2005One of the Palm Islands.[citation needed]
Palm Jebel AliDubai2001Stalled$4 billion USDOne of the Palm Islands.[citation needed]
Palm JumeirahDubai2001Completed$12.3 billion USDA large manmade island in the shape of a palm tree.[citation needed]
The UniverseDubaiIndefinite holdA planned artificial archipelago in the shape of the Milky Way and Solar System.[citation needed]
The WorldDubai2003In progress$14 billion USDAn artificial archipelago of various small islands constructed in the rough shape of a world map[citation needed]
Yas IslandAbu DhabiIn progress$36 billion USDA leisure island that is home to Yas Marina Circuit, which has hosted the Formula One Abu Dhabi Grand Prix since 2009.[citation needed]

Europe

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
FranceEuropa CityGonesse2016Cancelled2019€3.07 billionConstruction began in 2016 but was cancelled in 2019 due to local opposition and concerns about the project's environmental impact.[citation needed]
La Défense (1958–2014)Paris metropolitan area1958Completed2014More than Fr41.972 billionLa Défense is Europe's largest purpose-built business district.[citation needed]
La Défense (2016–present)Paris metropolitan area2016In progressMore than €903 millionThis project includes modernization and refurbishment of the existing area, as well as the addition of green spaces.[citation needed]
GermanyPotsdamer Platz RedevelopmentBerlinCompleted[citation needed]
HafenCityHamburg2003In progress2030 (proj.)One of the largest urban redevelopment projects in Europe by landmass.[citation needed]
Germania (city)Berlin1938HaltedA complete rebuild of Berlin to the World capital of Nazi, a megalomanic architectural project of Adolf Hitler and Albert Speer.
NorwayFjordbyenOslo1980sIn progressAn urban redevelopment project.[citation needed]
Oslo Airport CityOsloIn progress[citation needed]
RomaniaEsplanada City CenterBucharest
-
Cancelled
-
$4.2 billion USDA planned multifunctional city center in Bucharest.[citation needed]
RussiaLakhta CentreLakhta, Saint Petersburg2012Completed201977.1 billionIt is the tallest building in both Russia and Europe and replaced the cancelled Okhta Center.[citation needed]
Moscow International Business CenterMoscow1995In progress2030 (proj.)More than 309 billionThe complex is home to the highest numbers of skyscrapers in Europe.[citation needed]
Okhta CenterSaint PetersburgCancelled
-
65 billionCancelled due to protests from the UNESCO World Heritage Centre, who wanted to preserve the skyline of Saint Petersburg's historic district.[citation needed]
SpainBilbao Renovation ProjectBilbao1990sCompletedA deindustrialisation process beginning in the 1990s with the construction of the Guggenheim Museum Bilbao[citation needed]
Cuatro Torres Business AreaMadrid2004Completed2021$1 billion USD (est.)A complex of four skyscrapers, including Torre Cepsa, in Madrid's financial district.[citation needed]
Madrid Nuevo NorteMadrid2021 (proj.)In progress2045 (proj.)$10.55 billion USDExpansion of the existing Paseo de la Castellana.[citation needed]
Southeast developmentsMadridIn progress2040-2050 (proj.)More than $3.5 billion USDExpansion of the city with the creation of six new neighborhoods: Los cerros, Ensanche de Vallecas, Valdecarros, El Cañaveral, Los Berrocales, and El Ahijones. These additions expect to create 145,637 homes.[citation needed]
SwedenMillion ProgrammeNationwide1965Completed1974$5 billion USD (approx.A public housing program meant to establish affordable housing.[citation needed]
Northvolt GigafactoriesSkellefteå, Västerås2021Completed2025$4.7 billion USDLithium ion battery factory development.[246]
Redevelopment of SlussenområdetStockholmIn progressKr12 billion[247]
Relocation of Kiruna CentrumKirunaIn progress2035 (proj.)$2.1 billion USD[248]
TurkeyIstanbul Financial CenterIstanbul2009Completed20237.58 billion[249]
Turkey Urban Renewal ProjectNationwide2012In progress2032 (proj.)757.84 billionFikirtepe, a neighborhood of Kadıköy has been chosen as pilot area for project.[250][251][252]

[253][254]

United KingdomBig City PlanBirmingham1994In progress2030s (proj.)£12.75 billionRedevelopment of Birmingham to escape their image of being a concrete jungle.[citation needed]
Battersea Power Station RedevelopmentLondon2012Completed2022£13.25 billionModernisation of a defunct coal power station into a shopping centre.[citation needed]
Embassy GardensLondonCompleted2019£2.1 billionResidential and business development district.[citation needed]
Greenwich PeninsulaLondon1990sIn progress2030s (proj.)£8 billion[citation needed]
Pilgrim Street EastNewcastle upon TyneIn progress2025 (proj.)More than £400 million[citation needed]
Royal WharfLondon2014In progress2020–2023£3.1 billionOriginally slated for completion in 2020, the development was nearly finished in 2021. This was mostly completed by 2020, with final phases completed around late 2023.[citation needed]
Stratford CityLondonIn progress£3.5 billionOriginally slated for completion by 2020.[citation needed]
Wembley ParkLondonIn progress2024 (proj.)£1.1 billion[citation needed]

North America

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
CanadaDowntown MarkhamOntarioIn progress2025 (proj.)CA$4 billionOne of the many city center projects in York Region.[citation needed]
Oakridge Centre RedevelopmentVancouver2019In progress2028 (proj.)CA$5 billionThis project will turn Oakridge Centre into the second largest shopping mall in British Columbia.[255]
MexicoCancún[vague]Quintana RooCompletedOne of the largest tourist destinations in North America.[citation needed]
Santa Fe, Mexico City[vague]Mexico CityCompleted[citation needed]
United States53 West 53Manhattan2015Completed2019$1.2 billionA supertall, primarily residential skyscraper. A restaurant and MoMA also lease space in the building.[256]
Apple ParkCupertino, California2014Completed2017More than $3 billionApple Inc.'s flagship headquarters.[citation needed]
Battery Park CityManhattan1970sCompletedMore than $1.4 billionA mainly residential 92-acre (37 ha) planned community at the southwestern tip of the island of Manhattan, more than 1/3 of which is parkland.[257]
Hunters Point Naval Shipyard and Candlestick Park RedevelopmentBayview–Hunters Point, San FranciscoIn progressAfter 2028 (proj.)$8 billion[citation needed]
Blue Oval CityStanton, TennesseePlanned$5.6 billionLarge-scale Ford electric vehicle complex that will include a vehicle assembly plant, a battery plant, supplier facilities, and battery recycling operations.[258]
BlueOval SK Battery ParkGlendale, KentuckyIn progress2025 (proj.)$5.8 billionLarge-scale battery plant that includes two plants that will produce batteries for Ford and Lincoln electric vehicles.[258]
Brickell City CentreBrickell district, Downtown Miami2012In progress$1.05 billionA shopping and mixed-use project that will eventually include One Brickell Centre.[citation needed]
Brickell KeyMiamiCompletedMore than $2 billionA manmade island on reclaimed land.[259]
CityCenterLas Vegas Strip2006Completed2009$11 billionThe largest privately financed development in the United States.[citation needed]
Comcast Technology CenterPhiladelphia2014Completed2017$1.5 billionNinth-tallest building in the Western Hemisphere.[citation needed]
Cornell Tech campusRoosevelt Island, Manhattan2014In progress2037 (proj.)$2 billionA graduate campus and research center for Cornell University. The first phase opened for use in 2017.[citation needed]
Encore Boston HarborEverett, Massachusetts2016Completed2019$2.5 billionA casino resort property that is the largest single private development in state history.[citation needed]
Generation ParkHouston2014In progressMore than $10 billionA 4,200-acre, privately owned and master-planned commercial development.[260]
Gigafactory 1Reno2014Completed2017$5 billionA lithium-ion battery plant owned and operated by Tesla, Inc.[citation needed]
HollywoodlandMiddletown, Ohio
-
Canceled
-
$1.3 billionA massive mixed-use development expected to include a destination entertainment district and theme park. The project was cancelled in 2022.[261]
Hudson Yards Redevelopment ProjectWest Side Yard, Manhattan2012In progress2027 (proj.)$20 billionA mixed-use real estate development.[262][citation needed]
Lincoln Yards ProjectChicagoStalled$6 billionDevelopment of 55 acres of a defunct steel mill park.[citation needed]
Miami WorldcenterMiamiIn progress$4 billionA large mixed-use development over 25 acres of land. Two buildings, including the Paramount Miami Worldcenter, opened in 2019.[citation needed]
Mission Bay RedevelopmentSan FranciscoIn progress$1 billion[citation needed]
Pacific ParkBrooklynIn progress2025 (proj.)$8 billionA mixed-use commercial and residential development project that includes Barclays Center, which opened in 2012.[citation needed]
ParkmercedSan FranciscoIn progress2035 (proj.)$1.35 billion[citation needed]
Shell Pennsylvania Petrochemicals ComplexPotter Township2017$6 billionAn ethylene cracker plant owned by Shell Oil Company. Operations began in 2022.[citation needed]
Port CovingtonBaltimore2019In progress2040 (proj.)$5.5 billion[citation needed]
Riverside SouthManhattan1997Completed2020$3 billionAn urban development project.[citation needed]
San Francisco Transbay developmentSan Francisco2005In progress2030 (proj.)$4.5 billionThis project will include a new Salesforce Transit Center. The Salesforce Tower opened in 2018.[citation needed]
Sasol Ethane Cracker Complex ProjectLouisianaIn progress$11 billionA large-scale ethane cracker complex.[citation needed]
San Diego State University Mission ValleyMission ValleyIn progress2030s (proj.)$3.5 billionAn expansion of the SDSU's campus on the former site of San Diego Stadium. Snapdragon Stadium opened in 2022.[citation needed]
Treasure Island RedevelopmentSan Francisco2016In progress2028 (proj.)$6 billion[citation needed]
Tri-County Mall RedevelopmentSpringdale, OhioProposed$1.3 billionRedevelopment of a shopping mall into a multi-use space.[citation needed]
Vista Tower ProjectChicago2016Completed2020$1 billionIt is the tallest structure designed by a woman in the world.[263]
Washington State Convention Center ExpansionSeattle2018Completed2023$1.6 billion[citation needed]
Wilshire Grand CenterLos Angeles2014Completed2017$1.2 billionAt 1,100 ft (340 m), it is the tallest building west of the Mississippi River.[citation needed]
Rebuilding of the World Trade CenterManhattan2006On hold$32 billionThis was part of the recovery from the September 11 attacks. One, Three, Four, and Seven World Trade Center Towers have been completed as of 2018.[264]

Oceania

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
AustraliaBarangaroo RedevelopmentSydney2012Completed2023 (proj.)$6 billion[citation needed]
Queen's Wharf, BrisbaneBrisbane2018Completed2024 (proj.)A$3.6 billionIntegrated resort development on the north bank of the Brisbane River.[265]
Waterfront Brisbane2022Under ConstructionTBAA$2.5 billionThe North Tower is expected to be completed in 2028, with the South Tower being completed on an unspecified later date[266]
Victorian Desalination PlantBass Coast Shire2009Completed2012$4 billionBuilt to provide more drinking water to Melbourne.[citation needed]
New ZealandChristchurch RebuildChristchurch2011In progress2027 (proj.)$17 billionRecovery from earthquakes in 2010–2011.[citation needed]

South America

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
BrazilBrasíliaBrasília1956Completed1960$21.9 billionAt the close of the 20th century, Brasília was the largest city in the world that had not existed at the beginning of the century.[267][268]
ColombiaBogotá Urban RenewalBogotáIn progress$50 billion USDIncludes building over 60 skyscrapers, 500 highrises, 3 new CBDs, a subway system, and a smart city near Usaquén[citation needed]
[edit]

Ports, waterways, canals, and locks for ships carrying passengers and cargo are built as megaprojects.

Africa

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
EgyptNew Suez CanalIsmailia and Suez Governates2014Completed2015$8.4 billion USD
Old and New Suez Canal
[citation needed]
Suez CanalIsmailia and Suez Governates1859Completed1869$100 million (1869)[citation needed]
EthiopiaGilgel Gibe III DamSouth Ethiopia Regional State2006Completed2016$1.6 billion USD[269]
Grand Ethiopian Renaissance DamBenishangul-Gumuz Region2011Completed2022$5 billion USDThe dam is located on the Blue Nile River.[citation needed]
Koysha DamSouth West Ethiopia Peoples' Region2016In progress2027$3 billion USDKoysha will be the second largest dam in Ethiopia upon completion[270]
KenyaLamu Port and Lamu-Southern Sudan-Ethiopia Transport CorridorLamuStalledKSh $2 trillion[citation needed]
NigeriaBadagry Deep Sea PortBadagryApproved$2.3 billion USDThe project, which has been stalled for years, was most recently approved in October 2022.[271][272][273]
Lekki PortLekki2015Completed2022$1.65 billion USDPhase one became operational in 2018.[274][275]
TanzaniaBagamoyo PortBagamoyo2023 (proj.)Stalled$10 billion USD[citation needed]

Asia

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
ChinaMedog Hydropower StationMêdog County, Tibet2024In progress2033 (proj.)$137 billion USDPlanned to become the world's largest hydropower facility, with an anticipated annual power generation capacity of 300 billion kilowatt-hours and 60,000 MW installed capacity.[240][276]
South–North Water Transfer Project North and south China 2003In progress $79 billion USD [277]
Three Gorges DamYiling District1994Completed2003$59 billion USD[citation needed]
Central Yunnan Water Diversion Project Yunnan 2017 Completed 2026 $12 billion USD [278]
IndiaSagar Mala projectNationwideIn progress8.5 trillionThis project includes creating six mega-ports, modernising existing ports, developing the 14 Coastal Economic Zones and Units, and enhancing port connectivity.[279]
IsraelNational Water Carrier of IsraelNationwide1953Completed1964$1.08 billion USD[citation needed]
JapanKamaishi Tsunami Protection BreakwaterKamaishi, Iwatec. 1989Completed2009$1.5 billion USDAfter three decades of development, the tsunami barrier was proven ineffective against the 2011 Tōhoku earthquake and tsunami.[citation needed]
PakistanDasu DamDasu2019In progress2015 (proj.)$4.278 billion USDThe 242 m (794 ft) tall dam will support a 4,320 MW hydropower station, to be built in two 2,160 MW stages.[280]
Diamer-Bhasha DamIndus River2020In progress2028 (proj.)$14 billion USD[281][282]
Mohmand DamMohmand District2019In progress2028 (proj.)$2.1 billion USDAn under-construction, multi-purpose, concrete-faced, rock-filled dam, which will generate 740 MW of hydroelectricity, irrigate 15,100 acres of land and control floods downstream.[283]
Sri LankaColombo Harbour Expansion ProjectColombo2008Completed2013$1.2 billion[citation needed]
Thailand Thai Canal Southern Thailand Proposed $20–25 billion

Europe

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
DenmarkEnergy islands of DenmarkNorth Sea, Baltic SeaApproved2030 (proj.)kr210 billionTwo Energy Islands will become the world's first offshore energy hubs and are estimated to initially provide 5 gigawatts of power.[citation needed]
NetherlandsDelta WorksRhine–Meuse–Scheldt delta area1954Completed1997ƒ22,412 billionA series of construction projects in the southwest of the Netherlands to protect a large area of land around the Rhine-Meuse-Scheldt delta from the sea. The project was proposed after the North Sea Flood of 1953.[citation needed]
Zuiderzee WorksNorth Sea1927Completed1933A human-made system of dams and dikes, land reclamation and water drainage work, in total the largest hydraulic engineering project undertaken by the Netherlands during the 20th century.[citation needed]
NorwayStad Ship TunnelVestland2023In progress2026 (proj.)kr3 billionA planned canal and tunnel to bypass the dangerous coast of the Stad Peninsula. When built, it will be the first full-size ship tunnel in the world.[citation needed]
TurkeyIstanbul CanalIstanbul2009Proposed$10 billionIt is an artificial sea-level waterway planned to connect the Black Sea to the Sea of Marmara[284]

North America

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
CanadaRideau CanalOntario1826Completed1832£822,804 (1834)A 202 km (126 mi) waterway built to provide a secure supply and communications route between Montreal and the British naval base in Kingston.[citation needed]
CubaNew Port of Mariel Development ProjectMarielCompleted$900 million[285]
MexicoDos Bocas RefineryTabascoPlanned[citation needed]
Port of Veracruz ExpansionVeracruzIn progress$5 billion USD[citation needed]
NicaraguaNicaragua CanalPunta Brito-Bluefields
-
Abandoned
-
$100 billion USD (est.)This shipping route was meant to connect the Caribbean Sea with the Pacific Ocean.[286]
PanamaPanama CanalColón and Panamá Provinces1904Completed1914$360 million USD[citation needed]
Panama CanalColón and Panamá Provinces2007Completed2016B/.5.25 billion
[citation needed]
United StatesIntracoastal WaterwayBoston-Brownsville, TexasCompletedA 3,000-mile (4,800 km) inland waterway along the Atlantic and Gulf of Mexico coasts of the United States.[citation needed]
Proposed interstate water pipelines to CaliforniaPacific Northwest–Calif.Proposed$110 billionSeveral proposals including $110 billion in 1991 to pipe water under the Pacific from Alaska[287]

South America

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
BrazilPorto MaravilhaRio de Janeiro1870sCompleted1910R$69.965 billionThird-busiest port in Brazil.[288]
Brazil/Paraguay Itaipu Dam Foz do Iguaçu 1971 Completed 1984 US$19.6 billion (equivalent to $59.3 billion today) Itaipu was the world's largest hydroelectric power plant from its 1984 inauguration until it was surpassed by China's Three Gorges Dam in 2012. [289]
Brazil Sobradinho Reservoir Sobradinho 1973 Completed 1979 The largest artificial lake in Brazil. [290]
Tucuruí Dam Tocantins River 1975 Completed 1984 US$7.1 billion [291]
Transfer of the São Francisco River Northeast Region of Brazil 2007 Completed 2025 US$2.6 billion [292]
Belo Monte Dam Xingu River 2011 Completed 2019 US$18.5 billion [293]

Hospitals

[edit]

Europe

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
IrelandNational Children's Hospital Ireland Dublin2016Completed2025€2.2 billion[294][295][296]

North America

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
United StatesKimmel Pavilion (NYU Langone)New York City2011Completed2018Part of NYU Langone's $6 billion campus transformation21-story, 830,000 sq ft inpatient hospital tower with 374 single rooms; includes Hassenfeld Children's Hospital[297][298]

Government and Administration

[edit]

Europe

[edit]
CountryProjectLocationStart yearStatusEnd yearCostNotesRef
RomaniaPalace of the ParliamentBucharest1984Completed1997€4 billion[299]

See also

[edit]

References

[edit]
  1. Altshuler, Alan; Luberoff, David (30 April 2003). Mega-Projects: The Changing Politics of Urban Public Investment. Brookings Institution Press. ISBN 978-0-8157-0129-3. Archived from the original on 18 January 2017. Retrieved 9 February 2016.
  2. LTV A-7 Corsair II $2.86 million light attack aircraft as of 1967
  3. Mullen, Andrew Stevens and Jethro (17 February 2016). "Airbus CEO upbeat on future of A380 after new orders". CNNMoney. Archived from the original on 18 February 2016. Retrieved 8 October 2024.
  4. "B-2 Bomber: Cost and Operational Issues Letter Report, 14 August 1997, GAO/NSIAD-97-181". Archived 8 April 2015 at the Wayback Machine United States General Accounting Office (GAO). Retrieved: 13 September 2009.
  5. "The Pacific War Online Encyclopedia: B-29 Superfortress, U.S. Heavy Bomber". pwencycl.kgbudge.com. Retrieved 8 October 2024.
  6. "B-29 Superfortress: The aircraft that bombed Hiroshima". Imperial War Museums. Retrieved 8 October 2024.
  7. "Woman to build house out of 747". BBC News. 20 April 2006. Archived from the original on 27 August 2010. Retrieved 30 December 2010.
  8. Sutter, Joe; Spenser, Jay (1 May 2007). 747: Creating the World's First Jumbo Jet and Other Adventures from a Life in Aviation. Collins. ISBN 978-0-06-088242-6.
  9. Norris, G.; Thomas, G.; Wagner, M. & Forbes Smith, C. (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 0-9752341-2-9.
  10. Irving, Clive. Wide Body: The Triumph of the 747. New York: W. Morrow, 1993. ISBN 0-688-09902-5, pp. 189–190.
  11. Garwood, Darrell. "Newest Air Force planes grounded". Archived 4 February 2016 at the Wayback Machine Times-News, 17 January 1970.
  12. Losey, Stephen (16 May 2024). "F-35s to cost $2 trillion as Pentagon plans longer use, says watchdog". Defense News. Retrieved 22 March 2025.
  13. "Turkey's Fifth-Generation Fighter Jet Kaan Makes Maiden Flight". Bloomberg.com. 21 February 2024. Retrieved 7 April 2024.
  14. "Boiling Over". The New York Times. Retrieved 22 November 2023.
  15. "Cost of Volcanic Eruptions". Volcano World. 15 April 2010. Retrieved 24 May 2022.
  16. Vidal, John (1 August 2019). "What should we do with radioactive nuclear waste?". The Guardian. ISSN 0261-3077. Archived from the original on 1 August 2019. Retrieved 2 August 2019.
  17. Dedaj, Paulina (3 July 2019). "Chernobyl's $1.7B nuclear confinement shelter revealed after taking 9 years to complete". Fox News. Archived from the original on 2 August 2019. Retrieved 2 August 2019.
  18. 1 2 3 "Oil Spills by the Numbers". Center for American Progress. 30 April 2010. Retrieved 24 May 2022.
  19. "Total unit faces stiff penalty over factory blast". Reuters. 25 June 2009. Retrieved 22 November 2023.
  20. Kweifio-Okai, Carla (25 December 2014). "Where did the Indian Ocean tsunami aid money go?". The Guardian. ISSN 0261-3077. Retrieved 22 November 2023.
  21. Schleifstein, Mark (14 January 2023). "How many people died in Hurricane Katrina? Toll reduced 17 years later". The Times-Picayune. New Orleans. Retrieved 22 November 2023.
  22. Bousso, Ron (16 January 2018). "BP Deepwater Horizon costs balloon to $65 billion". Reuters. Retrieved 22 November 2023.
  23. "2.4 trillion yen in Fukushima crisis compensation costs to be tacked onto power bills". Mainichi Daily News. 10 December 2016. Retrieved 22 November 2023.
  24. "Japan disaster set to become world's costliest - CBS News". CBS News. 23 March 2011. Retrieved 22 November 2023.
  25. "Earthquake, Tsunami, Meltdown - The Triple Disaster's Impact on Japan, Impact on the World". Brookings. Retrieved 22 November 2023.
  26. "Aviso de Pauta – Cerimônia de ampliação da capacidade da Refinaria Abreu e Lima (RNEST) com presença do presidente da República Luiz Inácio Lula da Silva". Agência (in Brazilian Portuguese). Retrieved 1 December 2025.
  27. Prudenciano, Greg (22 May 2025). "Angra 3: por que a obra da usina nuclear nunca termina?". investnews.com.br (in Brazilian Portuguese). Retrieved 1 December 2025.
  28. "Sun Cable: World's biggest solar and battery project expands again, gets Indonesia approval". RenewEconomy. 23 September 2021. Retrieved 8 October 2024.
  29. "Work on €1.6bn electricity interconnector between Ireland and France to begin 'very, very shortly'". The Irish Times.
  30. "Power plant profile: KSEB- Kerala Dam Wind Farm, India". Power Technology. 27 April 2023.
  31. "With 2,245 MW of Commissioned Solar Projects, World's Largest Solar Park is Now at Bhadl". 19 March 2020. Archived from the original on 20 March 2020. Retrieved 20 March 2020.
  32. "SECI tenders another 750MW at record-luring Bhadla Solar Park". PV Tech. 21 June 2017. Archived from the original on 1 December 2017. Retrieved 22 March 2018.
  33. "Country's Biggest Solar Park In Rajasthan, At The Heart Of India's Clean Energy Push". NDTV. Archived from the original on 12 February 2018. Retrieved 6 June 2017.
  34. BENBAN 1.8GW PV SOLAR PARK, EGYPT – STRATEGIC ENVIRONMENTAL & SOCIAL ASSESSMENT – FINAL REPORT (PDF) (Report). February 2016. Retrieved 8 October 2024.
  35. Magno, Alex R. (1998). Kasaysayan: The Story of the Filipino People Vol. 9. Asia Publishing Co. pp. 204–205. ISBN 962-258-232-X.
  36. "Philippines GDP - Gross Domestic Product 1984". countryeconomy.com. Retrieved 24 May 2022.
  37. Parameswaran, Prashanth. "Southeast Asia's Nuclear Energy Future in the Spotlight With Philippines Debate Revival". Retrieved 27 September 2020.
  38. "Philippines looking at nuclear revival to meet energy needs". The Financial Express. 23 May 2018. Retrieved 21 June 2018.
  39. Domingo, Ronnel W. (20 November 2017). "Nuke plant rehab, revival opposed". Inquirer. Retrieved 21 June 2018.
  40. Agaton, Casper Boongaling (2019). A Real Options Approach to Renewable and Nuclear Energy Investments in the Philippines. Germany: Logos Verlag Berlin GmbH. p. 54. ISBN 978-3-8325-4938-1.
  41. "World's First Carbon Capture Power Plant Switches On". Climate Central. 5 October 2014. Archived from the original on 7 October 2014. Retrieved 7 October 2014.
  42. "Kemper County: constructing the world's first IGCC with CCS" (PDF). KBR. Archived from the original (PDF) on 11 October 2014. Retrieved 7 October 2014.
  43. "Benban, Africa's largest solar park, completed". European Bank for Reconstruction and Development. Archived from the original on 27 December 2019. Retrieved 29 November 2019.
  44. "Olkiluoto 3 at full power for first time". TVO. 30 September 2022. Archived from the original on 30 September 2022. Retrieved 1 November 2022.
  45. "Regular electricity production has started at Olkiluoto 3". TVO. 18 April 2023. Retrieved 16 April 2023.
  46. "Panamá inaugura su primera planta de gas natural". tvn-2.com. 17 August 2018. Retrieved 1 November 2018.
  47. "World's Largest Solar Park at Karnataka's Pavagada is Now Fully Operational". 27 December 2019. Archived from the original on 27 December 2019. Retrieved 27 December 2019.
  48. "Karnataka's Pavagada Solar Park to be Fully Operational by December 2019". 12 April 2019. Archived from the original on 12 April 2019. Retrieved 12 April 2019.
  49. "Opinião | Custos das interferências políticas na Petrobras". Estadão (in Brazilian Portuguese). Retrieved 1 December 2025.
  50. Weaver, John Fitzgerald (29 January 2018). "10 really cool Solar Power installations in (and above) the world". Electrek. Archived from the original on 29 January 2018. Retrieved 30 January 2018.
  51. "宁夏在腾格里沙漠南缘建成全国最大沙漠光伏集成区 – 今日热点 – 中国储能网". escn.com.cn. Archived from the original on 3 May 2018. Retrieved 20 May 2017.
  52. Plumer, Brad (August 2017). "U.S. Nuclear Comeback Stalls as Two Reactors Are Abandoned". The New York Times. Archived from the original on 29 March 2020. Retrieved 1 November 2018.
  53. 刘小卓. "Premier announces construction of Yarlung Zangbo hydropower project". China Daily. Retrieved 19 July 2025.
  54. "Governments Spent at Least €93bn on COVID-19 Vaccines and Therapeutics During the Last 11 Months". BusinessWire. 11 January 2021. Retrieved 5 January 2023.
  55. "The Impact of Genomics on the U.S. Economy" (PDF). Batelle Technology Partnership Practice. June 2013. Archived (PDF) from the original on 12 October 2013. Retrieved 1 November 2014.
  56. "The price of the Manhattan Project". Restricted Data: The Nuclear Secrecy Blog. Archived from the original on 7 October 2014. Retrieved 31 October 2014.
  57. Adrian Cho (29 March 2022). "Trying to stay ahead of competition, U.S. pares down troubled $3 billion neutrino experiment". American Association for the Advancement of Science.
  58. "Facts and Figures".
  59. "ELT Timeline".
  60. "FAIR: New German particle accelerator clears first hurdle". phys.org. Archived from the original on 15 November 2016. Retrieved 13 June 2012.
  61. Webb, Jonathan (21 May 2015). "LHC smashes energy record with test collisions". Archived from the original on 8 September 2015. Retrieved 28 August 2015.
  62. Lee Billings (12 February 2016). "The future of Gravitational wave Astronomy". Scientific American. Archived from the original on 13 February 2016. Retrieved 13 February 2016.
  63. Sarkauskas, Susan (22 April 2022). "Fermilab gets the go-ahead to start building new linear accelerator anticipated worldwide". Daily Herald. Retrieved 23 April 2022.
  64. "Cassini Solstice Mission-FAQs". Jet Propulsion Laboratory. Archived from the original on 1 February 2014. Retrieved 24 January 2014.
  65. "Gaia spacecraft set for launch on mission to map a billion stars". The Guardian. Archived from the original on 15 December 2013. Retrieved 15 December 2013.
  66. "Galileo navigational system enters testing stage". Deutsche Welle. Archived from the original on 15 October 2012. Retrieved 30 January 2018.
  67. Kathy Sawyer (17 December 1991). "Galileo Antenna Apparently Still Stuck". Washington Post: A14; Kathy Sawyer (18 December 1991). "$1.4 Billion Galileo Mission Appears Crippled." Washington Post: A3 Archived 14 February 2017 at the Wayback Machine in Mission to Jupiter. p.180.
  68. Galileo: Facts & Figures Archived 12 November 2013 at the Wayback Machine. NASA.gov. Retrieved 12 November 2012.
  69. "GPS History, Chronology, and Budgets". The Global Positioning System (PDF).[full citation needed]
  70. "Herschel: Fact Sheet" (PDF). ESA.int. ESA Media Relations Office. 28 April 2010. Archived (PDF) from the original on 18 October 2012.
  71. "The Space Review: Costs of US piloted programs". The Space Review. Archived from the original on 12 July 2018. Retrieved 28 February 2015.
  72. "Technical Frequently Asked Questions (FAQ)". NASA-JWST. Archived from the original on 18 January 2014. Retrieved 24 January 2014.
  73. Dan Leone (12 August 2012). "MSL Readings Could Improve Safety for Human Mars Missions". Space News. Retrieved 24 January 2014.
  74. George Musser (May 2011). "Cosmic-Ray Detector on Space Shuttle Set to Scan Cosmos for Dark Matter". Scientific American. Archived from the original on 2 February 2014. Retrieved 24 January 2014.
  75. "Moon Worth Apollo's $170 Billion?". The Guardian Liberty Voice. 7 June 2014. Archived from the original on 31 October 2014. Retrieved 31 October 2014.
  76. "Space Shuttle Total Cost: More Than AIG Bailout, Less Than War". Fox News. 5 July 2011. Archived from the original on 24 January 2015. Retrieved 23 December 2014.
  77. Barrabi, Thomas (6 January 2020). "Las Vegas Raiders' Allegiant Stadium, by the numbers". Fox Business. Retrieved 12 January 2020.
  78. Mosley, Matt (15 September 2008). "Jones building a legacy with $1.3 billion Cowboys stadium". Retrieved 28 November 2008.
  79. Baker, Geoff (10 May 2021). "Climate Pledge Arena cost to exceed $1 billion; Oak View Group announces tech partnership with Verizon". Seattle Times. Retrieved 15 May 2021.
  80. Brumfield, Loyd (21 September 2017). "Rangers Unveil First Renderings of New Globe Life Field, Set to Break Ground Next Week". The Dallas Morning News. Retrieved 21 September 2017.
  81. Rosenberg, Mike (19 April 2012). "49ers' Kick Off Move to Santa Clara With Far-From-Traditional Groundbreaking". San Jose Mercury News. Retrieved 6 May 2012.
  82. "Narendra Modi Stadium to have 50% capacity for five-match T20I series against England: GCA". Times Now News. 12 March 2021. Retrieved 18 August 2021.
  83. Aldridge, David; Jhabvala, Nicki (7 May 2026). "How the Commanders returned to D.C.: The wild, unlikely saga of a years-long journey home". The Athletic. The New York Times. Retrieved 11 May 2026.
  84. "Best photos from the New Highmark Stadium groundbreaking ceremony". Buffalo Bills. Retrieved 24 January 2024.
  85. "New Nissan Stadium Groundbreaking". Tennessee Titans. Retrieved 7 March 2024.
  86. Brinson, Will (27 March 2018). "NFL Reportedly Raising Debt Limit on Rams Stadium after L.A. Project nears $5B Price Tag". Retrieved 27 March 2018.
  87. Garner-Putkis, Zak (5 June 2020). "Why Tottenham Hotspur's $1 Billion Stadium Will Be The Last Of Its Kind". Forbes. Retrieved 9 November 2020.
  88. "Wilfs pledge $19.5M more to stadium". ESPN. 26 March 2015. Retrieved 27 March 2015.
  89. "Cuomo, Islanders Make Belmont Official". New York Islanders. 20 December 2017. Archived from the original on 29 December 2017. Retrieved 20 December 2017.
  90. "Stadium Facts & Features". Wembley Stadium. Archived from the original on 20 November 2020. Retrieved 9 November 2020.
  91. Demause, Neil (January 2009). "Private/Public Cost Breakdowns for New Yankees/Mets Stadiums" (PDF). Field of Schemes. Retrieved 26 July 2020.
  92. "Ethiopia Seeks $10bn in Private Capital for Expressway Projects". Birr Metrics. Retrieved 24 April 2026.
  93. "Ethiopia Seeks $10bn in Private Capital for Expressway Projects". Birr Metrics. Retrieved 24 April 2026.
  94. "Ethiopia Seeks $10bn in Private Capital for Expressway Projects". Birr Metrics. Retrieved 24 April 2026.
  95. "Ethiopia begins $12.5 billion construction of 'Africa's biggest airport'". Reuters. Retrieved 11 February 2026.
  96. Abraham Achirga (18 July 2018). "Light rail line in Nigeria's capital opens to passengers". Reuters. Archived from the original on 9 July 2019. Retrieved 9 July 2019.
  97. "Abuja Light Rail 84 per cent complete – Official". Premium Times. 18 January 2017. Archived from the original on 2 February 2017. Retrieved 14 April 2017.
  98. "China Exim Bank to bankroll $1.79bn Abuja light rail". The Sun. Lagos, Nigeria. Archived from the original on 26 March 2017. Retrieved 14 April 2017.
  99. "Lagos sign deal for construction of 38km-long fourth mainland bridge". The Nerve Africa. 25 May 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
  100. "Lagos-Calabar railway project: FG, CCECC sign $11.12bn MoU". Vanguard. Lagos, Nigeria. Vanguard. 1 July 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
  101. Israel, Olumide (2 March 2014). "Railway: The return of the economic live wire!". Vanguard. Lagos, Nigeria. Vanguard. Archived from the original on 2 July 2017. Retrieved 14 April 2017.
  102. "Lagos Rail Mass Transit". Lagos Metropolitan Area Transport Authority. 2015. Archived from the original on 1 December 2016. Retrieved 23 September 2015.
  103. "Lagos light rail to commence operation 2022 – Official". Premium Times. 12 August 2018. Archived from the original on 4 July 2019. Retrieved 9 July 2019.
  104. "Bharat Mala: PM Narendra Modi's planned 14,000 crore (US$1.5 billion) road from Gujarat to Mizoram", The Economic Times, New Delhi, 29 April 2015, archived from the original on 17 September 2016, retrieved 11 July 2020
  105. "::: Welcome to Delhi Mumbai Industrial Corridor :::". Delhi Mumbai Industrial Corridor. Archived from the original on 19 March 2016. Retrieved 5 July 2017.
  106. "THE CONSTITUTION (AMENDMENT)". indiacode.nic.in. Archived from the original on 21 August 2016. Retrieved 5 July 2017.
  107. "Make in India: Delhi-Mumbai Industrial Corridor to invite first anchor investors in August", The Economic Times, 16 February 2016, archived from the original on 27 March 2019, retrieved 11 July 2020
  108. "PM Modi inaugurates Hyderabad Metro Rail". The Times of India. 28 November 2017. Archived from the original on 28 November 2017. Retrieved 9 July 2019.
  109. "Metro rail line to Raidurg another two years away". The Hindu. 8 December 2017.
  110. Narendra Shah (17 April 2019). "Hyderabad Metro to Complete JBS-MGBS Metro Corridor by Nov 2019". Metro Rail News. Archived from the original on 17 April 2019. Retrieved 9 July 2019.
  111. "India's hyperloop plans were all talk—until now". Quartz India. 2 September 2016. Archived from the original on 22 June 2020. Retrieved 11 July 2020.
  112. technology, BENGALURU (7 December 2016). "India in talks to build Hyperloop; two Indian companies involved in the project". ET online. Archived from the original on 6 December 2016. Retrieved 7 December 2016.
  113. "DGWHyperloop – Overview" (PDF). 29 October 2016. Archived from the original (PDF) on 4 November 2016. Retrieved 14 January 2017.
  114. "JICA presents draft report on bullet train project to joint committee". The Economic Times. Archived from the original on 27 August 2016. Retrieved 11 July 2020.
  115. Aneesh Phadnis (8 June 2019). "L&T; set to construct Navi Mumbai airport, likely to finish by mid-2020". Business Standard. Archived from the original on 7 August 2019. Retrieved 9 July 2019.
  116. Pankaj Shah (17 December 2020). "Yogi Adityanath: Uttar Pradesh CM approves name, design and logo of Jewar airport | Noida News - Times of India". The Times of India. Retrieved 13 August 2021.
  117. "Noida: Construction work begins at international airport site in Jewar". Hindustan Times. 23 August 2021. Retrieved 18 September 2021.
  118. "Vision Ministry of Shipping, GOI, Government of India". SagarMala. 8 June 2018. Archived from the original on 17 October 2018. Retrieved 1 November 2018.
  119. "SagarMala – Concept & Objectives Ministry of Shipping, GOI, Government of India". sagarmala.gov.in. Archived from the original on 25 September 2018. Retrieved 1 November 2018.
  120. Media, Kompas Cyber (9 June 2021). "Ini Target Jadwal Uji Coba dan Operasional LRT Jabodebek". KOMPAS.com (in Indonesian). Retrieved 26 August 2021.
  121. بازدید اعضای محترم کمیسیون عمران مجلس شورای انقلاب اسلامی از منطقه یک آزادراه تهران [Distinguished members of the Civil Commission of the Islamic Revolutionary Assembly visit District One of Tehran Freeway] (in Persian). Archived from the original on 13 December 2018.
  122. Unknown (2019). "Kuwait International Airport Passenger Terminal 2". GC Kuwait. Gulf Consults. Archived from the original on 24 July 2019. Retrieved 24 July 2019.
  123. "Economic corridor: Chinese official sets record straight". The Express Tribune. 2 March 2015. Archived from the original on 3 March 2015. Retrieved 8 August 2015.
  124. Flora, Ian Ocampo (6 February 2020). "P175-B mega bridge project to connect CL, Southern Tagalog". Sun Star Pampanga. Archived from the original on 28 June 2020. Retrieved 25 June 2020.
  125. "About Us – MRT3 Stations". Metro Rail Transit. Archived from the original on 22 January 2013. Retrieved 8 June 2014.
  126. "Major infrastructure projects lined up". BusinessWorld. Archived from the original on 23 September 2015. Retrieved 6 July 2015.
  127. Esguerra, Darryl John. "Construction of Makati City subway system to start in December". Archived from the original on 19 September 2018. Retrieved 19 September 2018.
  128. "Malaysian firm waits NEDA's nod for P60-B MRT-9 project". ptvnews.ph. 21 March 2018. Archived from the original on 10 July 2018. Retrieved 10 July 2018.
  129. Tycoons unsolicited PPP projects bolster "Build, Build, Build". Archived 22 December 2019 at the Wayback Machine Inquirer.net. Retrieved 22 December 2019.
  130. "Metro Manila to kick off construction of P350-B subway in January". The Inquirer. 27 December 2018. Archived from the original on 27 December 2018. Retrieved 28 December 2018.
  131. "Mindanao Railway project specs altered". BusinessWorld Online. 16 July 2019. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  132. "San Miguel, DOTr sign deal to build new Bulacan airport". ABS-CBN News. 18 September 2019. Archived from the original on 20 September 2019. Retrieved 18 September 2019.
  133. Camus, Miguel R. "DOTr plans to integrate new railway lines". The Inquirer. Archived from the original on 16 February 2019. Retrieved 16 February 2019.
  134. "DOF seals loan from China for PNR South Long Haul Project". Manila Bulletin Business. Archived from the original on 14 January 2020. Retrieved 14 January 2020.
  135. "Qatar Expressway Program: One of the World's Largest Road and Infrastructure Projects" (PDF). KBR. Archived (PDF) from the original on 20 August 2018. Retrieved 20 August 2018.
  136. "Riyadh Metro project more than 90% completed". Zawya.
  137. "Singapore's first undersea road - Marina Coastal Expressway - set to open on Dec 29". Straitstimes. Retrieved 13 November 2013.
  138. "Incheon International Airport (ICA/RKSI)". airport-technology.com. AirportTechnology. 25 July 2019. Archived from the original on 25 May 2019. Retrieved 24 July 2019.
  139. Unknown (2019). "Incheon starts 4th-stage expansion project for new runway". The Korea Times. Archived from the original on 24 July 2019. Retrieved 24 July 2019.
  140. "Al Maktoum International Airport". Zawya.com. Archived from the original on 6 March 2012. Retrieved 30 March 2013.
  141. "Inforegio - Commission approves EU financing of the Pelješac bridge in Croatia". ec.europa.eu. Retrieved 11 August 2023.
  142. "European mega-project collaboration deal". TunnelTalk. 11 October 2016. Archived from the original on 9 August 2017. Retrieved 9 August 2017.
  143. Herr, Roland (29 June 2016). "Megaprojects in Europe – Crossing Borders, Connecting Markets". Tunneling Online. Tunnel Business News. Archived from the original on 9 August 2017. Retrieved 9 August 2017.
  144. "Tendering". Attiko Metro. Archived from the original on 20 August 2018. Retrieved 20 August 2018.
  145. "Funding". Attiko Metro. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  146. "Transit in Athens". Attiko Metro. Archived from the original on 19 June 2018. Retrieved 18 August 2018.
  147. Egnatia Odos. "The Construction of the Egnatia Motorway". egnatia.eu. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  148. "Egnatia Railway". ec.europa.eu. Archived from the original on 15 January 2019. Retrieved 25 February 2019.
  149. "Greece Infrastructure". Foreign Policy. Archived from the original on 25 February 2019. Retrieved 25 February 2019.
  150. Nea Odos. "Financing the Project". neaodos.gr. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  151. "Χρηματοδότηση – ΑΤΤΙΚΟ ΜΕΤΡΟ Α.Ε." [Funding – Attiko Metro] (in Greek). Attiko Metro. 3 August 2019. Archived from the original on 3 August 2019. Retrieved 17 August 2019.
  152. "Στα 1,25δισ.ευρώ το κόστος της νέας σιδηροδρομικής γραμμής Θεσσαλονίκη-Καβάλα-Ξάνθη" (in Greek). Archived from the original on 24 June 2019. Retrieved 24 June 2019.
  153. "Αθήνα – Θεσσαλονίκη σε λιγότερο από 3,5 ώρες, Της Αλεξάνδρας Κασσίμη". kathimerini.gr. 29 January 2019. Archived from the original on 30 January 2019. Retrieved 31 January 2019.
  154. ErgOSE. "TITHOREA – DOMOKOS". ergpse.gr. Archived from the original on 5 July 2018. Retrieved 18 August 2018.
  155. "Déjà Vu? Italy Plans To Build World's Longest Suspension Bridge To Sicily". IFLScience. 16 February 2024. Retrieved 18 February 2024.
  156. "RESOLUTION NO 173/2017 OF THE COUNCIL OF MINISTERS of 7 November 2017 on the adoption of the Investment Preparation and Implementation Concept: Solidarity Airport – Central Transport Hub for the Republic of Poland" (PDF). Archived (PDF) from the original on 8 July 2019. Retrieved 8 July 2019.
  157. "€10.5bn for rail in Portuguese 10-year investment plan". International Railway Journal. 20 November 2020. Retrieved 5 January 2021.
  158. Navigable Danube-Thessaloniki river link a project of 'huge significance', Tsipras and Vucic agree
  159. "Drugi tir po novem investicijskem programu vreden manj kot milijardo evrov". RTVSLO.si (in Slovenian). Retrieved 17 July 2021.
  160. "Za razvoj Slovenije | Drugi tir". drugitir.si. Retrieved 17 July 2021.
  161. "Expansion | Heathrow". Heathrow Airport. Retrieved 9 February 2025.
  162. Moore, Catherine (7 June 2021). "Irish Sea Link | Proposal for bridge and tunnel crossing via two man-made islands". New Civil Engineer. Retrieved 9 February 2025.
  163. "Homepage Discover HS2". HS2. Retrieved 9 February 2025.
  164. Topham, Gwyn (24 April 2023). "Elizabeth line to be fully running from 21 May in 'last milestone' for Crossrail". The Guardian. ISSN 0261-3077. Retrieved 17 June 2023.
  165. "M8 | Roads.org.uk". roads.org.uk. 20 November 1964. Retrieved 7 May 2025.
  166. "Northern Powerhouse Rail". Transport for the North. Retrieved 9 February 2025.
  167. "Cambridge to Oxford road 'may cost £3.5bn'". BBC News. 30 November 2016. Retrieved 23 September 2024.
  168. "Crossrail 2 - Supporting Growth in the South East". Crossrail 2. Retrieved 8 February 2025.
  169. Williams, Nia (2 May 2024). "Canada's long-delayed Trans Mountain oil pipeline starts operations". Reuters.
  170. 1 2 3 "Top 100: Canada's Biggest Infrastructure Projects for 2017". top100projects.ca. TOP100 Projects. Archived from the original on 1 September 2017. Retrieved 31 August 2017.
  171. Kate Porter (18 June 2019). "RTG promises to hand over LRT to city in August". CBC News. Archived from the original on 26 June 2019. Retrieved 9 July 2019.
  172. "Home - Broadway Subway Project".
  173. Tomesco, Frédéric (20 May 2022). "Opening of REM's airport section delayed until at least 2025". Montreal Gazette. Retrieved 24 May 2022.
  174. "Línea 2 del Metro iniciará operaciones a partir del 15 de enero". La Estrella. 3 June 2018. Archived from the original on 30 July 2018. Retrieved 1 November 2018.
  175. "Lo Bueno Avanza Metro de Panamá a 4 años de gestión del Presidente Varela". El Metro de Panama. 12 July 2018. Archived from the original on 17 October 2018. Retrieved 1 November 2018.
  176. "CREATE". nscorp.com. Archived from the original on 6 February 2018. Retrieved 5 February 2018.
  177. "HRBT Expansion Project". Virginia Department of Transportation. Retrieved 25 January 2024.
  178. "JFK Airport Construction & Modernization: New Terminals".
  179. "Terminal Redevelopment". LaGuardia. Retrieved 31 December 2025.
  180. "Follow the 14 Billion Dollar Modernization Project at LAX".
  181. "Newark Liberty Airport: Modern Terminal A & Future Projects".
  182. "Crescent Freight Corridor, United States of America". railway-technology.com. Archived from the original on 8 August 2017. Retrieved 8 August 2017.
  183. "Norfolk Southern Completes Va. Crescent Corridor Improvements". Transport Topics. 23 August 2010. Retrieved 3 May 2024.
  184. "Crescent Freight Corridor". Railway Technology. Retrieved 3 May 2024.
  185. Schwartz, A. C. (September 2004). "Fixing O'Hare: Plan for a New Airfield Will Eliminate Delays Caused by Intersecting Runways – If It Can Get Past the Local Opposition". ATW: Air Transport World. 41 (10). ISSN 0002-2543.
  186. "UPDATE 1-FAA commits $410 mln to finish Chicago O'Hare plan". Reuters. 6 April 2010. Retrieved 24 May 2022.
  187. "Estimated cost of constructing Ohio River Bridges reduced in updated financial report to Federal Highway Administration". kyinbridges.com. 24 January 2014. Archived from the original on 29 July 2017. Retrieved 29 July 2017.
  188. "Initial Investment". Project Connect. CapMetro. Archived from the original on 27 January 2021. Retrieved 19 January 2021.
  189. "Project Connect Program Sequence". Project Connect. CapMetro. Retrieved 19 January 2021.
  190. "Puget Sound Gateway Program". Washington State Department of Transportation. Retrieved 28 October 2022.
  191. "Project Journey is Transforming the Passenger Experience at Reagan National". Reagan National Airport. Retrieved 4 January 2026.
  192. "SFO Opens Final Phase of Harvey Milk Terminal 1". San Francisco International Airport. 17 June 2024. Retrieved 4 January 2026.
  193. "San Francisco-Oakland Bay Bridge". Metropolitan Transportation Commission. 17 March 2021. Retrieved 4 January 2026.
  194. "Second Avenue Subway Phase 2". Metropolitan Transportation Authority. Retrieved 3 January 2026.
  195. "WMATA | Overview". WMATA. Archived from the original on 12 August 2025. Retrieved 4 January 2026.
  196. "Sound Transit 3". Sound Transit. Retrieved 4 January 2026.
  197. "UrbanRail.Net > South America > Brazil > São Paulo Metro". urbanrail.net. Retrieved 12 September 2021.
  198. de Vasconcelos, Augusto Carlos; Marchesini, Gilson L.; Timerman, Júlio (2014). "4.4 Steel Box Bridges". In Chen, Wai-Fah; Duan, Lian (eds.). Handbook of International Bridge Engineering. Boca Raton, Florida: CRC Press. pp. 184–186. ISBN 978-1-4398-1029-3. Retrieved 26 July 2015.
  199. Netto, João Pedro (30 October 2018). "Transamazônica: faraônico atoleiro". Aventuras na História (in Brazilian Portuguese). Retrieved 30 November 2025.
  200. Dorgival Ferreira Pereira (2004). "A Importância Da Logística De Transportes Da Cvrd Para O Comércio Internacional No Estado Maranhão" (PDF).
  201. "Nos trilhos do progresso". Diário da Manhã. 20 May 2016. Retrieved 21 February 2024.
  202. "Lula visita obra da Transnordestina, atrasada em 14 anos e com triplo do custo previsto inicialmente". G1 (in Brazilian Portuguese). 5 April 2024. Retrieved 30 November 2025.
  203. iNFRA, Agência (16 October 2025). "Ministério dos Transportes quer conceder Corredor Leste-Oeste com Fiol 1". Agência iNFRA (in Brazilian Portuguese). Retrieved 30 November 2025.
  204. "Sydney Central Station Airspace Redevelopment, NSW". Webb Australia. Archived from the original on 28 February 2014. Retrieved 24 February 2014.
  205. "Cross River Rail". Queensland Government. Archived from the original on 1 October 2017. Retrieved 29 September 2017.
  206. "OneSKY Project". Airservices. Archived from the original on 30 April 2018. Retrieved 30 April 2018.
  207. "Suburban Rail loop". Victorian Government. Archived from the original on 7 March 2019. Retrieved 5 March 2019.
  208. "Work on Sydney Harbour tunnels to start". 25 June 2017. Archived from the original on 25 June 2017. Retrieved 3 March 2019.
  209. O'Sullivan, Matt (7 February 2021). "Warning that Metro West risks costing $27b and opening late". The Sydney Morning Herald. Retrieved 29 September 2023.
  210. Abdel bary, Hossam (26 September 2015). "Eastown & Westown Egypt". slideshare.net. Solidere. Retrieved 2 November 2017.
  211. Unknown (2019). "Galala City". sitesint.com. Sites International. Retrieved 24 July 2020.
  212. "Get To Know Abuja". Abuja City. Archived from the original on 23 September 2015. Retrieved 27 September 2015.
  213. "Asokoro Island: Abuja's new, exclusive destination for luxury living". Market Watch. 30 September 2014. Archived from the original on 14 May 2016. Retrieved 29 April 2016.
  214. "Asokoro Island". asokoroisland.com. Archived from the original on 9 August 2017. Retrieved 8 August 2017.
  215. "FG urges Nigerians in Diaspora to invest in Centenary City". Vanguard. Lagos, Nigeria. 26 July 2013. Archived from the original on 1 October 2013. Retrieved 8 October 2013.
  216. "Centenary City Abuja – What to Expect". Estate Intel. 18 August 2014. Archived from the original on 19 September 2014. Retrieved 22 February 2012.
  217. Njoku, Jude (16 September 2014). "FG, developer sign deal on Festac Phase 2". Vanguard. Lagos, Nigeria. Retrieved 23 December 2015.
  218. "Nigeria: Development Plan Dismisses Threats to Lekki/Victoria Island's Real Estate Prospects". allafrica.com. 6 July 2015. Archived from the original on 22 December 2015. Retrieved 15 December 2015.
  219. Ricardo Reboredo (6 March 2019). "What a failed futuristic smart-city in Modderfontein tells us about African mega-cities". The Citizen. Zambia. Archived from the original on 16 May 2019. Retrieved 16 May 2019.
  220. "Shanghai Zendai Plans $7.8 Billion 'New York of Africa'". Bloomberg. 6 November 2013. Archived from the original on 6 March 2016. Retrieved 13 January 2016.
  221. "Work begins on South Africa's R84bn smart city". Brand South Africa. Archived from the original on 2 January 2016. Retrieved 13 January 2016.
  222. "World's Fastest Growing Cities are in Asia and Africa". Euromonitor. 2 March 2010. Archived from the original on 17 November 2015. Retrieved 26 October 2015.
  223. "10 infrastructure projects India can be proud of". ArabianIndustry.com. Archived from the original on 6 September 2014. Retrieved 6 September 2014.
  224. "Concept – GIFT Gujarat, Gujarat International Tec City, Gujarat International Finance Tec-City (GIFT)". giftgujarat.in.
  225. Appraisal of City Development Plan – Navi Mumbai Archived 15 September 2012 at the Wayback Machine. National Institute of Urban Affairs, 2008.
  226. Faris Mokhtar; Rieka Rahadiana (2 August 2022). "Indonesia Breaks Ground on Nusantara as Jakarta Sinks". Bloomberg.
  227. "Iran Mall". Archived from the original on 31 May 2020. Retrieved 17 July 2020.
  228. "در مورد ایران مال در ویکی تابناک بیشتر بخوانید". tabnak.ir. Retrieved 9 April 2024.
  229. "Jordan's $5 billion Abdali project: serious investment potential". Archived from the original on 23 September 2015. Retrieved 21 August 2015.
  230. "Shiny new downtown launched in Amman". Archived from the original on 29 May 2019. Retrieved 21 August 2015.
  231. Ragananthini, V. (18 July 2017). "Ekovest lines up RM16.5b worth of projects within KL River City". The Sun Daily. Archived from the original on 16 August 2017. Retrieved 15 August 2017.
  232. toot. "About Bahria Town Karachi – Bahria Town – Your Lifestyle Destination". bahriatown.com. Archived from the original on 11 May 2017. Retrieved 12 May 2017.
  233. "Sustainable Transportation in DHA City Karachi (DCK) – All You Need To Know!". DHA Today. 14 April 2014. Archived from the original on 9 September 2015. Retrieved 8 October 2015.
  234. "Pakistan Defence Officers Housing Authority, Karachi". DHA Karachi. Archived from the original on 7 September 2015. Retrieved 11 September 2015.
  235. "Capital Development Authority". Archived from the original on 12 May 2016.
  236. "Launch of LDA City delayed". Dawn. 9 January 2015. Archived from the original on 28 September 2015. Retrieved 27 September 2015.
  237. rasheed (22 September 2013). "$10 Billion Ravi River Front Project Launched". PKPolitics Discuss. Archived from the original on 25 June 2014. Retrieved 8 October 2015.
  238. "Home". Oman Tribune. Archived from the original on 18 August 2014. Retrieved 8 October 2015.
  239. Noor Aftab (20 January 2014). "New city project in Lahore suburbs on the anvil". The News International. Archived from the original on 5 August 2014. Retrieved 8 October 2015.
  240. 1 2 "China approves construction of mega-dam in Tibet". Radio Free Asia. 27 December 2024. Retrieved 27 December 2024.
  241. Cite error: The named reference chicagotribuneaugust2 was invoked but never defined (see the help page).
  242. Zareva, Teodora (1 November 2017). "Saudi Arabia Is Building a $500-Billion New Territory Based on Tech and Liberal Values". bigthink. Archived from the original on 1 November 2017. Retrieved 2 November 2017.
  243. "Welcome to Neom, Saudi Arabia's city of the future". Arabian Business. 26 October 2017. Archived from the original on 29 October 2017. Retrieved 2 November 2017.
  244. "Sejong City to open Sunday". The Korea Herald. 28 June 2012. Retrieved 24 June 2016.
  245. "Colombo Port City: White Elephant? Affront to human rights? – Sri Lanka Campaign for Peace and Justice". Sri Lanka Campaign for Peace and Justice. 3 July 2015. Archived from the original on 26 September 2015. Retrieved 30 October 2015.
  246. Lambert, Fred (19 October 2017). "Europe's Nortvolt battery gigafactory lands in Sweden". Electrek. Archived from the original on 13 December 2017. Retrieved 12 December 2017.
  247. "New Slussen Masterplan". Foster + Partners. Archived from the original on 16 September 2019. Retrieved 25 November 2019.
  248. Nikel, David. "Kiruna: A Mining Town On The Move In Northern Sweden". Forbes. Retrieved 22 August 2023.
  249. Orkan, Semra (17 April 2023). "Bakan Kurum: İstanbul Finans Merkezi bölgede bir cazibe merkezi olacak". Anadolu Agency. Retrieved 7 April 2024.
  250. "kentsel_donusumun_maliyeti_ne_kadar_ konut insaat 1543567 html Haberleri ve kentsel_donusumun_maliyeti_ne_kadar_ konut insaat 1543567 html Geli艧meleri – Milliyet". milliyet.com.tr. Archived from the original on 29 October 2013. Retrieved 4 October 2013.
  251. "Kentsel Dönüşümün Maliyeti Ne Kadar?". eypyapi.com. Archived from the original on 8 February 2015. Retrieved 4 October 2013.
  252. "Kentsel dönüşüm için 400 proje". ekonomi.haberturk.com. 18 May 2012. Archived from the original on 5 October 2013. Retrieved 4 October 2013.
  253. ABDULKADİR CEMBEKLİ (7 September 2013). "Fikirtepe'de 40 milyar liralık kentsel dönüşüm başlıyor". Zaman. Archived from the original on 5 October 2013.
  254. "T.C. ÇEVRE ve ŞEHİRCİLİK BAKANLIĞI – Altyapı ve Kentsel Dönüşüm Hizmetleri Genel Müdürlüğü". csb.gov.tr. Archived from the original on 31 August 2012. Retrieved 4 October 2013.
  255. "Pandemic accelerates $5B Oakridge Centre overhaul". Alaska Highway News. Retrieved 5 October 2021.
  256. "53 West 53rd". The Skyscraper Center. Archived from the original on 9 July 2019. Retrieved 9 July 2019.
  257. "City Living: Battery Park City". Archived from the original on 27 December 2014. Retrieved 1 March 2017.
  258. 1 2 Grzelewski, Jordyn; Beggin, Riley (27 September 2021). "Ford, partner to spend $11.4B on four new plants in Tennessee, Kentucky to support EVs". The Detroit News. Retrieved 27 September 2021.
  259. "Brickell Key on Claughton Island". 14 January 2013. Archived from the original on 2 March 2017. Retrieved 1 March 2017.
  260. Feser, Katherine (6 May 2014). "FMC Technologies breaks ground on corporate campus". Houston Chronicle. Retrieved 29 July 2020.
  261. "City officials: No plans to pursue proposed Middletown development, Hollywoodland". MSN.
  262. "Top 10 Biggest Upcoming United States Mega Projects in 2024 - Infra Info Hub". 3 June 2024. Retrieved 5 June 2024.
  263. Rodkin, Dennis (17 October 2019). "What's That Building? A Towering New Addition To Chicago's Skyline". WBEZ Chicago. Retrieved 28 October 2021.
  264. "America Rebuilds: A Year at Ground Zero". PBS. Archived from the original on 5 August 2017. Retrieved 3 September 2017.
  265. "Queen's Wharf Brisbane". Destination Brisbane Consortium. Archived from the original on 25 February 2018. Retrieved 29 September 2017.
  266. "Waterfront Brisbane". Dexus.
  267. "Brasília in the World". Archived from the original on 15 July 2014.
  268. Reporter, Contributing (13 January 2010). "Brasília, 50 Years as the Capital". Archived from the original on 24 February 2017.
  269. "Ethiopia Begins Generating Power from 1.87-GW Gibe III Hydro Plant". POWER. Retrieved 11 February 2026.
  270. "Koysha Hydropower Project Advances to 70% Completion". Birr Metrics. Retrieved 11 February 2026.
  271. "timeline". badagry-port.com. Archived from the original on 12 February 2018. Retrieved 14 April 2017.
  272. "Ambode Revs up $2.3bn Badagry Deep Sea Port Project". This Day. 8 October 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
  273. "Badagry seaport to generate $53bn over 45-year concession period – Sanwo-Olu". International Centre for Investigative Journalism. 16 October 2022. Retrieved 7 November 2023.
  274. Ebosele, Moses (20 May 2015). "Contractor pledges to deliver $1.65b Lekki deep seaport in 41 months". The Guardian. Lagos, Nigeria. Archived from the original on 16 May 2017. Retrieved 10 August 2017.
  275. "Lekki Port". Archived from the original on 11 March 2019. Retrieved 17 July 2020.
  276. "Power plant profile: Medog Project, China". Power Technology. 29 August 2023. Retrieved 28 December 2024.
  277. Chang, Gordon G. (8 January 2014). "China's Water Crisis Made Worse by Policy Failures". World Affairs. Archived from the original on 23 July 2019. Retrieved 23 November 2018.
  278. "China's Largest Water Diversion Project under Construction Makes Key Progress". en.sasac.gov.cn. Retrieved 26 March 2022.
  279. "Sagarmala Programme". pib.nic.in. Retrieved 25 April 2017.
  280. "Federal govt revises up cost of Dasu hydropower project". The Express Tribune. 6 May 2019. Retrieved 27 March 2022.
  281. "Opinion: Pakistan's Diamer Bhasha dam is neither green nor cheap". The Third Pole. 5 November 2021. Retrieved 27 March 2022.
  282. "World Bank to finance USD 14 bln in Pakistani Dam - Economics - 21/08/2013". KUNA. Retrieved 27 March 2022.
  283. "Mohmand Dam to be constructed at a cost of Rs291bn". Profit by Pakistan Today. 14 July 2019. Retrieved 27 March 2022.
  284. Gunaydin, Hatice Cagla (26 June 2019). "Turkey's Istanbul canal project explained". Retrieved 7 April 2024.
  285. Macguire, Eoghan (20 November 2013). "Cuba libre: Could port herald new economic age for communist island?". CNN. Archived from the original on 14 August 2017. Retrieved 14 August 2017.
  286. McDonald, Michael D (17 March 2016). "China Slowdown Not Holding Back Nicaragua Canal, Contractor Says". BloombergBusiness. Archived from the original on 22 March 2016. Retrieved 21 March 2016.
  287. Simon, Richard (15 August 1991), "Pipeline Plan Seen as a Pipe Dream : Water: An undersea conduit from Alaska to California would be too costly, too environmentally damaging and too 'far-out,' a congressional workshop is told.", The Los Angeles Times
  288. "Port of Rio de Janeiro". World Port Source. Retrieved 4 February 2022.
  289. "Number of employees | ITAIPU BINACIONAL". Archived from the original on 17 February 2017. Retrieved 16 February 2017.
  290. Ficher, Alisson (12 October 2025). "Maior lago artificial do Brasil tem 4.214 km², mais de 320 km de extensão, gera energia e ainda segue vital após quase 50 anos de operação". CPG Click Petróleo e Gás (in Brazilian Portuguese). Retrieved 30 November 2025.
  291. "Performance Assessment of the Tucurí Hydropower Complex, Brazil" (PDF). International Water Management Seminar 2006/07. ETH - Swiss. Retrieved 18 July 2010.[permanent dead link]
  292. "Águas da transposição do São Francisco chegam ao RN sem interrupção, diz governo". G1 (in Brazilian Portuguese). 14 August 2025. Retrieved 30 November 2025.
  293. "The Belo Monte Hydroelectric Dam complex in Brazil". RGS. Retrieved 24 November 2025.
  294. Geschwindt, Sion (28 November 2022). "BIM for FM: Lessons from Ireland's 'digital hospital' megaproject".
  295. Donnelly, Laura. "Fears Children's Hospital Could Cost €2.2billion". 98FM.
  296. "Fears target dates for construction and opening of new children's hospital will be missed". The Irish Times.
  297. "NYU Langone prepares to open new high-rise hospital". FierceHealthcare. 5 June 2018.
  298. "NYU Langone Opens State-of-the-Art Hospital Pavilion". NYU Langone Health. 4 June 2018.
  299. "Casa Poporului – de trei ori în Cartea Recordurilor". Gândul. 4 April 2008. Archived from the original on 27 July 2018.
[edit]