Setagawa Riverの部分一致の例文一覧と使い方
該当件数 : 3件
In an attempt to prevent such floods, various measures have been implemented since the Meiji period such as building Setagawa-araizeki Barrage, the drainage of Oguraike Lake and its isolation from the Uji-gawa River, and the Shin-Yodogawa-kaisaku (new project of cutting the river wider). 例文帳に追加
この為明治以降瀬田川洗堰建設や巨椋池の宇治川からの離断・干拓、新淀川開鑿等様々な対策を講じていた。 - Wikipedia日英京都関連文書対訳コーパス
For the main stream of the Yodogawa-River, it worked out a plan to build Amagase Dam in addition to dredging the Seta-gawa River, and strengthening dikes such as repairing Setagawa-araizeki Barrage. 例文帳に追加
淀川本川においては瀬田川浚渫・瀬田川洗堰改築を始め堤防強化に加え、天ヶ瀬ダムを建設する計画を立てた。 - Wikipedia日英京都関連文書対訳コーパス
Based on this plan, the Setagawa-araizeki Barrage was upgraded, and Amagase Dam over the Yodo-gawa River, Takayama Dam (initially Tsukigase Dam) over the Nabari-gawa River, and Muro Dam (initially Udagawa Dam) over the Uda-gawa River were built. 例文帳に追加
この計画に基づいて瀬田川洗堰改築・天ヶ瀬ダム(淀川)、高山ダム(計画当時は月ヶ瀬ダム)(名張川)、室生ダム(計画当時は宇陀川ダム)(宇陀川)が計画・建設された。 - Wikipedia日英京都関連文書対訳コーパス