Jump to content

Tai Seng Facility Building

From Wikipedia, the free encyclopedia
Tai Seng Facility Building
Map
Interactive map of Tai Seng Facility Building
Location
Location101 Bartley Road East, Singapore 533951
Coordinates1°20′32.15″N 103°53′43.26″E / 1.3422639°N 103.8953500°E / 1.3422639; 103.8953500
Characteristics
OperatorSBS Transit DTL Pte Ltd (ComfortDelGro Corporation)
Depot codeTSFB
RoadsBartley Road East
Rolling stockBombardier Movia C951
Routes served DTL  Downtown Line
History
Opened21 October 2017; 9 years ago (2017-10-21)

Tai Seng Facility Building, abbreviated as TSFB or Tai Seng, is an underground train depot for the Mass Rapid Transit system in Singapore. The depot is constructed towards the east of Kim Chuan Depot and will provide maintenance, stabling and operational facilities for the Downtown Line. It is located in Hougang along Bartley Road East.[1] It is accessible via a surface building located along Bartley Road East.

The depot is approximately 52 metres wide, 295 metres long and 20 metres deep. It is connected to Kim Chuan Depot and has underground access for trains to run between both facilities, allowing Downtown Line trains to be stabled in the Tai Seng Facility Building, and able to access its remote tracks. It is used in tandem with Kim Chuan Depot for the operations of the Downtown Line.

The depot is used at full capacity for the housing and maintenance of trains. This includes a direct connection between the line directly to the facility between Ubi station and Bedok North station via two reception tracks: 1 track Bukit Panjang-bound towards Ubi station and 1 track Expo-bound towards Bedok North station.[2][3]

References

[edit]
  1. ↑ "Tai Seng Facility Building". cgnarchitects. Archived from the original on 9 March 2017. Retrieved 8 February 2017.
  2. ↑ "Internship_report". SlideShare. 7 November 2015. Archived from the original on 5 March 2017. Retrieved 8 February 2017.
  3. ↑ "Technical Issues and Discussions for Tunnel Mining by Earth Pressure Balance Machine, Singapore MRT C929A" (PDF). nishimatsu jp. Archived (PDF) from the original on 5 March 2017. Retrieved 8 February 2017.