HWD (Hulianwang Weixing Digui, Xingwang Digui) (Type 1)

Guowang is a Chinese low-Earth orbit satellite internet megaconstellation developed by the China Aerospace Science and Industry Corporation (CASIC) with support from the Chinese Academy of Space Technology (CAST). It is operated by the state-owned China Satellite Network Group and planned to comprise more than 13,000 satellites. Individual spacecraft are known as Hulianwang Weixing Digui (HWD) or Xingwang Digui.

The mission aims to establish an independent satellite-based broadband network for China. Initial deployment focuses on domestic coverage, with licensing processes underway. Global services are planned as the constellation grows and its coverage density increases. The system is intended to supply connectivity to remote and underserved regions and support future integrated space-based and terrestrial communication infrastructures.

Guowang was initiated in 2022 as China’s counterpart to other large-scale satellite internet networks. The operator plans to orbit about 400 satellites by 2027. During the 2030s, the full system of more than 13,000 satellites is targeted to provide continuous worldwide coverage. The constellation architecture includes multiple orbital shells designed to offer high capacity, low latency, and redundancy.

Manufacturing responsibilities are distributed among three known producers: CAST, SECM/IAMCAS, and Yinhe (Galaxy Space). All three supply satellites for the constellation. Public sources do not provide details on how their respective designs differ. The spacecraft are based on standardized small-satellite platforms optimized for high-volume production and frequent batch launches.

The constellation foresees about 6,000 satellites in low Earth orbits between 500 and 600 km and approximately 7,000 in higher orbits near 1,145 km. Satellites launched so far have been placed either into the 1,145-km shell or into intermediate orbits around 900 km. Common payload elements include phased-array antennas, inter-satellite links, and electric propulsion systems for station-keeping.

Technical parameters such as spacecraft mass, power capability, and platform dimensions have not been published. The satellites are believed to fall within the small- to medium-class range suitable for dense orbital deployment and standardized production workflows.

Nation: China
Type / Application: Communication
Operator: China Satnet
Contractors: CAST
Equipment:
Configuration:
Propulsion:
Power: Solar array, batteries
Lifetime:
Mass:
Orbit:
Satellite COSPAR Date LS Launch Vehicle Remarks
HWD L01-01 (Hulianwang 1) 2024-240A 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-02 (Hulianwang 2) 2024-240B 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-03 (Hulianwang 3) 2024-240C 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-04 (Hulianwang 4) 2024-240D 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-05 (Hulianwang 5) 2024-240E 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-06 (Hulianwang 6) 2024-240F 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-07 (Hulianwang 7) 2024-240G 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-08 (Hulianwang 8) 2024-240H 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-09 (Hulianwang 9) 2024-240J 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L01-10 (Hulianwang 10) 2024-240K 16.12.2024 We LC-101 CZ-5B/YZ2 with HWD L01-01, ..., L01-10
HWD L02-01 (Hulianwang 11) 2025-030A 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L02-02 (Hulianwang 12) 2025-030B 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L02-03 (Hulianwang 13) 2025-030C 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L02-04 (Hulianwang 14) 2025-030D 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L02-05 (Hulianwang 15) 2025-030E 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L02-06 (Hulianwang 16) 2025-030F 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L02-07 (Hulianwang 17) 2025-030G 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L02-08 (Hulianwang 18) 2025-030H 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L02-09 (Hulianwang 19) 2025-030J 11.02.2025 We LC-201 CZ-8A (1) with HWD L02-01, ..., L02-09
HWD L03-01 (Hulianwang 20) 2025-086A 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-02 (Hulianwang 21) 2025-086B 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-03 (Hulianwang 22) 2025-086C 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-04 (Hulianwang 23) 2025-086D 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-05 (Hulianwang 24) 2025-086E 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-06 (Hulianwang 25) 2025-086F 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-07 (Hulianwang 26) 2025-086G 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-08 (Hulianwang 27) 2025-086H 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-09 (Hulianwang 28) 2025-086J 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L03-10 (Hulianwang 29) 2025-086K 28.04.2025 We LC-101 CZ-5B/YZ2 with HWD L03-01, ..., L03-10
HWD L05-01 (Hulianwang 35) 2025-159A 27.07.2025 TY LC-9A CZ-6A with HWD L05-01, ..., L05-05
HWD L05-02 (Hulianwang 36) 2025-159B 27.07.2025 TY LC-9A CZ-6A with HWD L05-01, ..., L05-05
HWD L05-03 (Hulianwang 37) 2025-159C 27.07.2025 TY LC-9A CZ-6A with HWD L05-01, ..., L05-05
HWD L05-04 (Hulianwang 38) 2025-159D 27.07.2025 TY LC-9A CZ-6A with HWD L05-01, ..., L05-05
HWD L05-05 (Hulianwang 39) 2025-159E 27.07.2025 TY LC-9A CZ-6A with HWD L05-01, ..., L05-05
HWD L08-01 (Hulianwang 58) 2025-174A 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-02 (Hulianwang 59) 2025-174B 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-03 (Hulianwang 60) 2025-174C 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-04 (Hulianwang 61) 2025-174D 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-05 (Hulianwang 62) 2025-174E 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-06 (Hulianwang 63) 2025-174F 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-07 (Hulianwang 64) 2025-174G 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-08 (Hulianwang 65) 2025-174H 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-09 (Hulianwang 66) 2025-174J 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L08-10 (Hulianwang 67) 2025-174K 13.08.2025 We LC-101 CZ-5B/YZ2 with HWD L08-01, ..., L08-10
HWD L09-01 (Hulianwang 68) 2025-178A 17.08.2025 TY LC-9A CZ-6A with HWD L09-01, ..., L09-05
HWD L09-02 (Hulianwang 69) 2025-178B 17.08.2025 TY LC-9A CZ-6A with HWD L09-01, ..., L09-05
HWD L09-03 (Hulianwang 70) 2025-178C 17.08.2025 TY LC-9A CZ-6A with HWD L09-01, ..., L09-05
HWD L09-04 (Hulianwang 71) 2025-178D 17.08.2025 TY LC-9A CZ-6A with HWD L09-01, ..., L09-05
HWD L09-05 (Hulianwang 72) 2025-178E 17.08.2025 TY LC-9A CZ-6A with HWD L09-01, ..., L09-05
HWD L12-01 (Hulianwang 87) 2025-231A 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L12-02 (Hulianwang 88) 2025-231B 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L12-03 (Hulianwang 89) 2025-231C 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L12-04 (Hulianwang 90) 2025-231D 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L12-05 (Hulianwang 91) 2025-231E 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L12-06 (Hulianwang 92) 2025-231F 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L12-07 (Hulianwang 93) 2025-231G 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L12-08 (Hulianwang 94) 2025-231H 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L12-09 (Hulianwang 95) 2025-231J 16.10.2025 HCS LP-1 CZ-8A (1) with HWD L12-01, ..., L12-09
HWD L14-01 (Hulianwang 105) 2025-285A 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L14-02 (Hulianwang 106) 2025-285B 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L14-03 (Hulianwang 107) 2025-285C 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L14-04 (Hulianwang 108) 2025-285D 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L14-05 (Hulianwang 109) 2025-285E 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L14-06 (Hulianwang 110) 2025-285F 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L14-07 (Hulianwang 111) 2025-285G 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L14-08 (Hulianwang 112) 2025-285H 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L14-09 (Hulianwang 113) 2025-285J 06.12.2025 HCS LP-1 CZ-8A (1) with HWD L14-01, ..., L14-09
HWD L15-01 (Hulianwang 114) 2025-287A 08.12.2025 TY LC-9A CZ-6A with HWD L15-01, ..., L15-05
HWD L15-02 (Hulianwang 115) 2025-287B 08.12.2025 TY LC-9A CZ-6A with HWD L15-01, ..., L15-05
HWD L15-03 (Hulianwang 116) 2025-287C 08.12.2025 TY LC-9A CZ-6A with HWD L15-01, ..., L15-05
HWD L15-04 (Hulianwang 117) 2025-287D 08.12.2025 TY LC-9A CZ-6A with HWD L15-01, ..., L15-05
HWD L15-05 (Hulianwang 118) 2025-287E 08.12.2025 TY LC-9A CZ-6A with HWD L15-01, ..., L15-05
HWD L17-01 (Hulianwang 128) 2025-311A 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L17-02 (Hulianwang 129) 2025-311B 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L17-03 (Hulianwang 130) 2025-311C 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L17-04 (Hulianwang 131) 2025-311D 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L17-05 (Hulianwang 132) 2025-311E 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L17-06 (Hulianwang 133) 2025-311F 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L17-07 (Hulianwang 134) 2025-311G 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L17-08 (Hulianwang 135) 2025-311H 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L17-09 (Hulianwang 136) 2025-311J 26.12.2025 HCS LP-1 CZ-8A (1) with HWD L17-01, ..., L17-09
HWD L18-01 (Hulianwang 137) 2026-007A 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L18-02 (Hulianwang 138) 2026-007B 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L18-03 (Hulianwang 139) 2026-007C 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L18-04 (Hulianwang 140) 2026-007D 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L18-05 (Hulianwang 141) 2026-007E 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L18-06 (Hulianwang 142) 2026-007F 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L18-07 (Hulianwang 143) 2026-007G 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L18-08 (Hulianwang 144) 2026-007H 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L18-09 (Hulianwang 145) 2026-007J 13.01.2026 HCS LP-1 CZ-8A (1) with HWD L18-01, ..., L18-09
HWD L20-01 (Hulianwang 155) 2026-047A 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L20-02 (Hulianwang 156) 2026-047B 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L20-03 (Hulianwang 157) 2026-047C 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L20-04 (Hulianwang 158) 2026-047D 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L20-05 (Hulianwang 159) 2026-047E 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L20-06 (Hulianwang 160) 2026-047F 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L20-07 (Hulianwang 161) 2026-047G 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L20-08 (Hulianwang 162) 2026-047H 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L20-09 (Hulianwang 163) 2026-047J 12.03.2026 HCS LP-1 CZ-8A (1) with HWD L20-01, ..., L20-09
HWD L23-01 (Hulianwang 178) 2026-176A 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09
HWD L23-02 (Hulianwang 179) 2026-176B 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09
HWD L23-03 (Hulianwang 180) 2026-176C 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09
HWD L23-04 (Hulianwang 181) 2026-176D 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09
HWD L23-05 (Hulianwang 182) 2026-176E 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09
HWD L23-06 (Hulianwang 183) 2026-176F 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09
HWD L23-07 (Hulianwang 184) 2026-176G 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09
HWD L23-08 (Hulianwang 185) 2026-176H 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09
HWD L23-09 (Hulianwang 186) 2026-176J 04.08.2026 HCS LP-1 CZ-8A (2) with HWD L23-01, ..., L23-09

Launch Sites:

  • HCS =   Hainan Commercial Spaceport, Hainan, China   China
  • TY =   Taiyuan Satellite Launch Center (TSLC), Wuzhai, Shanxi, China   China
  • We =   Wenchang Space Launch Center (WSLC), Hainan, China   China

Cite this page: