Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
STS

Shuttle cutaway
Shuttle cutaway showing deployment of LDEF
Credit: NASA
The Space Transportation System (Space Shuttle) was conceived originally as a completely reusable system that would provide cheap, routine access to space and replace all American and civilian military launch vehicles. Crippled by technological overreach, political compromise, and budget limitations, it instead ended up costing more than the expendable rockets it was to have replaced. STS sucked the money out of all other NASA projects for half a century. The military abandoned its use after the Challenger shuttle explosion in the 1980's.
The origins of the Space Transportation System (space shuttle) can be traced back to the mid-1960's. At that time the US Air Force conducted a series of classified studies on next-generation space transportation systems to support projected large military space stations, conduct manned military reconnaissance and strike missions, and reduce the cost of launching military payloads. These Air Force studies finally concluded that a partially reusable vehicle was the most attractive, along the lines of Lockheed's Starlifter, which had a large drop tank but returned the engines and avionics of the vehicle for reuse. The Air Force probably spent around $ 1 billion on 'black' technology development tests at this time, including work on linear aerospike engines and high fineness lifting body shapes that would re-emerge again 30 years later in Lockheed's X-33 space shuttle successor.
NASA also had ambitious plans - for large space stations, lunar bases, nuclear interplanetary rocket stages, and manned Mars expeditions. NASA went through a long iterative process in designing and selecting the space shuttle, leading ultimately to the same conclusion as the Air Force. Initial Phase A concepts were for two stages, both either winged or lifting bodies, both recovered at the launch site for reuse. NASA explored some alternative concepts, including Lockheed's LS200 single orbiter with drop tank, and Chrysler's SERV ballistic single stage to orbit vehicle, before proceeding to Phase B. The Phase B designs were more refined but still used the same two-stage approach. At this point the controversy were over large cross-range winged designs, medium cross-range lifting body designs, and minimal cross-range stub-wing designs. NASA's Faget strongly pushed for the stub-wing design.
Eventually the Nixon administration advised NASA that not only were there to be no flights to Mars, no nuclear interplanetary stages, no space station, no more Saturn V's, no orbital transfer vehicle - but there wouldn't be a space shuttle either if NASA couldn't get the development cost down and get the USAF to participate. A USAF requirement was a large cross-range to allow recovery of the orbiter at Vandenberg AFB from polar orbits in the case of abort-once-around scenarios. This, together with wind tunnel studies indicating that Faget's straight wing was unstable at re-entry speeds, drove NASA to the delta wing. The reduction in development cost led NASA to throw away the concept of reusing anything but the engines and guidance systems. Instead the shuttle would be boosted by cheap solid fuel boosters and, taking a concept from the Air Force, the propellants would be put in a big expendable drop tank.
Following the usual charade of competitive bidding, NASA picked the same contractors as for X-15 and Apollo, who would build precisely the vehicle it had in mind. North American Rockwell was selected to build the orbiter, with its Rocketdyne Division making the main engines, Thiokol for the solid rocket boosters, and Martin Marietta for the External Tank, to be built at the government Saturn IC factory at Michoud.
To finance the Shuttle in the austere 1970's, already-built Apollo hardware that would have supported a second Skylab mission was sent to museums and American manned space flight went into a long hiatus. Budget cuts and overruns reduced the number of shuttles built from five to four and delayed the first flight from 1978 to 1981 (thereby ruining the plan to save Skylab on an early shuttle mission). Although several elements were cancelled (a space tug), the project did not much overrun its original cost (development ended up costing $ 6.744 billion in 1971 dollars, versus $ 5.15 billion estimated - less than a quarter of the Apollo program cost).
The pretext for the shuttle was that it would be much cheaper than expendable launch vehicles and would replace them all. Production was accordingly terminated by the US government of Delta, Atlas, and Titan vehicles. NASA staff and contractors were under incredible pressure to justify this decision by increasing the shuttle launch rate, lowering the turn-around time, and thereby reducing the cost per launch. When the shuttle Challenger exploded and the entire US space lift program was shut down for almost a year, the fallacy of this situation was exposed. The US Air Force and commercial users returned to use of expendable launch vehicles. When the shuttle began flying again, it was only for NASA programs.
In the final analysis the shuttle came up short in two areas. First, the shuttle orbiter ended up almost 20% over its specified weight - resulting in it being unable to boost the US Air Force's payloads into polar orbits from Vandenberg. Lighter filament-would casing Solid Rocket Boosters were being developed for use in flights from Vandenberg, but even this did not seem enough. After the Challenger explosion the USAF was able to extricate itself from the Shuttle program. The Vandenberg launch complex, built at the cost of billions, was mothballed. The Air Force started a new costly development program to design the Titan 4 expendable rocket for its large military payloads.
The second was that it failed, by most definitions, to reduce the cost of putting payloads into orbit. The shuttle program inherited from Apollo huge fixed costs - the Manned Spaceflight Center in Houston, the cadres of government and contractor workers at the Kennedy Space Center, and so on. The result was that there is a fixed base cost of around $ 2.8 billion per year, just to keep all those people and facilities in place, even if you don't conduct any flights at all (as occurred after the shuttle disaster). The marginal cost of each flight added to this base is under $ 100 million per year. Seen this way the shuttle is almost competitive expendable boosters - but doesn't come anywhere near the reductions NASA promised when development started. But if you divide the usual number of flights per year by the total costs, you come up with a figure of $ 245 million per year, significantly more than a Titan 4 or Proton launch with the same payload.
If the shuttle failed as a space truck, it succeeded in keeping the US in the manned spaceflight business in a period of low public interest and political support. With the excuse of delivering payloads to orbit, NASA got to fly up to seven astronauts and run a host of supplementary experiments and payloads with each flight.
With construction of the international space station beginning, NASA finally looked forward to using the shuttle for its intended purpose. Due to the lower than planned flight rate, NASA's contractors were confident they can keep the existing shuttles flying through 2030. The real test come when (as was inevitable) another shuttle was lost. NASA then decided to essentially to complete the station only enough to keep its international partners happy, then retire the shuttle by 2010. It was to be replaced by a modernized Apollo capsule, dubbed the Orion. The shuttle turned out to be a fifty-year detour to nowhere. By 2020 NASA hoped to have the sort of lunar base it would have had by 1980 if it had continued with Apollo rather than started the shuttle program.
Subtopics
 | STS-1 First rocketplane flight to orbit. First flight of space shuttle. The only time a new spacecraft was launched manned on its first flight. Many thought it would be a disaster. |
 | STS-2 First reuse of a manned space vehicle. First use of a remote manipulator in space. First use of a Spacelab pallet. Second shuttle test flight. Experienced erosion of the primary O-ring in the right SRM aft field joint, the worst until the loss of the space shuttle Challenger. |
 | STS-3 First and only landing by a shuttle at White Sands, New Mexico, after weather at Edwards did not permit landing there. |
 | STS-4 First Getaway Specials flown. Fourth space shuttle test flight. |
 | STS-5 First operational STS mission, first commercial communications satellites deployed, first four-person spacecraft crew. EVA cancelled because one astronaut was vomiting so severely due to space sickness. |
 | STS-6 First flight of space shuttle Challenger. First space walk of Shuttle program. Deployed Tracking and Data Relay Satellite. |
 | STS-7 First US woman in space. Record five crew aboard a single spacecraft to date. Thagard flew as physician to study space sickness, which had severely impacted STS-5 operations. Deployed Anik C2, Palapa B1; deployed and retrieved SPAS platform. |
 | STS-8 First African-American in space. First shuttle night launch and night landing. First night launch and night landing. Deployed Insat 1B. |
 | STS-10 Planned Department of Defense shuttle mission. Cancelled due to payload delays. |
 | STS-9 Spacelab 1. First West German to fly in space. First Spacelab mission. Record six crew size in a single spacecraft. Suspect exhaust nozzle on right solid rocket booster. Landing delayed when two computers failed. Landed on fire when hydraulic pump leaked. |
 | STS-41-B First untethered space walk. First shuttle landing at Kennedy Space Center. Deployed Westar 6, Palapa B2; tested Manned Maneuvering Unit (MMU). O-ring erosion in both the right hand nozzle joint and the left SRB forward field joint. |
 | STS-12 Planned TDRS/IUS deployment shuttle mission. Cancelled after IUS failures. |
 | STS-41-C First repair on orbit of a satellite, Solar Maximum Mission, snared by astronaut using MMU. Deployed LDEF. Experienced erosion of the primary O-ring in the right-hand nozzle joint. |
 | STS-41-E Planned Department of Defense shuttle mission. Cancelled due to IUS failure. |
 | STS-41-F Canceled after the STS-10 launch abort required reshuffling of the shuttle schedule. Planned shuttle mission for deployment of commercial communications satellites. The STS-41F payload was added to STS-41D.Officially "cancelled due to payload delays". |
 | STS-41-D First flight of space shuttle Discovery; deployed SBS 4, Leasat 1, Telstar 3C. First launch attempt aborted at T-3 seconds after SSMEs ignited. Toilet failed during mission. First occurrence of blow-by in SRB field joints. |
 | STS-41-H Planned Department of Defense or TDRS deployment shuttle mission. Cancelled due to IUS failure. |
 | STS-41-G First spaceflight to include two women. First American woman to walk in space. First Canadian astronaut. Record crew size aboard a single spacecraft. Deployed Earth Radiation Budget Satellite; performed high resolution Earth imagery. |
 | STS-51-A First retrieval of two satellites (Palapa B-2 and Westar Vl) for return to earth. Deployed Anik D2, Leasat 2. |
 | STS-51-C First shuttle military mission. Deployed USA 8 (Aquacade ELINT spacecraft). Experienced blow-by in both nozzle joints and erosion and blow-by in two case joints. |
 | STS-51-E Planned TDRS/IUS deployment shuttle mission. Cancelled due to IUS failure. |
 | STS-51-AA Planned shuttle mission. Cancelled due to payload delays. |
 | STS-51-D First politician in space. Deployed Telesat-I (successful) and Syncom IV-3 (motor failed). Inboard right-side brake locked on landing, resulting in severe damage. Senator aboard resented, and had one of the worst cases of space sickness ever recorded. |
 | STS-51-B Spacelab 3. Deployed Nusat. Conducted materials processing, environmental, life science, astrophysics, and technology experiments. Suffered the worst O-ring erosion experienced prior to the loss of Challenger |
 | STS-51-G First Saudi astronaut. Deployed and retrieved Spartan 1; launched Morelos 1, Arabsat 1B, Telstar 3D. Experienced blow-by and erosion in both nozzle joints. |
 | STS-51-DA Planned TDRS/IUS deployment shuttle mission. Cancelled due to IUS failure. |
 | STS-51-F Spacelab 2. At 5 minutes, 45 seconds into ascent the number one engine shut down prematurely due to a sensor problem and an abort to orbit was declared. Despite the anomaly the mission continued. Launched PDP; carried Spacelab 2. |
 | STS-51-I First retrieval, repair, and relaunch of a satellite in orbit (Leasat 3). Launched Aussat 1, ASC 1, Leasat 4. Suffered primary O-ring erosion in two locations on the left-hand SRM nozzle joint. |
 | STS-51-J First flight of shuttle Atlantis. Military mission, Deployed USA-11, USA-12. |
 | STS-61-A Spacelab D-1. Record set of eight crew launched aboard a single spacecraft. First Dutch astronaut. Launched GLOMR. Six of the eight crew members were divided into a blue and red team working 12-hour shifts. Experienced O-ring erosion. |
 | STS-51-H Planned EOM-1/2 shuttle mission. Cancelled due to payload delays. |
 | STS-61-B Deployed Morelos 2, Aussat 2, Satcom K2, OEX. Experienced primary O-ring erosion in both nozzle joints |
 | STS-61-C Launched Satcom K1. Second politician in space; he bumped Jarvis to later launch on which he was killed. Launch scrub saved crew from death due to undetected jammed SSME valve. Experienced nozzle joint O-ring erosion. |
 | STS-51-L First shuttle launch from pad LC-39B. An O-ring failure in a solid rocket booster led to leaking of hot gases against the external tank; exploded 73 seconds after launch, all seven crew, with no means of escape, were killed when crew cabin hit the ocean. |
 | STS-61-E Planned Astro-1 shuttle mission. Cancelled after Challenger disaster. |
 | STS-61-F Planned shuttle mission for deployment of Ulysses spacecraft. Cancelled after Challenger disaster. |
 | STS-61-G Planned shuttle mission for deployment of Galileo spacecraft. Cancelled after Challenger disaster. |
 | STS-61-H Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster. |
 | STS-62-A Planned Department of Defense shuttle mission. Cancelled after Challenger disaster. Would have been first launch from the ill-fated SLC-6 launch site at Vandenberg, California. |
 | STS-61-M Planned TDRS/IUS deployment shuttle mission. Cancelled after Challenger disaster. |
 | STS-61-J Planned shuttle mission for deployment of Hubble space telescope. Cancelled after Challenger disaster. |
 | STS-61-N Planned Department of Defense shuttle mission. Cancelled after Challenger disaster. |
 | STS-61-I Planned shuttle LDEF (Long Duration Exposure Facility) recovery mission. Cancelled after Challenger disaster. |
 | STS-62-B Planned Department of Defense shuttle mission. Cancelled after Challenger disaster. |
 | STS-61-K Planned EOM-1 shuttle mission. Cancelled after Challenger disaster. No crew named, later combined with STS-61K |
 | STS-61-L Planned shuttle mission for deployment of commercial communications satellites. Would have launched the first American journalist in space from Launch Complex 39B. Cancelled after Challenger disaster. |
 | STS-71-B Planned shuttle mission. Cancelled after Challenger disaster. |
 | STS-71-A Planned Astro-2 shuttle mission. Cancelled after Challenger disaster. |
 | STS-71-C Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster. |
 | STS-71-D Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster. |
 | STS-71-E Planned SLS-1 shuttle mission. Cancelled after Challenger disaster. |
 | STS-71-F Planned shuttle mission. Cancelled after Challenger disaster. |
 | STS-71-M Planned Astro-3 shuttle mission. Cancelled after Challenger disaster. |
 | STS-81-G Planned Spacelab-J shuttle mission. Cancelled after Challenger disaster. |
 | STS-81-M Planned SLS-2 shuttle mission. Cancelled after Challenger disaster. |
 | STS-51-K Planned Spacelab-D1 shuttle mission. Cancelled after Challenger disaster. No crew selected; renamed STS-61A |
 | STS-26 First shuttle reflight after Challenger disaster. Deployed TDRS 3. |
 | STS-27 Manned military mission. Robot arm used to deploy a classified satellite. At T+85 seconds a large piece of SRB nose cone struck the shuttle. The orbiter took 707 hits; one tile was knocked off. The crew was unsure if they would survive reentry. |
 | STS-30 Deployed Magellan Venus probe. One of five General Purpose Computers failed and had to be replaced with a sixth onboard hardware spare. First time a GPC was switched on orbit. |
 | STS-28 Deployed two classified satellites. |
 | STS-34 Deployed Galileo Jupiter probe. |
 | STS-33 Deployed a classified payload. |
 | STS-32 Deployed Leasat 5, retrieved LDEF. Night landing. Second bipod ramp foam loss. |
 | STS-36 Classified mission in 62 degree orbit, the highest inclination orbit ever flown by an American mission. Launch delayed due to illness of crew members. |
 | STS-31 Deployed the Hubble Space Telescope. |
 | STS-41 Deployed Ulysses spacecraft. |
 | STS-38 Deployed a classified payload. Launch delayed from July 1990 for series of technical problems. First post-Challenger landing at KSC after mission extended one day due to unacceptable crosswinds at original planned landing site, Edwards. |
 | STS-35 Carried ASTRO-1 observatory. Launch scrubbed several times due to hydrogen leaks. |
 | STS-37 Delivered the Gamma-Ray Observatory (GRO) to orbit. Unscheduled EVA to manually deploy the GRO's high-gain antenna, which failed to deploy upon ground command. |
 | STS-39 Deployed USA-70, CRO A, CRO B, CRO C; deployed and retrieved Infrared Background Signature Survey . |
 | STS-40 Spacelab SLS-1. Carried life sciences experiments. |
 | STS-43 Deployed TDRS 5 satellite. |
 | STS-48 Deployed UARS Upper Atmosphere Research Satellite; conducted materials and biological research. |
 | STS-44 Deployed Defense Support Program satellite. |
 | STS-42 Spacelab International Microgravity Laboratory-1. |
 | STS-45 First Belgian astronaut. Carried ATLAS-1 experimental package. |
 | STS-49 First flight of shuttle Endeavour. First three-person spacewalk. First active dual rendezvous of two orbiting spacecraft (Endeavour and Intelsat-6). Retrieved Intelsat 6 and attached new SRM. First deployment of a drag chute on the orbiter fleet. |
 | STS-50 Spacelab USML-1 (United States Microgravity Laboratory). First extended-duration shuttle mission. |
 | STS-46 First Italian astronaut. First Swiss astronaut. Deployed Eureca-1; failed to deploy Italian tether probe TSS-1. |
 | STS-47 Spacelab-J. First on-time Shuttle launch since November 1985. First Japanese astronaut aboard shuttle. First African-American woman to fly in space. First married couple to fly on the same space mission. Conducted microgravity and biology experiments. |
 | STS-52 Deployed Lageos 2, CTA. External tank lost a 10 x 20 cm corner of the left bipod ramp; orbiter took a higher-than-average 290 hits on upper and lower tiles. |
 | STS-53 Deployed classified military satellite USA-89. The ODERACS payload was unable to be deployed because of payload equipment malfunction. |
 | STS-56 First radio contact between Shuttle and Mir space station. Carried ATLAS-2; deployed and retrieved Spartan 201. |
 | STS-55 Spacelab-D2. German materials experiments. |
 | STS-57 First flight of Spacehab module. Retrieved Eureca-1 spacecraft. |
 | STS-51 First shuttle night landing in Florida. Deployed and retrieved Orfeus-SPAS. During the EVA conducted tests in support of the Hubble Space Telescope first servicing mission and future EVAs, including Space Station assembly and maintenance. |
 | STS-58 Spacelab SLS-2. Biological, microgravity experiments. |
 | STS-61 Hubble repair mission. Conducted the most EVAs on a Space Shuttle flight to that date. |
 | STS-60 First flight of a Russian cosmonaut aboard an American spacecraft. Deployed ODERACS A-F, Bremsat, carried Wake Shield Facility. |
 | STS-62 Carried United States Microgravity Payload USMP-2, OAST-2, SAMPIE, TES, EISG experiments. The external tank lost a 2.4 x 7 cm piece of foam in the rear face of the left bipod ramp. |
 | STS-59 Spacelab SRL-1 / SIR-C SAR radar. The Space Radar Laboratory obtained radar high-resolution images of approximately 25 percent of the planet's land surfaces. |
 | STS-65 First Japanese woman to fly in space. Carried IML-2; microgravity, biology experiments. |
| STS-64 Flew Lidar In-Space Technology Experiment (LITE), Shuttle Pointed Autonomous Research Tool for Astronomy (SPARTAN) 201-II experiments. |
 | STS-68 Carried SIR-C SAR. Continued high-resolution radar mapping of the earth begun on STS-59. |
 | STS-66 Carried Atlas-3 laboratory; deployed and retrieved CRISTA-SPAS. |
 | STS-67 First shuttle mission connected to the Internet. Carried Astro 2 astronomy payload with 3 UV telescopes. |
 | STS-69 Deployed and retrieved Spartan 201, Wake Shield Facility 2. |
 | STS-73 Carried USML-2 for microgravity experiments. |
 | STS-72 Deployed and retrieved OAST Flyer; retrieved SFU Space Flyer Unit. Beside the two satellite retrievals, the mission included two spacewalks. |
 | STS-75 Carried TSS-1R tether satellite; satellite tether broke during deployment, making TSS-1R an unintentional free flyer. |
 | STS-77 Deployed and retrieved Spartan 2; deployed PAMS-STU; carried Spacehab module. |
 | STS-78 Life and Microgravity Spacelab; human biological and microgravity experiments. |
 | STS-80 Carried the Orfeus astronomy satellite, Wake Shield Facility. The shuttle's exit hatch would not open and NASA cancelled the planned spacewalks of the mission. |
 | STS-82 Hubble repair mission; five spacewalks. |
 | STS-83 First Microgravity Science Laboratory (MSL-1) mission. Orbiter recalled to earth after three days of flight when one of three fuel cells failed. Mission reflown as STS-94. |
 | STS-94 First shuttle mission reflight (same vehicle, crew, and payload as curtailed STS-83 mission). MSL-1 Microgravity Science Laboratory. |
 | STS-85 Deployed and retrieved the CRISTA-SPAS-2 (the Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2) designed to study Earth's middle atmosphere. |
 | STS-87 Microgravity science mission. Spartan 201 was released, but had to be recaptured by hand during EVA. Loss of external tank intertank foam results in over 100 hits on orbiter heat shield. |
 | STS-95 First Spanish astronaut. Oldest man in space, longest gap between two flights for an astronaut. The flight of STS-95 provoked more publicity for NASA than any other flight in years. Spartan 201 satellite released and retrieved. |
 | STS-93 Delivered Chandra spacecraft. Hydrogen fuel leaked out during ascent, resulting in shuttle running out of propellant and ending up in an orbit 11 km lower than planned. |
 | STS-103 Hubble Space Telescope (HST) servicing mission SM-3A. |
 | STS-99 Deployed the 61 meter long STRM mast, a side-looking radar that digitally mapped the entire land surface of the Earth between latitudes 60 deg N and 54 deg S. |
 | STS-109 Hubble Servicing Mission 3B. |
 | STS-107 First Israeli astronaut. Conducted experiments in Double Spacehab module. Crew perished when shuttle broke up during re-entry. Cause was damage to a leading-edge RCC from foam breaking off of external tank bipod strut. |
 | STS-128A Hubble Space Telescope Servicing Flight 5. Flight delayed, then cancelled after the Columbia disaster. No crew had been named at the time of the loss of Columbia. Resurrected later after Congressional pressure. |
| STS-125 Fourth and final servicing mission to the Hubble Space Telescope. Only shuttle mission authorized prior to shuttle retirement not to go to the ISS - therefore with no means of space rescue should the heat shield be damaged during ascent to orbit. |
Family:
Spaceplane.
People:
Glenn,
Henize,
Thornton, Bill,
Lind,
Young,
Garriott,
Brand,
van den Berg, Lodewijk,
Weitz,
Engle,
Garn,
Peterson,
Hartsfield,
Musgrave,
Lousma,
Acton,
Mattingly,
Overmyer,
Fullerton,
Parker,
McCandless,
Allen,
Crippen,
Truly,
Bobko,
Fabian,
Lenoir,
Scobee,
Griggs,
Wang,
Crouch,
Furrer,
Gregory,
Frimout,
Hauck,
Merbold,
Williams, Donald,
England,
Springer,
Blaha,
Nelson, Bill,
Bluford,
Lucid,
Brandenstein,
Creighton,
Thagard,
Casper,
Bridges,
McCulley,
McBride,
Durrance,
Walker, Dave,
Scully-Power,
van Hoften,
Jarvis,
Nicollier,
Spring,
Veach,
Shriver,
Hoffman,
Bartoe,
Smith,
Messerschmid,
Shaw,
Thuot,
Grabe,
Buchli,
Mullane,
Tryggvason,
Bondar,
Hughes-Fulford,
Coats,
Adamson,
Baudry,
Ockels,
Fisher, William,
Gaffney,
Onizuka,
Lounge,
Covey,
Bolden,
Richards,
O Connor,
Malerba,
Hart,
Nagel,
Gibson,
Titov, Vladimir,
Cleave,
Carter,
Seddon,
Gardner, Guy,
Ross,
Mohri,
Lichtenberg,
Payton,
Walker,
McAuliffe,
Cenker,
Gardner,
Cabana,
Garneau,
Dunbar,
Voss,
Resnik,
Favier,
Apt,
Sacco,
Leestma,
Culbertson,
Shepherd,
Fisher,
Tognini,
Wilcutt,
Cameron,
Melnick,
Tanner,
Hilmers,
Chang-Diaz,
Cockrell,
DeLucas,
Nelson,
Scott, Winston,
Trinh,
McNair,
Meade,
Kadenyuk,
Reightler,
Ivins,
Akers,
Parise,
Ride,
Gutierrez,
Oswald,
McArthur,
Schlegel,
Brady,
Sullivan,
Brown, Mark,
Hawley,
Thomas, Andrew,
Leslie,
Hammond,
Readdy,
Runco,
Neri Vela,
Bagian,
Mukai,
McMonagle,
Pailes,
Godwin,
Henricks,
Lee,
Hennen,
Thornton,
Clifford,
Wetherbee,
Sega,
Baker,
Duffy,
Thirsk,
Thiele,
Baker, Mike,
Davis,
Barry,
Walter,
Williams, Dave,
Ashby,
Ramon,
Guidoni,
Doi,
Chilton,
MacLean,
Stewart,
Linenger,
Jones,
Thomas,
Precourt,
Allen, Andy,
Gemar,
Walz,
Hieb,
Robinson,
Low,
Brown,
Harbaugh,
Brown, David,
Gernhardt,
Searfoss,
Buckey,
Harris,
Al-Saud,
Rominger,
Wolf,
Kregel,
Halsell,
Voss, Janice,
Newman,
Jemison,
Bowersox,
Collins, Eileen,
Fettman,
Foale,
Horowitz,
Carey,
Gorie,
Gregory, William,
Husband,
Bursch,
Linnehan,
Linteris,
Helms,
Ochoa,
Lopez-Alegria,
Wisoff,
Krikalyov,
Jett,
Grunsfeld,
Clervoy,
Currie,
Smith, Steven,
Cheli,
Jernigan,
Lawrence,
Kavandi,
Altman,
Hire,
Anderson,
Dunlap,
Lindsey,
Chiao,
Pawelczyk,
Coleman, Catherine,
Clark,
Chawla,
Parazynski,
McCool,
Kilrain,
Curbeam,
Massimino,
Weber, Mary,
Duque,
Wakata,
Kelly, Scott.
Country:
USA.
Spacecraft:
Columbia,
Challenger,
TDRS,
Discovery,
Spartan,
Atlantis,
OEX Target,
HS 601,
AFP-675,
MPEC,
Endeavour,
CTA,
SEDS,
Spacehab,
SEDSAT.
Flights:
STS-1,
STS-2,
STS-3,
STS-4,
STS-5,
STS-6,
STS-7,
STS-8,
STS-10,
STS-9,
STS-41-B,
STS-12,
STS-41-C,
STS-41-E,
STS-41-F,
STS-41-D,
STS-41-H,
STS-41-G,
STS-51-A,
STS-51-C,
STS-51-E,
STS-51-AA,
STS-51-D,
STS-51-B,
STS-51-G,
STS-51-DA,
STS-51-F,
STS-51-I,
STS-51-J,
STS-61-A,
STS-51-H,
STS-61-B,
STS-61-C,
STS-51-L,
STS-61-E,
STS-61-F,
STS-61-G,
STS-61-H,
STS-62-A,
STS-61-M,
STS-61-J,
STS-61-N,
STS-61-I,
STS-62-B,
STS-61-K,
STS-61-L,
STS-71-B,
STS-71-C,
STS-71-D,
STS-71-E,
STS-71-F,
STS-81-M,
STS-26,
STS-27,
STS-29,
STS-30,
STS-28,
STS-34,
STS-33,
STS-32,
STS-36,
STS-31,
STS-41,
STS-38,
STS-35,
STS-37,
STS-39,
STS-40,
STS-43,
STS-48,
STS-44,
STS-42,
STS-45,
STS-49,
STS-50,
STS-46,
STS-47,
STS-52,
STS-53,
STS-54,
STS-56,
STS-55,
STS-57,
STS-51,
STS-58,
STS-61,
STS-60,
STS-62,
STS-59,
STS-65,
STS-64,
STS-68,
STS-66,
STS-67,
STS-70,
STS-69,
STS-73,
STS-72,
STS-75,
STS-77,
STS-78,
STS-80,
STS-82,
STS-83,
STS-94,
STS-85,
STS-87,
STS-90,
STS-95,
STS-93,
STS-103,
STS-99,
STS-109,
STS-107,
STS-128A.
Launch Vehicles:
Space Shuttle,
Atlas IIA,
Delta 7326-9.5.
Launch Sites:
Cape Canaveral.
Agency:
NASA,
DARPA,
NASA Greenbelt,
NASA Houston,
El Segundo,
.
Photo Gallery
 | Shuttle Orbiter Shuttle Orbiter side view Credit: © Mark Wade |
 | Shuttle Orbiter Shuttle Orbiter 2 view Credit: © Mark Wade |
1969 April 21 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Space Shuttle Task Group formed - .
Nation: USA.
Program: STS.
The Director of Apollo Test in the NASA Hq. Apollo Program Office, LeRoy E. Day, was detailed to head the MSF Space Shuttle Task Group. The group would provide NASA with material for a report on the Space Shuttle to the President's Space Task Group..
1972 July 26 - .
- Contract awarded for shuttle OV-102. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1972 August 9 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle go-ahead. - .
Nation: USA.
Program: STS.
Rockwell receives authority to proceed, space shuttle orbiter.
1974 June 4 - .
- Structural assembly of crew module for OV-102 begun. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1974 June 4 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Enterprise construction begins. - .
Nation: USA.
Program: STS.
Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Structural assembly of the crew module for shuttle Enterprise (OV-101) begins at Plant 42 in Palmdale..
1974 July 17 - .
- Shuttle propulsion test article assembly starts. - .
Nation: USA.
Program: STS.
Start long-lead fabrication (MPTA-098).
1974 August 26 - .
- Shuttle Enterprise fuselage assembly starts. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Start structural assembly aft fuselage, Enterprise (OV-101).
1975 January 6 - .
- Shuttle static test article assembly starts. - .
Nation: USA.
Program: STS.
Start long-lead fabrication aft fuselage (STA-099).
1975 March 27 - .
- Shuttle Enterprise fuselage complete. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1975 March 27 - .
- Shuttle Columbia fuselage assembly starts. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Start long-lead fabrication aft fuselage, Columbia (OV-102).
1975 May 23 - .
- Enterprise wings complete. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Wings on dock, Palmdale-less elevons, seals and main gear doors-Enterprise (OV-101).
1975 May 27 - .
- Enterprise vertical stabilizer complete. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Vertical stabilizer on dock, Palmdale (main fin box only), Enterprise (OV-101).
1975 June 24 - .
- Start structural assembly (MPTA-098) - .
Nation: USA.
Program: STS.
1975 August 25 - .
- Shuttle Enterprise final assembly. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Start final assembly and closeout system installation, Enterprise (OV-101).
1975 September 5 - .
- Enterprise aft fuselage complete. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Aft fuselage on dock, Palmdale, Enterprise (OV-101).
1975 October 17 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle SSME first test. - .
Nation: USA.
Program: STS.
Space shuttle main engine first main stage test at NSTL.
1975 October 31 - .
- Enterprise lower fuselage complete. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Lower forward fuselage on dock, Palmdale, Enterprise (OV-101).
1975 November 17 - .
- Columbia crew module started. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Start long-lead fabrication of crew module, Columbia (OV-102).
1975 December 1 - .
- Enterprise upper forward fuselage complete. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Upper forward fuselage on dock, Palmdale, Enterprise (OV-101).
1975 December 20 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- First SSME 60-second duration test, NSTL - .
Nation: USA.
Program: STS.
1975 December 31 - .
- Shuttle 1/4-scale model ground vibration test - .
Nation: USA.
Program: STS.
1/4-scale model ground vibration test facility construction starts..
1976 January 16 - .
- Crew module on dock, Palmdale, Enterprise (OV-101) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 January 23 - .
- MPTA-098 truss on dock, Downey - .
Nation: USA.
Program: STS.
1976 February 16 - .
- Start fabrication forward fuselage (STA-099) - .
Nation: USA.
Program: STS.
1976 March 3 - .
- Payload bay doors on dock, Palmdale, Enterprise - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Payload bay doors on dock, Palmdale, Enterprise (OV-101).
1976 March 12 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise final assembly complete. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Complete final assembly and closeout system installation..
1976 March 15 - .
- Start functional checkout, Enterprise - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Start functional checkout, Enterprise (OV-101)..
1976 March 17 - .
- Complete premate MPTA test structure. - .
Nation: USA.
Program: STS.
Complete premate MPTA test structure, Downey, and deliver to Palmdale.
1976 April 2 - .
- Crew escape system test sled on dock, Downey - .
Nation: USA.
Program: STS.
1976 April 3 - .
- Complete assembly and deliver MPTA structure - .
Nation: USA.
Program: STS.
Complete assembly and deliver MPTA structure on dock, Lockheed test site, Palmdale.
1976 April 22 - .
- Body flap on dock, Palmdale, Enterprise (OV-101) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 May 3 - .
- MPTA-098 proof load test setup - .
Nation: USA.
Program: STS.
MPTA-098 proof load test setup, Lockheed test site, Palmdale.
1976 June 14 - .
- Start aft fuselage assembly (STA-099) - .
Nation: USA.
Program: STS.
1976 June 24 - .
- Complete MPTA-098 proof load test - .
Nation: USA.
Program: STS.
Complete MPTA-098 proof load test, Lockheed test site and on dock, Palmdale.
1976 June 25 - .
- Complete functional checkout, Enterprise (OV-101) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 June 28 - .
- Start horizontal ground vibration tests Enterprise - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Start horizontal ground vibration tests and proof load tests, Enterprise (OV-101).
1976 June 30 - .
- SSME dummy set on dock, Palmdale. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
SSME dummy set on dock, Palmdale, Enterprise (OV-101).
1976 July 8 - .
- MPTA-098 on dock, Downey, without truss assembly - .
Nation: USA.
Program: STS.
1976 July 12 - .
- Start installation secondary structure (MPTA-098) - .
Nation: USA.
Program: STS.
1976 August 1 - .
- Start overland roadway construction from Palmdale - .
Nation: USA.
Program: STS.
Start overland roadway construction from Palmdale to Edwards Air Force Base..
1976 August 2 - .
- Start carrier aircraft modification - .
Nation: USA.
Program: STS.
1976 August 20 - .
- Complete horizontal ground vibration tests - .
Nation: USA.
Program: STS.
1976 August 23 - .
- Start Delta F modification, Enterprise (OV-101) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 August 27 - .
- Shuttle Enterprise - dummy OMS pods delivered. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Reaction control system/orbital maneuvering system pods (simulated), approach and landing tests, on dock, Palmdale, Enterprise.
1976 September 10 - .
- Complete Delta F modifications, Enterprise - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 September 13 - .
- Start preparations for first rollout, Enterprise - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 September 17 - .
- Complete on-stand construction, NSTL - .
Nation: USA.
Program: STS.
1976 September 20 - .
- Start Delta F retest, Enterprise (OV-101) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 October 1 - .
- Start final assembly, wing (STA-099) - .
Nation: USA.
Program: STS.
1976 October 15 - .
- Midfuselage on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1976 October 26 - .
- Escape system test assembly sled ship from Downey - .
Nation: USA.
Program: STS.
Escape system test assembly sled ship from Downey to Holloman, N.M..
1976 October 29 - .
- Complete Delta F retest, Enterprise (OV-101) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 October 31 - .
- Solid rocket booster 1/4-scale model - .
Nation: USA.
Program: STS.
Solid rocket booster 1/4-scale model (burnout configuration).
1976 November 4 - .
- Complete 747 shuttle carrier aircraft modification - .
Nation: USA.
Program: STS.
1976 November 18 - .
- Start escape system sled test, Holloman, N.M. - .
Nation: USA.
Program: STS.
1976 November 26 - .
- Complete integrated checkout, Enterprise (OV-101) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1976 November 28 - .
- Complete orbiter transporter strongback - .
Nation: USA.
Program: STS.
1976 December 7 - .
- Tail cone fairing on dock, Palmdale - .
Nation: USA.
Program: STS.
1976 December 10 - .
- Complete overland roadway construction to Edwards - .
Nation: USA.
Program: STS.
Complete overland roadway construction, Palmdale to Edwards Air Force Base.
1976 December 13 - .
- Start assembly upper forward fuselage, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1976 December 17 - .
- External tank 1/4-scale model on dock, Downey - .
Nation: USA.
Program: STS.
1977 January 3 - .
- Start assembly vertical stabilizer, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 January 14 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Boeing 747 shuttle carrier aircraft delivered - .
Nation: USA.
Program: STS.
Boeing 747 shuttle carrier aircraft delivered to Edwards.
1977 January 25 - .
- Complete aft fuselage assembly on dock, STA-099 - .
Nation: USA.
Program: STS.
Complete aft fuselage assembly on dock, Palmdale (STA-099).
1977 January 28 - .
- Simulated crew module on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1977 January 31 - .
- Mockup SSME's delivered for Enterprise - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Mass simulated SSMEs on dock, Palmdale, Enterprise (OV-101).
1977 January 31 - .
Launch Site:
Edwards.
- Enterprise (OV-101) transported to Edwards AFB - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1977 January 31 - .
- Mass simulated SSMEs on dock, Palmdale, Enterprise - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
1977 February 7 - .
- Enterprise (OV-101)/shuttle carrier aircraft mate - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Enterprise (OV-101)/shuttle carrier aircraft mate start.
1977 February 10 - .
- Midfuselage on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 February 15 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
- Enterprise (OV-101)/shuttle carrier aircraft mated - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Complete Enterprise (OV-101)/shuttle carrier aircraft mated.
1977 February 18 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- First inert captive flight - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Conduct first inert captive flight, Edwards (2 hours, 5 minutes), Enterprise (OV-101).
1977 February 22 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Second inert captive flight - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Conduct second inert captive flight, Edwards (3 hours, 13 minutes), Enterprise (OV-101).
1977 February 25 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Third inert captive flight - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Conduct third inert captive flight, Edwards (2 hours, 28 minutes), Enterprise (OV-101).
1977 February 28 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Fourth inert captive flight - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Conduct fourth inert captive flight, Edwards (2 hours, 11 minutes), Enterprise (OV-101).
1977 March 2 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Fifth inert captive flight - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Conduct fifth inert captive flight, Edwards (1 hour, 39 minutes), Enterprise (OV-101).
1977 March 16 - .
- Wings on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1977 March 21 - .
- Orbiter 1/4-scale model on dock, Downey - .
Nation: USA.
Program: STS.
1977 April 1 - .
- Lower forward fuselage on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1977 April 6 - .
- Vertical stabilizer on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1977 May 20 - .
- Nose landing gear doors on dock, Palmdale(STA-099) - .
Nation: USA.
Program: STS.
1977 May 26 - .
- Aft payload bay doors on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1977 May 27 - .
- Complete systems installation MPTA-098 - .
Nation: USA.
Program: STS.
Complete systems installation/final acceptance, MPTA-098, transport from Downey to Seal Beach.
1977 May 31 - .
- Body flap on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1977 May 31 - .
- SRB 1/4-scale model, burnout and maximum q config - .
Nation: USA.
Program: STS.
1977 May 31 - .
- Body flap on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1977 June 3 - .
- Ship MPTA-098 from Seal Beach, Calif., to NSTL - .
Nation: USA.
Program: STS.
1977 June 7 - .
- Complete integrated checkout of Enterprise - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Complete integrated checkout and hot-fire ground test, Edwards, Enterprise (OV-101).
1977 June 18 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise flight 1 - .
Call Sign: Enterprise. Crew: Fullerton,
Haise.
Nation: USA.
Related Persons: Fullerton,
Haise.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
First manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (55 minutes, 46 seconds).
1977 June 23 - .
- Deliver first SSME to NSTL (MPTA-098) - .
Nation: USA.
Program: STS.
1977 June 24 - .
- Deliver MPTA-098 to NSTL - .
Nation: USA.
Program: STS.
1977 June 28 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise flight 2 - .
Call Sign: Enterprise. Crew: Engle,
Truly.
Nation: USA.
Related Persons: Engle,
Truly.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Second manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (1 hour, 2 minutes).
1977 July 5 - .
- Start fabrication aft fuselage, Discovery - .
Nation: USA.
Program: STS.
Start long-lead fabrication aft fuselage, Discovery (OV-103).
1977 July 8 - .
- Deliver second main engine to NSTL (MPTA-098) - .
Nation: USA.
Program: STS.
1977 July 14 - .
- Deliver third main engine to NSTL (MPTA-098) - .
Nation: USA.
Program: STS.
1977 July 18 - .
- 2-minute firing of SRB at Brigham City, Utah - .
Nation: USA.
Program: STS.
Conduct 2-minute firing of SRB at Brigham City, Utah, Thiokol (2.4 million pounds of thrust).
1977 July 22 - .
- Deliver forward payload bay doors, STA-099 - .
Nation: USA.
Program: STS.
Deliver forward payload bay doors, on dock, Palmdale (STA-099).
1977 July 26 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise flight 3 - .
Call Sign: Enterprise. Crew: Fullerton,
Haise.
Nation: USA.
Related Persons: Fullerton,
Haise.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Third manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (59 minutes, 50 seconds).
1977 August 12 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise flight 4. The space shuttle made its first free flight. - .
Call Sign: Enterprise. Crew: Fullerton,
Haise.
Nation: USA.
Related Persons: Fullerton,
Haise.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
After being carried aloft by a Boeing 747, it was released and made an unassisted landing at Edwards AFB, California. This was part of a series of approach and landing tests carried out at Edwards from February to October. Conduct first free flight, ALT, tail cone on, Edwards (5 minutes, 21 seconds), Enterprise (OV-101), lake bed Runway 17
1977 August 26 - .
- Deliver wings on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 September 7 - .
- Lower forward fuselage on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 September 10 - .
- Deliver external tank MPTA-098 - .
Nation: USA.
Program: STS.
Deliver external tank MPTA-098 (Martin Marietta) to NSTL.
1977 September 13 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise flight 5 - .
Call Sign: Enterprise. Crew: Engle,
Truly.
Nation: USA.
Related Persons: Engle,
Truly.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Second free flight, ALT, tail cone on, Edwards (5 minutes, 28 seconds), Enterprise (OV-101), lake bed Runway 17.
1977 September 23 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise flight 6 - .
Call Sign: Enterprise. Crew: Fullerton,
Haise.
Nation: USA.
Related Persons: Fullerton,
Haise.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Third free flight , ALT, tail cone on, Edwards (5 minutes, 34 seconds), Enterprise (OV-101), lake bed Runway 15.
1977 September 30 - .
- Complete mate vertical stabilizer, STA-099 - .
Nation: USA.
Program: STS.
Complete mate vertical stabilizer, Palmdale (STA-099).
1977 October 12 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise flight 7 - .
Call Sign: Enterprise. Crew: Engle,
Truly.
Nation: USA.
Related Persons: Engle,
Truly.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Fourth free flight, ALT, first tail cone off, Edwards (2 minutes, 34 seconds), Enterprise (OV-101), lake bed Runway 17.
1977 October 26 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Enterprise flight 8 - .
Call Sign: Enterprise. Crew: Fullerton,
Haise.
Nation: USA.
Related Persons: Fullerton,
Haise.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Fifth free flight, ALT, final tail cone off, Edwards (2 minutes, 1 second), Enterprise (OV-101), concrete Runway 04.
1977 October 28 - .
- Lower forward fuselage on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 November 4 - .
- Deliver aft fuselage on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 November 7 - .
- Start final assembly Columbia. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Start final assembly and closeout system installation, Palmdale, Columbia (OV-102).
1977 November 7 - .
- Forward RCS on dock, Palmdale (STA-099) - .
Nation: USA.
Program: STS.
1977 November 15 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- First ferry flight test, Edwards - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
First ferry flight test, Edwards (3 hours, 21 minutes), Enterprise (OV-101).
1977 November 16 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Second ferry flight test, Edwards - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Second ferry flight test, Edwards (4 hours, 17 minutes), Enterprise (OV-101).
1977 November 17 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Third ferry flight test, Edwards - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Third ferry flight test, Edwards (4 hours, 13 minutes), Enterprise (OV-101).
1977 November 18 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Fourth ferry flight test, Edwards - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Fourth ferry flight test, Edwards (3 hours, 37 minutes), Enterprise (OV-101).
1977 December 9 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Complete approach and landing flight tests - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Complete approach and landing flight tests, including ferry flights, Enterprise (OV-101).
1977 December 12 - .
- Start modification of Enterprise for ground vibe tests - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Start removal for mated vertical ground vibration test modification at Edwards, Enterprise (OV-101).
1977 December 13 - .
- Complete propellant load testing, NSTL (MPTA-098) - .
Nation: USA.
Program: STS.
1977 December 31 - .
- Deliver SSME envelope/electrical simulators - .
Nation: USA.
Program: STS.
Deliver SSME envelope/electrical simulators on dock, Palmdale, Columbia (OV-102).
1978 January 10 - .
- Vertical stabilizer on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 January 18 - .
- Second SRB firing, Thiokol - .
Nation: USA.
Program: STS.
1978 February 10 - .
- Complete final assembly, STA-099, Palmdale - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
1978 February 14 - .
- STA-099 on dock, Lockheed facility, Palmdale - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
1978 February 17 - .
- Crew module on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 February 24 - .
- Body flap on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 March 3 - .
- Complete modification for mated vibe tests. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Complete modification for mated vertical ground vibration test, Edwards, Enterprise (OV-101).
1978 March 6 - .
- Upper forward fuselage on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 March 10 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
- Ferry Enterprise from Edwards to Texas. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry Enterprise (OV-101) atop shuttle carrier aircraft from Edwards to Ellington Air Force Base, Texas (approximately 3 hours, 38 min).
1978 March 13 - .
- Ferry Enterprise from Texas to Huntsville - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry Enterprise (OV-101) atop shuttle carrier aircraft from Ellington AFB to Marshall Space Flight Center, Huntsville, Ala..
1978 March 19 - .
- Aft payload bay doors on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 March 31 - .
- ET for vibe tests delivered. - .
Nation: USA.
Program: STS.
External tank for mated vertical ground vibration test delivered..
1978 March 31 - .
- Operational readiness date, SRB refurbishment. - .
Nation: USA.
Program: STS.
Operational readiness date, solid rocket booster refurbishment and subassembly, Kennedy Space Center. Fla..
1978 April 14 - .
- Complete ground vibration test modification - .
Nation: USA.
Program: STS.
Complete ground vibration test modification at MSFC.
1978 April 21 - .
- First static firing, MPTA-098 - .
Nation: USA.
Program: STS.
First static firing, MPTA-098, NSTL (2.5 seconds; stub nozzles).
1978 April 23 - .
- Columbia ready for power-on. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Complete final assembly and closeout system installation, ready for power-on, Columbia (OV-102).
1978 April 24 - .
- Start precombined systems test, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 April 28 - .
- Forward payload bay doors on dock, Columbia. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Forward payload bay doors on dock, Palmdale, Columbia (OV-102).
1978 May 19 - .
- Start forward RCS thermal tests - .
Nation: USA.
Program: STS.
1978 May 26 - .
- Complete forward RCS structure, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 May 26 - .
- Upper forward fuselage mate, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 May 30 - .
- Start Enterprise (OV-101)/ ET mated vibe test - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Start Enterprise (OV-101)/ ET mated vertical ground vibration test, MSFC.
1978 May 31 - .
- Loaded SRBs (2) arrive for mated vibe test - .
Nation: USA.
Program: STS.
Loaded SRBs (2) arrive at MSFC for mated vertical ground vibration test.
1978 June 15 - .
- Third static firing, MPTA-098 - .
Nation: USA.
Program: STS.
Third static firing, MPTA-098, NSTL (50 seconds, 90% thrust).
1978 July 3 - .
- Deliver left-hand OMS/RCS pod to WSTF - .
Nation: USA.
Program: STS.
1978 July 7 - .
- Fourth static firing, MPTA-098 - .
Nation: USA.
Program: STS.
1978 July 7 - .
- Complete mate payload bay doors, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Complete mate forward and aft payload bay doors, Columbia (OV-102).
1978 July 13 - .
- Reconfigure from boost to launch, vibe test - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Reconfigure from boost to launch, mated vertical ground vibration test, MSFC, Enterprise (OV-101).
1978 July 15 - .
- Deliver SRBs empty for mated vertical vibe test - .
Nation: USA.
Program: STS.
Deliver SRBs (2) empty to MSFC for mated vertical ground vibration test.
1978 July 21 - .
- First firing development test, OMS - .
Nation: USA.
Program: STS.
1978 July 31 - .
- Operational readiness date, OPF 1 - .
Nation: USA.
Program: STS.
Operational readiness date, Orbiter Processing Facility Bay 1, shuttle landing facility, and Hypergolic Maintenance Facility, KSC.
1978 August 11 - .
- Complete test preparation, STA-099 - .
Nation: USA.
Program: STS.
1978 August 11 - .
- Complete forward RCS thermal test - .
Nation: USA.
Program: STS.
1978 August 11 - .
- Complete forward RCS, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 August 14 - .
- Start coefficient tests, STA-099 - .
Nation: USA.
Program: STS.
Start coefficient tests, STA-099, Lockheed facility, Palmdale.
1978 August 31 - .
- Operational readiness date, VAB - .
Nation: USA.
Program: STS.
Operational readiness date, Vertical Assembly Building High Bays 3 and 4, KSC.
1978 September 8 - .
- Start OMS left-hand development test - .
Nation: USA.
Program: STS.
1978 September 20 - .
- Start acoustic test, forward RCS - .
Nation: USA.
Program: STS.
1978 September 25 - .
- Start precombined system test, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 September 29 - .
- Complete coefficient tests, STA-099 - .
Nation: USA.
Program: STS.
Complete coefficient tests, STA-099, Lockheed facility, Palmdale.
1978 September 30 - .
- Operational readiness date, crawler. - .
Nation: USA.
Program: STS.
Operational readiness date, mobile launcher platform, KSC.
1978 October 19 - .
- Third SRB firing, Thiokol - .
Nation: USA.
Program: STS.
1978 November 11 - .
- Complete forward RCS acoustic test - .
Nation: USA.
Program: STS.
1978 November 15 - .
- Complete OMS development test - .
Nation: USA.
Program: STS.
1978 November 15 - .
- Complete aft RCS development test - .
Nation: USA.
Program: STS.
1978 November 30 - .
- Operational readiness date, Pad A, KSC - .
Nation: USA.
Program: STS.
1978 December 9 - .
- Start OMS Phase I qualification tests - .
Nation: USA.
Program: STS.
1978 December 15 - .
- Complete precombined system test, Columbia. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1979 January 1 - .
Launch Site:
Vandenberg.
Launch Complex:
Vandenberg.
- Demolition and construction work began at SLC-6 - .
Nation: USA.
Program: STS.
Demolition and construction work began at Space Launch Complex 6 in preparation for the Space Shuttle program..
1979 January 2 - .
- Start fabrication crew module, Challenger - .
Nation: USA.
Program: STS.
Start long-lead fabrication crew module, Challenger (OV-099).
1979 January 30 - .
- Start orbiter/ET/SRB burnout mated vibe tests - .
Nation: USA.
Program: STS.
Start orbiter/ET/SRB burnout mated vertical ground vibration test, MSFC.
1979 January 31 - .
- Start left-hand OMS Phase I qualification test - .
Nation: USA.
Program: STS.
1979 January 31 - .
- Start left-hand OMS Phase I qualification test - .
Nation: USA.
Program: STS.
1979 January 31 - .
- Mission Control Center ready for shuttle. - .
Nation: USA.
Program: STS.
Mission Control Center-Houston/Goldstone ready for operational flight test early operations..
1979 February 3 - .
- Complete combined systems test, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1979 February 16 - .
- Airlock on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1979 February 17 - .
- Fourth SRB firing, Thiokol - .
Nation: USA.
Program: STS.
1979 February 26 - .
- Complete mated vertical ground vibe test program - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Complete mated vertical ground vibration test program at MSFC, Enterprise (OV-101).
1979 February 28 - .
- Operational readiness date, shuttle landing site. - .
Nation: USA.
Program: STS.
Operational readiness date, shuttle landing site, Edwards (Edwards AFB) Runway 23, for first manned orbital flight.
1979 March 5 - .
- Complete postcheckout, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1979 March 8 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
- Columbia (OV-102) transported overland to Edwards. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Columbia (OV-102) transported overland from Palmdale to Edwards (38 miles).
1979 March 9 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle carrier aircraft/Columbia test flight - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Shuttle carrier aircraft/Columbia (OV-102) test flight at NASA Edwards.
1979 March 17 - .
- SSME 2005, flight engine delivered for acceptance - .
Nation: USA.
Program: STS.
Space shuttle main engine 2005, first flight engine delivered to NSTL for acceptance test firings.
1979 March 20 - .
- Ferry flight, Edwards to El Paso - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Edwards to Biggs Army Air Base, El Paso, Texas (3 hours, 20 minutes).
1979 March 22 - .
- Ferry flight El Paso to Kelly AFB - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Biggs Army Air Base to Kelly AFB, San Antonio, Texas (1 hr, 39 min).
1979 March 23 - .
- Ferry flight, Kelly AFB to Eglin AFB, Fla - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Kelly AFB to Eglin AFB, Fla. (2 hours, 12 minutes).
1979 March 24 - .
- Ferry flight, Eglin AFB to KSC - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Eglin AFB to KSC (1 hour, 33 minutes).
1979 March 30 - .
- SSME 2007, flight engine delivered for acceptance - .
Nation: USA.
Program: STS.
Space shuttle main engine 2007, flight engine delivered to NSTL for acceptance test firing.
1979 April 6 - .
- Complete Phase I qualification tests, aft RCS - .
Nation: USA.
Program: STS.
1979 April 10 - .
- Ferry flight, MSFC to KSC - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101) from MSFC to KSC (1 hour, 52 minutes).
1979 April 16 - .
- SSME 2006, flight engine delivered for acceptance - .
Nation: USA.
Program: STS.
Space shuttle main engine 2006, flight engine delivered to NSTL, for acceptance test firing.
1979 April 18 - .
- Complete left-hand OMS/RCS Phase I qualification - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Complete left-hand OMS/RCS Phase I qualification, WSTF May 1 Enterprise (OV-101)/ ET/SRBs mated on mobile launcher platform,.
1979 May 4 - .
- Fifth static firing, MPTA-098, flight nozzles - .
Nation: USA.
Program: STS.
Fifth static firing, MPTA-098, NSTL, flight nozzles 1.5 seconds.
1979 May 10 - .
- Deliver right-hand OMS/RCS for Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Deliver right-hand OMS/RCS from McDonnell Douglas, St. Louis, to KSC, Columbia (OV-102).
1979 May 15 - .
- Deliver left-hand OMS/RCS for Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Deliver left-hand OMS/RCS from McDonnell Douglas to KSC, Columbia (OV-102).
1979 May 30 - .
- ET used for ground vibration to be refurbished. - .
Nation: USA.
Program: STS.
Deliver ET used in mated vertical ground vibration test from MSFC to Martin Marietta for refurbishment.
1979 June 12 - .
- Fifth static firing, MPTA-098, flight nozzles - .
Nation: USA.
Program: STS.
Fifth static firing, MPTA-098, NSTL, flight nozzles (54 seconds, early cutoff, accelerometer filters).
1979 June 15 - .
- First SRB qualification firing - .
Nation: USA.
Program: STS.
First SRB qualification firing, Thiokol, Utah, 122 seconds; nozzle extension severed at end of run as in actual mission; full cycle gimbal.
1979 June 21 - .
- Start assembly crew module, Challenger (OV-099) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
1979 July 2 - .
- Sixth static firing, MPTA-098, flight nozzles. - .
Nation: USA.
Program: STS.
Sixth static firing, MPTA-098, NSTL, flight nozzles (19 seconds, early cutoff-main fuel valve rupture).
1979 July 23 - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
- First test STS stack move from VAB to LC39A - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Enterprise (OV-101), ET, SRBs transported on mobile launcher platform from Launch Complex 39-A to Vehicle Assembly Building at KSC.
1979 August 1 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Start long-lead fabrication crew module, Discovery - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
1979 August 6 - .
- Complete limit test (STA-099) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Complete limit test (STA-099), Lockheed facility, Palmdale.
1979 August 10 - .
- Ferry flight, KSC to Atlanta - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), KSC to Atlanta (1 hour, 55 minutes).
1979 August 11 - .
- Ferry flight, Atlanta to St. Louis - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Atlanta to St. Louis (1 hour, 50 minutes).
1979 August 12 - .
- Ferry flight, St. Louis to Tulsa - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), St. Louis to Tulsa (1 hour, 35 minutes).
1979 August 13 - .
- Ferry flight, Tulsa to Denver - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Tulsa to Denver (2 hours).
1979 August 14 - .
- Ferry flight, Denver to Hill AFB, Ogden, Utah - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Denver to Hill AFB, Ogden, Utah (1 hour, 30 minutes).
1979 August 15 - .
Launch Site:
Vandenberg.
Launch Complex:
Vandenberg.
- Ferry flight, Ogden to Vandenberg AFB - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Ogden to Vandenberg AFB (2 hours, 20 minutes).
1979 August 16 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
- Ferry flight, Vandenberg AFB to Edwards - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Vandenberg AFB to Edwards (1 hour, 10 minutes).
1979 August 23 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
- Enterprise / shuttle carrier demate, Edwards - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
Enterprise (OV-101)/ shuttle carrier demate, Edwards.
1979 August 27 - .
- Start long-lead fabrication crew module, Discovery - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
1979 August 31 - .
- Complete OMS Phase II qualification tests - .
Nation: USA.
Program: STS.
1979 Late - .
- STS-2A (cancelled) - .
Crew: Haise,
Lousma.
Nation: USA.
Related Persons: Haise,
Lousma.
Program: STS.
Flight: STS-2A.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
In late 1977 shuttle orbital missions were due to start in 1979. STS-2, the second shuttle flight, was to have rendezvoused with the Skylab space station and released a small Skylab Reboost Module. This would dock to Skylab and boost the station to a higher orbit for later use. But the shuttle program also was hit with delays and before the first shuttle flew, Skylab burned up in the atmosphere and crashed into the Australian outback on July 11, 1979.
1981 April 12 - .
12:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-1 - .
Call Sign: Columbia. Crew: Crippen,
Young.
Payload: Columbia F01 / DFI. Mass: 4,909 kg (10,822 lb). Nation: USA.
Related Persons: Crippen,
Young.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-1.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 2.26 days. Decay Date: 1981-04-14 . USAF Sat Cat: 12399 . COSPAR: 1981-034A. Apogee: 251 km (155 mi). Perigee: 240 km (140 mi). Inclination: 40.30 deg. Period: 89.40 min. First flight of Space Transportation System (aka Space Shuttle).. Payloads: Development Flight Instrumentation and Aerodynamic Coefficient Identification Package..
- DFI - .
Payload: DFI PLT. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: DFI.
Decay Date: 1981-04-14 . USAF Sat Cat: 12399 . COSPAR: 1981-034xx. Apogee: 272 km (169 mi). Perigee: 260 km (160 mi). Inclination: 40.30 deg. Period: 89.80 min.
1981 April 14 - .
1981 November 12 - .
15:10 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-2 - .
Call Sign: Columbia. Crew: Engle,
Truly.
Payload: Columbia F02 / DFI. Mass: 8,517 kg (18,776 lb). Nation: USA.
Related Persons: Engle,
Truly.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-2.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 2.26 days. Decay Date: 1981-11-14 . USAF Sat Cat: 12953 . COSPAR: 1981-111A. Apogee: 231 km (143 mi). Perigee: 222 km (137 mi). Inclination: 38.00 deg. Period: 89.00 min. Second shuttle test flight. Payloads: Office of Space and Terrestrial Applications (OSTA)-1 experiments, Orbiter Experiments (OEX)..
- DFI - .
Payload: DFI PLT. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: DFI.
Decay Date: 1981-11-14 . USAF Sat Cat: 12953 . COSPAR: 1981-111xx. Apogee: 265 km (164 mi). Perigee: 255 km (158 mi). Inclination: 38.00 deg. Period: 89.70 min.
- OSTA-1 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1981-11-14 . USAF Sat Cat: 12953 . COSPAR: 1981-111xx. Apogee: 265 km (164 mi). Perigee: 255 km (158 mi). Inclination: 38.00 deg. Period: 89.70 min.
1981 November 14 - .
1982 March 22 - .
16:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-3 - .
Call Sign: Columbia. Crew: Fullerton,
Lousma.
Payload: Columbia F03 / OSS-1. Mass: 10,301 kg (22,709 lb). Nation: USA.
Related Persons: Fullerton,
Lousma.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-3.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 8.00 days. Decay Date: 1982-03-30 . USAF Sat Cat: 13106 . COSPAR: 1982-022A. Apogee: 249 km (154 mi). Perigee: 241 km (149 mi). Inclination: 38.00 deg. Period: 89.40 min. Manned two crew. Payloads: Office of Space Science (OSS) experiments, Monodisperse Latex Reactor (MLR), Electro-phoresis Verification Test (EEVT), Plant Lignification Experiment..
- DFI - .
Payload: DFI PLT. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: DFI.
Decay Date: 1982-03-30 . USAF Sat Cat: 13106 . COSPAR: 1982-022xx. Apogee: 245 km (152 mi). Perigee: 220 km (130 mi). Inclination: 38.00 deg. Period: 89.20 min.
- OSS-1 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1982-03-30 . USAF Sat Cat: 13106 . COSPAR: 1982-022xx. Apogee: 245 km (152 mi). Perigee: 220 km (130 mi). Inclination: 38.00 deg. Period: 89.20 min.
1982 March 30 - .
- Landing of STS-3 - .
Return Crew: Fullerton,
Lousma.
Nation: USA.
Related Persons: Fullerton,
Lousma.
Program: STS.
Flight: STS-3.
First and only landing by a shuttle at White Sands, New Mexico, after weather at Edwards did not permit landing there. STS-3 landed at 16:04 GMT..
1982 June 27 - .
15:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-4 - .
Call Sign: Columbia. Crew: Hartsfield,
Mattingly.
Payload: Columbia F04 / DoD 82-1. Mass: 11,109 kg (24,491 lb). Nation: USA.
Related Persons: Hartsfield,
Mattingly.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-4.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 7.05 days. Decay Date: 1982-07-04 . USAF Sat Cat: 13300 . COSPAR: 1982-065A. Apogee: 302 km (187 mi). Perigee: 295 km (183 mi). Inclination: 28.50 deg. Period: 90.30 min.
Manned two crew. Fourth space shuttle test flight. Payloads: Induced Environment Contamination Monitor (IECM), Monodisperse Latex Reactor (MLR), Continuous Flow Electrophoresis System (CFES), Development Flight Instrumentation (DFl), Orbiter Experiments (OEX), first NASA getaway special (GAS), Night/Day Optical Survey of Lightning (NOSL) experiment, Vapor Phase Compression (VPC) freezer heat exchanger dynamics for freezing samples, Aerodynamic Coefficient Identification Package (AClP) experiment.
- DoD 82-1 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: DoD 82-1.
Decay Date: 1982-07-04 . USAF Sat Cat: 13300 . COSPAR: 1982-065xx. Apogee: 319 km (198 mi). Perigee: 306 km (190 mi). Inclination: 28.50 deg. Period: 90.80 min. Cirris cryogenic infrared radiance instrument to obtain spectra of rocket and aircraft target exhausts. Lens cap failed to deploy..
- DFI - .
Payload: DFI PLT. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: DFI.
Decay Date: 1982-07-04 . USAF Sat Cat: 13300 . COSPAR: 1982-065xx. Apogee: 319 km (198 mi). Perigee: 306 km (190 mi). Inclination: 28.50 deg. Period: 90.80 min.
1982 July 4 - .
1982 November 11 - .
12:19 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-5 - .
Call Sign: Columbia. Crew: Allen,
Brand,
Lenoir,
Overmyer.
Payload: Columbia F05 / SBS 3 [PAM-D] / Anik C3 [PAM-D]. Mass: 14,551 kg (32,079 lb). Nation: USA.
Related Persons: Allen,
Brand,
Lenoir,
Overmyer.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-5.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 5.09 days. Decay Date: 1982-11-16 . USAF Sat Cat: 13650 . COSPAR: 1982-110A. Apogee: 317 km (196 mi). Perigee: 294 km (182 mi). Inclination: 28.50 deg. Period: 90.50 min.
Manned four crew. First mission to deploy commercial communications satellites (SBS 3, Anik C3). Payloads: : Satellite Business Systems (SBS)-C with Payload Assist ; (PAM)-D; Telesat-E (Canadian communications satellite) with PAM-D. Monodisperse Latex Reactor (MLR), Continuous Flow Electrophoresis System (CFES), three getaway specials (GAS), Student experiments, GLOW experiment, Vestibular experiment, Oxygen Interaction With Materials experiment.
- DFI - .
Payload: DFI PLT. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: DFI.
Decay Date: 1982-11-16 . USAF Sat Cat: 13650 . COSPAR: 1982-110xx. Apogee: 287 km (178 mi). Perigee: 277 km (172 mi). Inclination: 28.50 deg. Period: 90.20 min.
1982 November 16 - .
1983 April 4 - .
18:30 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-6 - .
Call Sign: Challenger. Crew: Bobko,
Musgrave,
Peterson,
Weitz.
Payload: Challenger F01 / TDRS 1 [IUS]. Mass: 21,305 kg (46,969 lb). Nation: USA.
Related Persons: Bobko,
Musgrave,
Peterson,
Weitz.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-6.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 5.02 days. Decay Date: 1983-04-09 . USAF Sat Cat: 13968 . COSPAR: 1983-026A. Apogee: 295 km (183 mi). Perigee: 288 km (178 mi). Inclination: 28.50 deg. Period: 90.40 min.
Manned four crew. First flight of space shuttle Challenger; deployed TDRSS. Payloads: Deployment of Tracking and Data Relay Satellite (TDRS)-A with Inertial Upper Stage (lUS)-2, Continuous Flow Electrophoresis System (CFES), Monodisperse Latex Reactor (MLR), Night/Day Optical Survey of Lightning (NOSL) experiment, three getaway specials (GAS).
- TDRS 1 - .
Payload: TDRS A. Mass: 2,268 kg (5,000 lb). Nation: USA.
Agency: NASA Greenbelt.
Program: STS.
Class: Communications.
Type: Civilian communications satellite. Spacecraft: TDRS.
USAF Sat Cat: 13969 . COSPAR: 1983-026B. Apogee: 35,976 km (22,354 mi). Perigee: 35,835 km (22,266 mi). Inclination: 7.40 deg. Period: 1,442.20 min.
Element of satellite communications network, deployed from STS-6 5 April 1983. Spacecraft engaged in practical applications and uses of space technology such as weather or communication (US Cat C). Positioned in geosynchronous orbit at 67 deg W in 1983; 41 deg W in 1983-1989; 79 deg W in 1989-1990; 170 deg W in 1990-1993; 85 deg E in 1994-1995; 49 deg W in 1996-on. As of 5 September 2001 located at 49.36 deg W drifting at 0.010 deg E per day. As of 2007 Mar 9 located at 48.98W drifting at 0.029W degrees per day.
1983 April 8 - .
21:05 GMT - .
1983 April 9 - .
1983 June 18 - .
11:33 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-7 - .
Call Sign: Challenger. Crew: Crippen,
Fabian,
Hauck,
Ride,
Thagard.
Payload: Challenger F02 / OSTA-2. Mass: 16,839 kg (37,123 lb). Nation: USA.
Related Persons: Crippen,
Fabian,
Hauck,
Ride,
Thagard.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-7.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 6.10 days. Decay Date: 1983-06-24 . USAF Sat Cat: 14132 . COSPAR: 1983-059A. Apogee: 307 km (190 mi). Perigee: 299 km (185 mi). Inclination: 28.30 deg. Period: 90.60 min.
Manned five crew. Deployed Anik C2, Palapa B1; deployed and retrieved SPAS platform. Payloads: Office of Space and Terrestrial Applications (OSTA)-2 experiments, deployment of PALAPA-B1 communications satellite for Indonesia with Payload Assist Module (PAM)-D and Telesat-F communications satellite for Canada with PAM-D, German Shuttle Pallet Satellite (SPAS)-01, seven getaway specials (GAS), Monodisperse Latex Reactor (MLR), Continuous Flow Electrophoresis System (CFES).
- OSTA-2 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1983-06-24 . USAF Sat Cat: 14132 . COSPAR: 1983-059xx. Apogee: 295 km (183 mi). Perigee: 289 km (179 mi). Inclination: 28.50 deg. Period: 90.40 min.
1983 June 24 - .
1983 August 30 - .
06:32 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-8 - .
Call Sign: Challenger. Crew: Bluford,
Brandenstein,
Gardner,
Thornton, Bill,
Truly.
Payload: Challenger F03 / PFTA. Mass: 13,642 kg (30,075 lb). Nation: USA.
Related Persons: Bluford,
Brandenstein,
Gardner,
Thornton, Bill,
Truly.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-8.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 6.05 days. Decay Date: 1983-09-05 . USAF Sat Cat: 14312 . COSPAR: 1983-089A. Apogee: 313 km (194 mi). Perigee: 306 km (190 mi). Inclination: 28.50 deg. Period: 90.70 min.
First night launch and night landing. Deployed Insat 1B. Payloads: Deployment of INSAT (lndia communica-tion satellite) with Payload Assist Module (PAM)-D, Payload Flight Test Article (PFTA)/ Payload Deployment Retrieval System (PDRS), Continuous Flow Electrophoresis (CFES), biomedical experiments. 250,000 express mail envelopes with special cachet for U.S. Postal Service were carried for a first-day cover.
- PFTA - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: PFTA.
Decay Date: 1983-09-05 . USAF Sat Cat: 14312 . COSPAR: 1983-089xx. Apogee: 223 km (138 mi). Perigee: 216 km (134 mi). Inclination: 28.50 deg. Period: 88.90 min.
- DFI/USPS - .
Payload: DFI PLT. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: DFI.
Decay Date: 1983-09-05 . USAF Sat Cat: 14312 . COSPAR: 1983-089xx. Apogee: 223 km (138 mi). Perigee: 216 km (134 mi). Inclination: 28.50 deg. Period: 88.90 min.
1983 September 5 - .
- Landing of STS-8 - .
Return Crew: Bluford,
Brandenstein,
Gardner,
Thornton, Bill,
Truly.
Nation: USA.
Related Persons: Bluford,
Brandenstein,
Gardner,
Thornton, Bill,
Truly.
Program: STS.
Flight: STS-8.
STS-8 landed at 07:40 GMT. .
1983 November - .
1983 November 8 - .
Launch Site:
Vandenberg.
Launch Complex:
Vandenberg.
- Space Shuttle orbiter Discovery at Vandenberg AFB - .
Nation: USA.
Program: STS.
Space Shuttle orbiter Discovery at Vandenberg AFB for a series of fit checks at the orbiter lifting frame..
1983 November 28 - .
16:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-9 - .
Call Sign: Columbia. Crew: Garriott,
Lichtenberg,
Merbold,
Parker,
Shaw,
Young.
Payload: Columbia F06 / Spacelab 1 Pallet. Mass: 15,088 kg (33,263 lb). Nation: USA.
Related Persons: Garriott,
Lichtenberg,
Merbold,
Parker,
Shaw,
Young.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-9.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 10.32 days. Decay Date: 1983-12-08 . USAF Sat Cat: 14523 . COSPAR: 1983-116A. Apogee: 254 km (157 mi). Perigee: 241 km (149 mi). Inclination: 57.00 deg. Period: 89.50 min.
Carried ESA Spacelab. Payloads: Payload: Spacelab-1 experiments, habitable Spacelab and pallet, carried 71 experiments. The six-man crew was divided into two 12-hour-day red and blue teams to operate experiments. First high-inclination orbit of 57 degrees.
1984-1986 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Columbia overhauled at Palmdale. - .
Nation: USA.
Program: STS.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
The ejection seats and flight instrumentation used for the first manned shuttle flights were removed. Head-up display and GPS avionics were installed. Orbiter 5.4 structural modifications were made; the disconnect valves, thermal protection system, and brakes were brought up to date. Provisions were made for use of the Manned Maneuvering Unit and 231 Master Change Requests were implemented.
1984 February 3 - .
13:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-41-B - .
Call Sign: Challenger. Crew: Brand,
Gibson,
McCandless,
McNair,
Stewart.
Payload: Challenger F04 / SPAS 1A. Mass: 15,362 kg (33,867 lb). Nation: USA.
Related Persons: Brand,
Gibson,
McCandless,
McNair,
Stewart.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-41-B.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 7.97 days. Decay Date: 1984-02-11 . USAF Sat Cat: 14681 . COSPAR: 1984-011A. Apogee: 316 km (196 mi). Perigee: 307 km (190 mi). Inclination: 28.50 deg. Period: 90.80 min.
Manned five crew. Deployed Westar 6, Palapa B2; tested Manned Maneuvering Unit (MMU). Payloads: PALAPA-B2 (Indonesian communications satellite) with Payload Assist Module (PAM)-D and WESTAR (Western Union communications satellite)-Vl with PAM-D. Both satellites were deployed but the PAM-D in each satellite failed to ignite, leaving both satellites in earth orbit. Both satellites were retrieved and returned to earth for renovation on the STS-51-A mission. The manned maneuvering unit (MMU) was tested with extravehicular astronauts as free flyers without tethers as far as 98 m from the orbiter. Shuttle Pallet Satellite (SPAS)-01 experiments, Monodisperse Latex Reactor (MLR), Isoelectric Focusing Experiment (lEF), Acoustic Containerless Experiment System (ACES), Cinema 360 cameras, five getaway specials (GAS), Aerodynamic Coefficient Identification (ACIP)/High Resolution Accelerom-eter Package (HIRAP).
1984 February 7 - .
1984 February 9 - .
1984 February 11 - .
1984 March - .
1984 April 6 - .
13:58 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-41-C - .
Call Sign: Challenger. Crew: Crippen,
Hart,
Nelson,
Scobee,
van Hoften.
Payload: Challenger F05 / LDEF 1 / MMU 3. Mass: 17,357 kg (38,265 lb). Nation: USA.
Related Persons: Crippen,
Hart,
Nelson,
Scobee,
van Hoften.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-41-C.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 6.99 days. Decay Date: 1984-04-13 . USAF Sat Cat: 14897 . COSPAR: 1984-034A. Apogee: 468 km (290 mi). Perigee: 222 km (137 mi). Inclination: 28.50 deg. Period: 91.40 min.
Manned five crew. First repair on orbit of a satellite, Solar Maximum Mission, by James van Hoften and George Nelson. Deployed LDEF. Payloads:Solar Maximum Mission (SMM) repair, manned maneuvering unit (MMU) satellite support, deployment of Long-Duration Exposure Facility (LDEF) in earth orbit free drift. LDEF contained 57 experiments and weighed about 10,000 kg. Cinema 360 and IMAX 70-mm cameras.
- MMU 2 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft: Shuttle MMU.
Decay Date: 1984-04-13 . USAF Sat Cat: 14897 . COSPAR: 1984-034xx. Apogee: 496 km (308 mi). Perigee: 494 km (306 mi). Inclination: 28.50 deg. Period: 94.50 min.
- MMU 3 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft: Shuttle MMU.
Decay Date: 1984-04-13 . USAF Sat Cat: 14897 . COSPAR: 1984-034xx. Apogee: 496 km (308 mi). Perigee: 494 km (306 mi). Inclination: 28.50 deg. Period: 94.50 min.
- SMRM-FSS - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: FSS.
Decay Date: 1984-04-13 . USAF Sat Cat: 14897 . COSPAR: 1984-034xx. Apogee: 496 km (308 mi). Perigee: 494 km (306 mi). Inclination: 28.50 deg. Period: 94.50 min.
1984 April 8 - .
14:18 GMT - .
1984 April 11 - .
08:58 GMT - .
1984 April 13 - .
1984 June 26 - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Discovery Pad Abort - .
Nation: USA.
Program: STS.
Flight: STS-41-D.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
The countdown for the second launch attempt for Discovery's maiden flight ended at T-
4 seconds when the orbiter's computers detected a sluggish valve in main engine #3.
The main engine was replaced and Discovery was finally launched on August 30, 1984..
1984 July - .
1984 August - .
- STS-41-F (cancelled) - .
Crew: Bobko,
Griggs,
Hoffman,
Seddon,
Williams, Donald.
Payload: Communications satellites. Nation: USA.
Related Persons: Bobko,
Griggs,
Hoffman,
Seddon,
Williams, Donald.
Program: STS.
Flight: STS-41-F.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Planned shuttle mission for deployment of commercial communications satellites. Cancelled due to payload delays..
1984 August 30 - .
12:41 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-41-D - .
Call Sign: Discovery. Crew: Coats,
Hartsfield,
Hawley,
Mullane,
Resnik,
Walker.
Payload: Discovery F01 / SBS 4[PAM-D] / Telstar 302[PAM-D]. Mass: 21,552 kg (47,514 lb). Nation: USA.
Related Persons: Coats,
Hartsfield,
Hawley,
Mullane,
Resnik,
Walker.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-41-D.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 6.04 days. Decay Date: 1984-09-05 . USAF Sat Cat: 15234 . COSPAR: 1984-093A. Apogee: 307 km (190 mi). Perigee: 300 km (180 mi). Inclination: 28.50 deg. Period: 90.60 min.
Manned six crew. First flight of space shuttle Discovery; deployed SBS 4, Leasat 1, Telstar 3C. Payloads: Satellite Business System (SBS)-D commu-nications satellite with Payload Assist Module (PAM)-D deployment, Syncom IV-2 communica-tions satellite with its unique stage deployment, Telstar (American Telephone and Telegraph) 3-C with PAM-D deployment, Office of Aeronautics and Space Technology (OAST)-1 experiments. Deployment and restowing of large solar array. Continuous Flow Electrophoresis (CFES). IMAX camera.
- OAST 1 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: OAST.
Decay Date: 1984-09-05 . USAF Sat Cat: 15234 . COSPAR: 1984-093xx. Apogee: 297 km (184 mi). Perigee: 294 km (182 mi). Inclination: 28.50 deg. Period: 90.40 min.
1984 September - .
1984 September 5 - .
- Landing of STS-41-D - .
Return Crew: Coats,
Hartsfield,
Hawley,
Mullane,
Resnik,
Walker.
Nation: USA.
Related Persons: Coats,
Hartsfield,
Hawley,
Mullane,
Resnik,
Walker.
Program: STS.
Flight: STS-41-D.
STS-41-D landed at 13:39 GMT. .
1984 October 5 - .
11:03 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-41-G - .
Call Sign: Challenger. Crew: Crippen,
Garneau,
Leestma,
McBride,
Ride,
Scully-Power,
Sullivan.
Payload: Challenger F06 / ERBS / LFC / ORS. Mass: 10,643 kg (23,463 lb). Nation: USA.
Related Persons: Crippen,
Garneau,
Leestma,
McBride,
Ride,
Scully-Power,
Sullivan.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-41-G.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 8.22 days. Decay Date: 1984-10-13 . USAF Sat Cat: 15353 . COSPAR: 1984-108A. Apogee: 390 km (240 mi). Perigee: 350 km (210 mi). Inclination: 51.70 deg. Period: 92.00 min.
Manned seven crew. Deployed ERBS; performed high resolution Earth imagery. Payloads: Earth Radiation Budget Satellite (ERBS) deployment, Office of Space and Terrestrial Applications (OSTA)-3 experiments, Large Format Camera (LFC). First use of Orbital Refueling System (ORS) with extravehicular activity (EVA) astronauts, IMAX camera.
- OSTA-3 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1984-10-13 . USAF Sat Cat: 15353 . COSPAR: 1984-108xx. Apogee: 227 km (141 mi). Perigee: 214 km (132 mi). Inclination: 57.00 deg. Period: 88.90 min.
- LFC/ORS - .
Payload: MPESS. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: LFC/ORS.
Decay Date: 1984-10-13 . USAF Sat Cat: 15353 . COSPAR: 1984-108xx. Apogee: 227 km (141 mi). Perigee: 214 km (132 mi). Inclination: 57.00 deg. Period: 88.90 min. Larger Format Camera/ Orbital Refueling System payload carried in shuttle bay..
1984 October 11 - .
1984 October 13 - .
- Landing of STS-41-G - .
Return Crew: Crippen,
Garneau,
Leestma,
McBride,
Ride,
Scully-Power,
Sullivan.
Nation: USA.
Related Persons: Crippen,
Garneau,
Leestma,
McBride,
Ride,
Scully-Power,
Sullivan.
Program: STS.
Flight: STS-41-G.
STS-41-G landed at 16:11 GMT. .
1984 November 8 - .
12:15 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-A - .
Call Sign: Discovery. Crew: Allen,
Fisher,
Gardner,
Hauck,
Walker, Dave.
Payload: Discovery F02 / PLT. Mass: 20,550 kg (45,300 lb). Nation: USA.
Related Persons: Allen,
Fisher,
Gardner,
Hauck,
Walker, Dave.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-A.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 7.99 days. Decay Date: 1984-11-16 . USAF Sat Cat: 15382 . COSPAR: 1984-113A. Apogee: 297 km (184 mi). Perigee: 289 km (179 mi). Inclination: 28.40 deg. Period: 90.40 min.
Manned five crew. First retrieval of two satellites (PALAPA B-2 and WESTAR Vl) for return to earth. Deployed Anik D2, Leasat 2; recovered Westar 6, Palapa B2. Payloads: Telesat (Canada communications satellite)-H with Payload Assist Module (PAM)-D deploy-ment, Syncom IV-1 communications satellite deployment with its unique stage, retrieval of PALAPA B-2 and WESTAR VI communications satellites with PAM-D which failed to ignite on the STS-41-B mission. Manned maneuvering unit (MMU) used for retrieval. Diffusive Mixing of Organic Solutions (DMOS) experiment.
1984 November 12 - .
13:25 GMT - .
1984 November 14 - .
1984 November 16 - .
Launch Site:
Vandenberg.
Launch Complex:
Vandenberg.
- The Space Shuttle orbiter Enterprise arrives - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Enterprise.
The Space Shuttle orbiter Enterprise arrived at Vandenberg AFB for a series of facility verification tests..
1984 November 16 - .
- Landing of STS-51-A - .
Return Crew: Allen,
Fisher,
Gardner,
Hauck,
Walker, Dave.
Nation: USA.
Related Persons: Allen,
Fisher,
Gardner,
Hauck,
Walker, Dave.
Program: STS.
Flight: STS-51-A.
STS-51-A landed at 12:14 GMT. .
1985 January 24 - .
19:50 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-C - .
Call Sign: Discovery. Crew: Buchli,
Mattingly,
Onizuka,
Payton,
Shriver.
Payload: Discovery F03 / Magnum 1 [IUS]. Mass: 116,884 kg (257,685 lb). Nation: USA.
Related Persons: Buchli,
Mattingly,
Onizuka,
Payton,
Shriver.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-C.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 3.06 days. Decay Date: 1985-01-27 . USAF Sat Cat: 15496 . COSPAR: 1985-010A. Apogee: 341 km (211 mi). Perigee: 332 km (206 mi). Inclination: 28.40 deg. Period: 91.30 min.
Manned five crew. Deployed USA 8 (Aquacade ELINT spacecraft). Orbits of Earth: 48. Landed at: Runway 15 at Kennedy Space Center, Florida. Landing Speed: 342 kph. Touchdown miss distance: 839.00 m. Landing Rollout: 2,240.00 m. Payloads: Department of Defence classified payloads.
1985 January 27 - .
1985 March - .
- STS-51-E (cancelled) - .
Crew: Baudry,
Bobko,
Garn,
Griggs,
Hoffman,
Seddon,
Williams, Donald.
Payload: TDRS/IUS. Nation: USA.
Related Persons: Baudry,
Bobko,
Garn,
Griggs,
Hoffman,
Seddon,
Williams, Donald.
Program: STS.
Flight: STS-51-E.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Planned TDRS/IUS deployment shuttle mission. Cancelled due to IUS failure..
1985 April - .
1985 April 12 - .
13:59 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-D - .
Call Sign: Discovery. Crew: Bobko,
Garn,
Griggs,
Hoffman,
Seddon,
Walker,
Williams, Donald.
Payload: Discovery F04 / Anik C1[PAM-D] / Syncom-4 3 /Orbus. Mass: 16,249 kg (35,822 lb). Nation: USA.
Related Persons: Bobko,
Garn,
Griggs,
Hoffman,
Seddon,
Walker,
Williams, Donald.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-D.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 7.00 days. Decay Date: 1985-04-19 . USAF Sat Cat: 15641 . COSPAR: 1985-028A. Apogee: 535 km (332 mi). Perigee: 445 km (276 mi). Inclination: 28.50 deg. Period: 94.40 min.
Manned seven crew. Payloads: Telesat (Canada communications satellite)-I with Payload Assist Module (PAM)-D deployment, Syncom IV-3 communications satellite deploy-ment with its unique stage (unique stage failed to ignite), Continuous Flow Electrophoresis (CFES), Phase Partitioning Experiment (PPE), student experiments, two getaway specials (GAS) Informal science studies (Toys in Space).
1985 April 16 - .
1985 April 19 - .
- Landing of STS-51-D - .
Return Crew: Bobko,
Garn,
Griggs,
Hoffman,
Seddon,
Walker,
Williams, Donald.
Nation: USA.
Related Persons: Bobko,
Garn,
Griggs,
Hoffman,
Seddon,
Walker,
Williams, Donald.
Program: STS.
Flight: STS-51-D.
STS-51-D landed at 13:50 GMT. .
1985 April 29 - .
16:02 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-B - .
Call Sign: Challenger. Crew: Gregory,
Lind,
Overmyer,
Thagard,
Thornton, Bill,
van den Berg, Lodewijk,
Wang.
Payload: Challenger F07 / SL 3 MPESS. Mass: 14,245 kg (31,404 lb). Nation: USA.
Related Persons: Gregory,
Lind,
Overmyer,
Thagard,
Thornton, Bill,
van den Berg, Lodewijk,
Wang.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-B.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 7.01 days. Decay Date: 1985-05-06 . USAF Sat Cat: 15665 . COSPAR: 1985-034A. Apogee: 353 km (219 mi). Perigee: 346 km (214 mi). Inclination: 57.00 deg. Period: 91.50 min.
Manned seven crew. Deployed Nusat; carried Spacelab 3. Payloads: Spacelab-3 experiments, habitable Spacelab and mission peculiar experiment support structure. The experiments represented a total of five different disciplines: materials processing in space, environmental observa-tions, life science, astrophysics, and technology experiments. Two getaway specials (GAS). The flight crew was split into gold and silver shifts working 12-hour days during the flight.
- SL 3 MPESS - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1985-05-06 . USAF Sat Cat: 15665 . COSPAR: 1985-034xx. Apogee: 359 km (223 mi). Perigee: 346 km (214 mi). Inclination: 57.00 deg. Period: 91.60 min.
- GLOMR - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft: GLOMR.
Decay Date: 1985-05-06 . USAF Sat Cat: 15665 . COSPAR: 1985-034xx. Apogee: 359 km (223 mi). Perigee: 346 km (214 mi). Inclination: 57.00 deg. Period: 91.60 min.
1985 June 17 - .
11:33 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-G - .
Call Sign: Discovery. Crew: Al-Saud,
Baudry,
Brandenstein,
Creighton,
Fabian,
Lucid,
Nagel.
Payload: Discovery F05 / Morelos 1[PAM-D] / Telstar 303. Mass: 20,174 kg (44,476 lb). Nation: USA.
Related Persons: Al-Saud,
Baudry,
Brandenstein,
Creighton,
Fabian,
Lucid,
Nagel.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-G.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 7.07 days. Decay Date: 1985-06-24 . USAF Sat Cat: 15823 . COSPAR: 1985-048A. Apogee: 369 km (229 mi). Perigee: 358 km (222 mi). Inclination: 28.50 deg. Period: 91.80 min.
Deployed and retrieved Spartan 1; launched Morelos 1, Arabsat 1B, Telstar 3D.Payloads: Shuttle Pointed Autono-mous Research Tool for Astronomy (SPARTAN)-1; Automated Directional Solidification Furnace (ADSF); High Precision Tracking Experiment (HPTE); Orbiter Experiments (OEX); French Echocardiograph Experiment (FEE) and French Pocket Experiment (FPE).
1985 June 24 - .
- Landing of STS-51-G - .
Return Crew: Al-Saud,
Baudry,
Brandenstein,
Creighton,
Fabian,
Lucid,
Nagel.
Nation: USA.
Related Persons: Al-Saud,
Baudry,
Brandenstein,
Creighton,
Fabian,
Lucid,
Nagel.
Program: STS.
Flight: STS-51-G.
STS-51-G landed at 13:10 GMT. .
1985 July - .
1985 July 12 - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Challenger Pad Abort - .
Nation: USA.
Program: STS.
Flight: STS-51-F.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
The countdown for Challenger's launch was halted at T-3 seconds when on-board
computers detected a problem with a coolant valve on main engine #2. The valve was
replaced and Challenger was launched on July 29, 1985..
1985 July 29 - .
21:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-F - .
Call Sign: Challenger. Crew: Acton,
Bartoe,
Bridges,
England,
Fullerton,
Henize,
Musgrave.
Payload: Challenger F08 / PDP / Spacelab 2 PLT. Mass: 15,603 kg (34,398 lb). Nation: USA.
Related Persons: Acton,
Bartoe,
Bridges,
England,
Fullerton,
Henize,
Musgrave.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-F.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 7.95 days. Decay Date: 1985-08-06 . USAF Sat Cat: 15925 . COSPAR: 1985-063A. Apogee: 337 km (209 mi). Perigee: 203 km (126 mi). Inclination: 49.50 deg. Period: 89.90 min.
Manned seven crew. At 5 minutes, 45 seconds into ascent the number one engine shut down prematurely due to a a sensor problem and an abort to orbit was declared. Despite the anomaly the mission continued. Launched PDP; carried Spacelab 2. Payloads: Spacelab-2 with 13 experiments, Shuttle Amateur Radio Experiment (SAREX), Protein Crystal Growth (PCG). The flight crew was divided into a red and blue team. Each team worked 12-hour shifts for 24-hour-a-day operation.
- CRNE - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: CRNE.
Decay Date: 1985-08-06 . USAF Sat Cat: 15925 . COSPAR: 1985-063xx. Apogee: 328 km (203 mi). Perigee: 300 km (180 mi). Inclination: 49.50 deg. Period: 90.80 min.
1985 August 27 - .
10:58 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-I - .
Call Sign: Discovery. Crew: Covey,
Engle,
Fisher, William,
Lounge,
van Hoften.
Payload: Discovery F06 / Syncom-4 4 [Orbus-7S] / Aussat A1. Mass: 19,952 kg (43,986 lb). Nation: USA.
Related Persons: Covey,
Engle,
Fisher, William,
Lounge,
van Hoften.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-I.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 7.10 days. Decay Date: 1985-09-03 . USAF Sat Cat: 15992 . COSPAR: 1985-076A. Apogee: 364 km (226 mi). Perigee: 351 km (218 mi). Inclination: 28.50 deg. Period: 91.70 min.
Manned five crew. Launched Aussat 1, ASC 1, Leasat 4; repaired Leasat 3. Payloads: Deploy ASC (American Satellite Company)-1 with Payload Assist Modue (PAM)-D. Deploy AUSSAT (Australian communications satellite)-1 with PAM-D. Deploy Syncom IV-4 communications satellite with its unique stage. Retrieve Leasat-3 communications satellite, repair and deploy by extravehicular activity (EVA) astronauts. Physical Vapor Transport Organic Solids (PVTOS) experiment.
1985 August 31 - .
1985 September 1 - .
1985 September 3 - .
- Landing of STS-51-I - .
Return Crew: Covey,
Engle,
Fisher, William,
Lounge,
van Hoften.
Nation: USA.
Related Persons: Covey,
Engle,
Fisher, William,
Lounge,
van Hoften.
Program: STS.
Flight: STS-51-I.
STS-51-I landed at 13:34 GMT. .
1985 October 3 - .
15:15 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-J - .
Call Sign: Atlantis. Crew: Bobko,
Grabe,
Hilmers,
Pailes,
Stewart.
Payload: Atlantis F01 / DSCS-3 2 / DSCS-3 3 [IUS]. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Bobko,
Grabe,
Hilmers,
Pailes,
Stewart.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-J.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 4.07 days. Decay Date: 1985-10-07 . USAF Sat Cat: 16115 . COSPAR: 1985-092A. Apogee: 486 km (301 mi). Perigee: 476 km (295 mi). Inclination: 28.50 deg. Period: 94.20 min.
Manned five crew. Atlantis (first flight); deployed USA 11, USA 12. Reusable space transportation system.
Orbits of Earth: 63. Landed at: Runway 23 dry lake bed at Edwards Air Force Base, . Touchdown miss distance: 754.00 m. Landing Rollout: 2,455.00 m. Payloads: Classified DoD Mission - Record altitude (as of 5/93).
1985 October 7 - .
1985 October 15 - .
Launch Site:
Vandenberg.
Launch Complex:
Vandenberg.
- SLC-6 declared operational for shuttle flights - .
Nation: USA.
Program: STS.
Space Launch Complex 6, site of future Space Shuttle operations, declared operational. However, much additional work and testing required..
1985 October 30 - .
17:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- USS - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: USS.
Decay Date: 1985-11-06 . USAF Sat Cat: 16230 . COSPAR: 1985-104xx. Apogee: 332 km (206 mi). Perigee: 322 km (200 mi). Inclination: 57.00 deg. Period: 91.10 min.
1985 November 1 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-H (cancelled) - .
Payload: EOM-1. Nation: USA.
Program: STS.
Flight: STS-51-H.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Planned EOM-1/2 shuttle mission. Cancelled due to payload delays..
1985 November 27 - .
00:29 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-61-B - .
Call Sign: Atlantis. Crew: Cleave,
Neri Vela,
O Connor,
Ross,
Shaw,
Spring,
Walker.
Payload: Atlantis F02 / EASE / ACCESS. Mass: 21,791 kg (48,040 lb). Nation: USA.
Related Persons: Cleave,
Neri Vela,
O Connor,
Ross,
Shaw,
Spring,
Walker.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-61-B.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 6.88 days. Decay Date: 1985-12-03 . USAF Sat Cat: 16273 . COSPAR: 1985-109A. Apogee: 370 km (220 mi). Perigee: 361 km (224 mi). Inclination: 28.50 deg. Period: 91.90 min.
Manned seven crew. Deployed Morelos 2, Aussat 2, Satcom K2, OEX. Payloads: Deploy SATCOM (RCA-Satellite Communi-cations) Ku-2 with Payload Assist Module (PAM)-D II. Deploy Morelos (Mexico communications satellite)-B with PAM-D. Deploy AUSSAT (Australian communications satellite)-2 with PAM-D. EASE/ACCESS (Assembly of Structures Assembly Concept for Construction of Erectable Space Structures) by extravehicular activity (EVA) astronauts, Continuous Flow Electrophore-sis System (CFES), Diffusive Mixing of Organic Solutions (DMOS), IMAX camera, one getaway special (GAS), Linhof camera and Hasseblad camera.
- OEX Target - .
Payload: Atlantis F2 / Aussat A2 [PAM-D] / Morelos 2 [PAM-D. Mass: 16 kg (35 lb). Nation: USA.
Agency: NASA Houston.
Program: STS.
Class: Technology.
Type: Technology satellite. Spacecraft: OEX Target.
Decay Date: 1987-03-02 . USAF Sat Cat: 16277 . COSPAR: 1985-109E. Apogee: 386 km (239 mi). Perigee: 373 km (231 mi). Inclination: 28.40 deg. Period: 92.10 min. Released from STS 61B 11/30/85; shuttle autopilot software test target. Spacecraft engaged in practical applications and uses of space technology such as weather or communication (US Cat C). .
- EASE/ACCESS - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: EASE/ACCESS.
Decay Date: 1985-12-03 . USAF Sat Cat: 16273 . COSPAR: 1985-109xx. Apogee: 385 km (239 mi). Perigee: 323 km (200 mi). Inclination: 28.50 deg. Period: 91.60 min.
1985 November 29 - .
- EVA STS-61-B-1 - .
Crew: Ross,
Spring.
EVA Duration: 0.23 days. Nation: USA.
Related Persons: Ross,
Spring.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-61-B.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Began EASE/ACCESS (Assembly of Structures / Assembly Concept for Construction of Erectable Space Structures) structural assembly experiments..
1985 December 1 - .
- EVA STS-61-B-2 - .
Crew: Ross,
Spring.
EVA Duration: 0.28 days. Nation: USA.
Related Persons: Ross,
Spring.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-61-B.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Completed EASE/ACCESS (Assembly of Structures / Assembly Concept for Construction of Erectable Space Structures) structural assembly experiments..
1985 December 3 - .
- Landing of STS-61-B - .
Return Crew: Cleave,
Neri Vela,
O Connor,
Ross,
Shaw,
Spring,
Walker.
Nation: USA.
Related Persons: Cleave,
Neri Vela,
O Connor,
Ross,
Shaw,
Spring,
Walker.
Program: STS.
Flight: STS-61-B.
STS-61-B landed at 21:33 GMT. .
1986 January 12 - .
11:55 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-61-C - .
Call Sign: Columbia. Crew: Bolden,
Cenker,
Chang-Diaz,
Gibson,
Hawley,
Nelson,
Nelson, Bill.
Payload: Columbia F07 Satcom-K 1 [PAM-D2]. Mass: 14,724 kg (32,460 lb). Nation: USA.
Related Persons: Bolden,
Cenker,
Chang-Diaz,
Gibson,
Hawley,
Nelson,
Nelson, Bill.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-61-C.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 6.09 days. Decay Date: 1986-01-18 . USAF Sat Cat: 16481 . COSPAR: 1986-003A. Apogee: 338 km (210 mi). Perigee: 331 km (205 mi). Inclination: 28.50 deg. Period: 91.20 min.
Manned seven crew. Launched Satcom K1. Payloads: Deploy SATCOM (RCA-Satellite Communi-cations) Ku-1 with Payload Assist Module (PAM)-D II. Materials Science Laboratory, Comet Halley Active Monitoring Experiment (CHAMP), Hitchhiker (HH) Goddard (G)-1, thirteen getaway specials (GAS), student experiment, Initial Blood Storage Equipment (lBSE), Characterization of Space Motion Sickness (SMS).
- MSL-2 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: MSL-2.
Decay Date: 1986-01-18 . USAF Sat Cat: 16481 . COSPAR: 1986-003xx. Apogee: 347 km (215 mi). Perigee: 322 km (200 mi). Inclination: 28.50 deg. Period: 91.20 min.
The Material Science Laboratory was a carrier system designed to utilize the residual space of the Shuttle cargo bay. Based on the multi-purpose experiment support structure (MPESS) carrier, it offered a full complement of power, data, and thermal control services to payloads mounted on it.
- GBA-1 - .
Payload: GAS Bridge. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: GBA.
Decay Date: 1986-01-18 . USAF Sat Cat: 16481 . COSPAR: 1986-003xx. Apogee: 347 km (215 mi). Perigee: 322 km (200 mi). Inclination: 28.50 deg. Period: 91.20 min.
1986 January 18 - .
- Landing of STS-61-C - .
Return Crew: Bolden,
Cenker,
Chang-Diaz,
Gibson,
Hawley,
Nelson,
Nelson, Bill.
Nation: USA.
Related Persons: Bolden,
Cenker,
Chang-Diaz,
Gibson,
Hawley,
Nelson,
Nelson, Bill.
Program: STS.
Flight: STS-61-C.
STS-61-C landed at 13:59 GMT. .
1986 January 28 - .
16:38 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
FAILURE: Seal on SRB failed, allowed hot gas to burn through External Tank..
Failed Stage: 0.
- STS-51-L - .
Call Sign: Challenger. Crew: Jarvis,
McAuliffe,
McNair,
Onizuka,
Resnik,
Scobee,
Smith.
Payload: Challenger F10 / TDRS 2 [IUS]. Mass: 116,670 kg (257,210 lb). Nation: USA.
Related Persons: Jarvis,
McAuliffe,
McNair,
Onizuka,
Resnik,
Scobee,
Smith.
Agency: NASA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-51-L.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Duration: 0.0008 days. Decay Date: 1986-01-28 . Apogee: 15 km (9 mi). Exploded 73 seconds after launch, all 7 crewmembers were killed; carried TDRSS satellite..
- TDRS B - .
Payload: TDRS B. Mass: 2,240 kg (4,930 lb). Nation: USA.
Agency: NASA.
Program: STS.
Class: Communications.
Type: Civilian communications satellite. Spacecraft: TDRS.
Apogee: 15 km (9 mi).
- Spartan-Halley - .
Payload: Spartan-Halley. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: Spartan.
Apogee: 15 km (9 mi).
The Spartan series consists of low-cost, Shuttle-launched, short-duration, sounding-rocket-type payloads. The payloads were retrievable and reusable with a turnaround time of 6 to 9 months. Spartan operated as an autonomous sub-satellite, and the data was stored on an internal tape recorder. Pointing and stabilization were achieved by an attitude control system capable of three-axis stabilized pointing to any target within +/- 3 arc-minutes. The main objective of this spacecraft was to obtain UV spectra of the coma and tail of Comet Halley in January 1986 shortly before its perihelion. This spacecraft was lost when Space Shuttle Challenger exploded on launch.
1986 March - .
1986 May - .
1986 May - .
1986 June - .
1986 July - .
1986 July - .
1986 August - .
1986 September - .
1986 September - .
1986 September - .
- STS-62-B (cancelled) - .
Crew: Roberts.
Payload: DoD Mission. Nation: USA.
Related Persons: Roberts.
Program: STS.
Flight: STS-62-B.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Planned Department of Defense shuttle mission. Cancelled after Challenger disaster. .
1986 October - .
1986 November - .
- STS-61-L (cancelled) - .
Crew: Konrad.
Backup Crew: Cunningham, Stephen.
Payload: Communications satellites. Nation: USA.
Program: STS.
Flight: STS-61-L.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Planned shuttle mission for deployment of commercial communications satellites. Would have launched the first American journalist in space from Launch Complex 39B. Cancelled after Challenger disaster..
1986 December - .
1987 January - .
- STS-71-A (cancelled) - .
Crew: Nordsieck.
Payload: Astro-2. Nation: USA.
Related Persons: Nordsieck.
Program: STS.
Flight: STS-71-A.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Planned Astro-2 shuttle mission. Cancelled after Challenger disaster. .
1987 January - .
- STS-71-C (cancelled) - .
Crew: Longhurst.
Backup Crew: Holmes.
Payload: Communications satellites. Nation: USA.
Program: STS.
Flight: STS-71-C.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster. .
1987 February - .
- STS-71-D (cancelled) - .
Crew: Wood, Robert.
Backup Crew: Walker.
Payload: Communications satellites. Nation: USA.
Program: STS.
Flight: STS-71-D.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster. .
1987 March - .
1987 March - .
1987 August - .
- STS-71-M (cancelled) - .
Crew: Nordsieck.
Payload: Astro-3. Nation: USA.
Related Persons: Nordsieck.
Program: STS.
Flight: STS-71-M.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Planned Astro-3 shuttle mission. Cancelled after Challenger disaster. .
1988 February - .
- STS-81-G (cancelled) - .
Crew: Mohri,
Mukai.
Backup Crew: Doi.
Payload: Spacelab-J. Nation: USA.
Program: STS.
Flight: STS-81-G.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Planned Spacelab-J shuttle mission. Cancelled after Challenger disaster. .
1988 May 13 - .
Launch Site:
Vandenberg.
Launch Complex:
Vandenberg.
- SLC-6 ordered to be mothballed - .
Nation: USA.
Program: STS.
Air Force Secretary Edward C. Aldridge, Jr., directed the Air Force to begin mothballing the Space Shuttle program at Vandenberg AFB..
1988 July - .
1988 September 1 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-K (cancelled) - .
Payload: Spacelab-D1 . Nation: USA.
Program: STS.
Flight: STS-51-K.
Spacecraft Bus: Shuttle.
Spacecraft: Challenger.
Planned Spacelab-D1 shuttle mission. Cancelled after Challenger disaster. No crew selected; renamed STS-61A.
1988 September 29 - .
15:37 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-26 - .
Call Sign: Discovery. Crew: Covey,
Hauck,
Hilmers,
Lounge,
Nelson.
Payload: Discovery F07 / PDP. Mass: 21,082 kg (46,477 lb). Nation: USA.
Related Persons: Covey,
Hauck,
Hilmers,
Lounge,
Nelson.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-26.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 4.04 days. Decay Date: 1988-10-03 . USAF Sat Cat: 19547 . COSPAR: 1988-091A. Apogee: 306 km (190 mi). Perigee: 301 km (187 mi). Inclination: 28.50 deg. Period: 90.60 min.
Manned five crew. First shuttle reflight after Challenger disaster. Deployed TDRS 3. Payloads: Deploy IUS (lnertial Upper Stage) with Tracking and Data Relay Satellite (TDRS)-C. 3M's Physical Vapor Transport Organics Solids 2 experiment (PVTOS), Automated Directional Solidification Furnace (ADSF), Infrared Communi-cations Flight Experiment (lRCFE), Protein Crystal Growth Il (PCG), Isoelectric Focusing (ISF)-2, Phase Partitioning Experiment (PPE), Aggrega-tion of Red Blood Cells (ARC)-2, Mesoscale Lightning Experiment (MLE)-1, Earth Limb Radiance (ELRAD), Orbiter Experiments (OEX), Autonomous Supporting Instrumentation System (OASlS)-I, two Shuttle Student Involvement Project (SSIP) experiments.
1988 October 3 - .
1988 December 2 - .
14:30 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-27 - .
Call Sign: Atlantis. Crew: Gardner, Guy,
Gibson,
Mullane,
Ross,
Shepherd.
Payload: Atlantis F03 / Lacrosse 1. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Gardner, Guy,
Gibson,
Mullane,
Ross,
Shepherd.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-27.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 4.38 days. Decay Date: 1988-12-06 . USAF Sat Cat: 19670 . COSPAR: 1988-106A. Apogee: 447 km (277 mi). Perigee: 437 km (271 mi). Inclination: 57.00 deg. Period: 93.40 min.
Manned five crew. Deployed a classified payload. Orbits of Earth: 68. Landed at: Runway 17 dry lake bed at Edwards Air Force Base, . Landing Speed: 359 kph. Touchdown miss distance: 447.00 m. Landing Rollout: 2,171.00 m. Payloads: DoD Mission.
1988 December 6 - .
- Landing of STS-27 - .
Return Crew: Gardner, Guy,
Gibson,
Mullane,
Ross,
Shepherd.
Nation: USA.
Related Persons: Gardner, Guy,
Gibson,
Mullane,
Ross,
Shepherd.
Program: STS.
Flight: STS-27.
STS-27 landed at 23:43 GMT. .
1989 March 13 - .
14:57 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-29 - .
Call Sign: Discovery. Crew: Bagian,
Blaha,
Buchli,
Coats,
Springer.
Payload: Discovery F08 / SHARE. Mass: 17,280 kg (38,090 lb). Nation: USA.
Related Persons: Bagian,
Blaha,
Buchli,
Coats,
Springer.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-29.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 4.99 days. Decay Date: 1989-03-18 . USAF Sat Cat: 19882 . COSPAR: 1989-021A. Apogee: 308 km (191 mi). Perigee: 297 km (184 mi). Inclination: 28.50 deg. Period: 90.60 min.
Manned five crew. Deployed TDRS 4. Payloads: Deploy IUS (Inertial Upper Stage) with Tracking and Data Relay Satellite (TDRS)-D. Protein Crystal Growth (PCG); Chromosome and Plant Cell Division in Space; IMAX 70mm camera; Shuttle Student Involvement Project (SSIP) experiments: SSIP 82-8, Effects of Weightlessness in Space Flight on the Healing of Bone Fractures, and SSIP 83-9, Chicken Embryo Development in Space; Air Force Maui Optical Site (AMOS) experiment.
1989 March 18 - .
1989 May 4 - .
18:47 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-30 - .
Call Sign: Atlantis. Crew: Cleave,
Grabe,
Lee,
Thagard,
Walker, Dave.
Payload: Atlantis F04 / Magellan [IUS]. Mass: 20,833 kg (45,928 lb). Nation: USA.
Related Persons: Cleave,
Grabe,
Lee,
Thagard,
Walker, Dave.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-30.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 4.04 days. Decay Date: 1989-05-08 . USAF Sat Cat: 19968 . COSPAR: 1989-033A. Apogee: 366 km (227 mi). Perigee: 361 km (224 mi). Inclination: 28.90 deg. Period: 91.80 min. Manned five crew. Deployed Magellan Venus probe. Payloads: Deploy IUS with Magellan spacecraft. Fluids Experiment Apparatus (FEA). Mesoscale Lightning Experiment (MLE), Air Force Maui Optical Site (AMOS) experiment..
1989 May 8 - .
- Landing of STS-30 - .
Return Crew: Cleave,
Grabe,
Lee,
Thagard,
Walker, Dave.
Nation: USA.
Related Persons: Cleave,
Grabe,
Lee,
Thagard,
Walker, Dave.
Program: STS.
Flight: STS-30.
STS-30 landed at 19:40 GMT. .
1989 August 8 - .
12:37 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-28 - .
Call Sign: Columbia. Crew: Adamson,
Brown, Mark,
Leestma,
Richards,
Shaw.
Payload: Columbia F08 / DoD. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Adamson,
Brown, Mark,
Leestma,
Richards,
Shaw.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-28.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 5.04 days. Decay Date: 1989-08-13 . USAF Sat Cat: 20164 . COSPAR: 1989-061A. Apogee: 306 km (190 mi). Perigee: 289 km (179 mi). Inclination: 57.00 deg. Period: 90.50 min.
Manned five crew. Deployed 2 classified satellites. Landed at: Runway 17 dry lake bed at Edwards Air Force Base, . Landing Speed: 287 kph. Touchdown miss distance: 1,618.00 m. Landing Rollout: 1,833.00 m. Payloads: DoD Mission.
1989 August 13 - .
- Landing of STS-28 - .
Return Crew: Adamson,
Brown, Mark,
Leestma,
Richards,
Shaw.
Nation: USA.
Related Persons: Adamson,
Brown, Mark,
Leestma,
Richards,
Shaw.
Program: STS.
Flight: STS-28.
STS-28 landed at 13:43 GMT. .
1989 September 20 - .
Launch Site:
Vandenberg.
Launch Complex:
Vandenberg.
- Space Launch Complex 6 placed on mothball status. - .
Nation: USA.
Program: STS.
1989 October 18 - .
16:53 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-34 - .
Call Sign: Atlantis. Crew: Baker,
Chang-Diaz,
Lucid,
McCulley,
Williams, Donald.
Payload: Atlantis F05 / Galileo [IUS]. Mass: 22,064 kg (48,642 lb). Nation: USA.
Related Persons: Baker,
Chang-Diaz,
Lucid,
McCulley,
Williams, Donald.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-34.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 4.99 days. Decay Date: 1989-10-23 . USAF Sat Cat: 20297 . COSPAR: 1989-084A. Apogee: 307 km (190 mi). Perigee: 298 km (185 mi). Inclination: 34.30 deg. Period: 90.60 min.
Manned five crew. Deployed Galileo .Payloads: Deploy IUS with Galileo spacecraft. Shuttle Solar Backscatter Ultraviolet (SSBUV), Polymer Morphology (PM) experiments, IMAX camera project, Mesoscale Lightning Experiment (MLE), Air Force Maui Optical Site (AMOS) experiment, Growth Hormone Concentration and Distribution (GHCD) in Plants experiment, Sensor Technology Experiment (STEX), SSIP Student Experiment (SE) 82-15, Ice Crystals Experiment. First flight at this inclination.
- SSBUV-1 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SSBUV.
Decay Date: 1989-10-23 . USAF Sat Cat: 20297 . COSPAR: 1989-084xx. Apogee: 333 km (206 mi). Perigee: 297 km (184 mi). Inclination: 34.30 deg. Period: 90.80 min.
- SSBUV-2 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SSBUV.
Decay Date: 1989-10-23 . USAF Sat Cat: 20297 . COSPAR: 1989-084xx. Apogee: 333 km (206 mi). Perigee: 297 km (184 mi). Inclination: 34.30 deg. Period: 90.80 min.
- Galileo Probe - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Galileo.
Spacecraft: Galileo Probe.
Decay Date: 1989-10-23 . USAF Sat Cat: 20297 . COSPAR: 1989-084xx. Apogee: 333 km (206 mi). Perigee: 297 km (184 mi). Inclination: 34.30 deg. Period: 90.80 min.
1989 October 23 - .
- Landing of STS-34 - .
Return Crew: Baker,
Chang-Diaz,
Lucid,
McCulley,
Williams, Donald.
Nation: USA.
Related Persons: Baker,
Chang-Diaz,
Lucid,
McCulley,
Williams, Donald.
Program: STS.
Flight: STS-34.
STS-34 landed at 16:41 GMT. .
1989 November 23 - .
00:23 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-33 - .
Call Sign: Discovery. Crew: Blaha,
Carter,
Gregory,
Musgrave,
Thornton.
Payload: Discovery F09 / Magnum 2 [IUS]. Mass: 116,884 kg (257,685 lb). Nation: USA.
Related Persons: Blaha,
Carter,
Gregory,
Musgrave,
Thornton.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-33.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 5.00 days. Decay Date: 1989-11-28 . USAF Sat Cat: 20329 . COSPAR: 1989-090A. Apogee: 214 km (132 mi). Perigee: 207 km (128 mi). Inclination: 28.50 deg. Period: 88.70 min.
Manned five crew. Deployed a classified payload. Orbits of Earth: 78. Distance traveled: 3,218,687 km. Landed at: Concrete runway 04 at Edwards Air Force Base, Cali. Landing Speed: 368 kph. Touchdown miss distance: 570.00 m. Landing Rollout: 2,366.00 m. Payloads: DoD Mission - third space shuttle night launch.
1989 November 28 - .
1990 January 9 - .
12:35 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-32 - .
Call Sign: Columbia. Crew: Brandenstein,
Dunbar,
Ivins,
Low,
Wetherbee.
Payload: Columbia F09 / Syncom-4 5 [Orbus-7S]. Mass: 12,014 kg (26,486 lb). Nation: USA.
Related Persons: Brandenstein,
Dunbar,
Ivins,
Low,
Wetherbee.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-32.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 10.88 days. Decay Date: 1990-01-20 . USAF Sat Cat: 20409 . COSPAR: 1990-002A. Apogee: 361 km (224 mi). Perigee: 296 km (183 mi). Inclination: 28.50 deg. Period: 91.10 min.
Manned five crew. Deployed Leasat 5, retrieved LDEF. Night landing. Payloads: Deployment of Syncom IV-5, retrieval of Long Duration Exposure Facility (LDEF), Fluids Experiment Apparatus (FEA)-3, Protein Crystal Growth (PCG) III-2, Latitude/Longitude Locator (L3), American Flight Echocardiograph (AFE), Characterization of Neurospora Circadian Rhythms in Space (CNCR)-01, Air Force Maui Optical Site (AMOS)-4, Mesoscale Lightning Experiment (MLE), IMAX, Interim Operational Contamination Monitor (lOCM).
1990 January 20 - .
1990 February 28 - .
07:50 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-36 - .
Call Sign: Atlantis. Crew: Casper,
Creighton,
Hilmers,
Mullane,
Thuot.
Payload: Atlantis F06 / KH-12 1. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Casper,
Creighton,
Hilmers,
Mullane,
Thuot.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-36.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 4.43 days. Decay Date: 1990-03-04 . USAF Sat Cat: 20512 . COSPAR: 1990-019A. Apogee: 204 km (126 mi). Perigee: 198 km (123 mi). Inclination: 62.00 deg. Period: 88.50 min.
Manned five crew. Deployed a classified payload. Landed at: Runway 23 dry lake bed at Edwards Air Force Base, . Landing Speed: 368 kph. Touchdown miss distance: 494.00 m. Landing Rollout: 2,407.00 m. Payloads: DoD Mission - Record altitude (through 5/93).
1990 March 4 - .
1990 April 24 - .
12:33 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-31 - .
Call Sign: Discovery. Crew: Bolden,
Hawley,
McCandless,
Shriver,
Sullivan.
Payload: Discovery F10 / Hubble Space Telescope. Mass: 13,005 kg (28,671 lb). Nation: USA.
Related Persons: Bolden,
Hawley,
McCandless,
Shriver,
Sullivan.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-31.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 5.05 days. Decay Date: 1990-04-29 . USAF Sat Cat: 20579 . COSPAR: 1990-037A. Apogee: 615 km (382 mi). Perigee: 585 km (363 mi). Inclination: 28.50 deg. Period: 96.70 min.
Deployed HST (Hubble Space Telescope). Payloads: Deployment of Hubble Space Telescope, IMAX camera in payload bay and in crew compartment, Protein Crystal Growth III-03, Investigation Into Polymer Membrane Process-ing- 01, Air Force Maui Optical Site-05, Radiation Monitoring Equipment III-01, Student Experiment 82-16, and Ascent Particle Monitor 01.
1990 October 6 - .
11:47 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-41 - .
Call Sign: Discovery. Crew: Akers,
Cabana,
Melnick,
Richards,
Shepherd.
Payload: Discovery F11 / Ulysses [IUS + PAM-S]. Mass: 22,140 kg (48,810 lb). Nation: USA.
Related Persons: Akers,
Cabana,
Melnick,
Richards,
Shepherd.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-41.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 4.09 days. Decay Date: 1990-10-10 . USAF Sat Cat: 20841 . COSPAR: 1990-090A. Apogee: 307 km (190 mi). Perigee: 300 km (180 mi). Inclination: 28.50 deg. Period: 90.60 min.
Manned five crew. Deployed Ulysses spacecraft. Payloads: Deploy Ulysses, Shuttle Solar Backscatter Ultraviolet, Intelsat Solar Array Coupon, Solid-Surface Combustion Experiment, Investigations Into Polymer Membrane Processing, Chromo-some and Plant Cell Division in Space, Physiological Systems Experiment, Voice Command System, Radiation Monitoring Equipment III, Air Force Maui Optical Site.
1990 October 10 - .
1990 November 15 - .
23:48 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-38 - .
Call Sign: Atlantis. Crew: Covey,
Culbertson,
Gemar,
Meade,
Springer.
Payload: Atlantis F07 / DoD. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Covey,
Culbertson,
Gemar,
Meade,
Springer.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-38.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 4.91 days. Decay Date: 1990-11-20 . USAF Sat Cat: 20935 . COSPAR: 1990-097A. Apogee: 226 km (140 mi). Perigee: 78 km (48 mi). Inclination: 28.50 deg. Period: 87.50 min. Manned five crew. Deployed a classified payload. Orbits of Earth: 79. Payloads: DoD Mission..
1990 November 20 - .
- Landing of STS-38 - .
Return Crew: Covey,
Culbertson,
Gemar,
Meade,
Springer.
Nation: USA.
Related Persons: Covey,
Culbertson,
Gemar,
Meade,
Springer.
Program: STS.
Flight: STS-38.
STS-38 landed at 21:40 GMT. Landed at: Runway 33 at Kennedy Space Center, Florida. Landing Speed: 359 kph. Touchdown miss distance: 430.00 m. Landing Rollout: 2,712.00 m..
1990 December 2 - .
06:49 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-35 - .
Call Sign: Columbia. Crew: Brand,
Durrance,
Gardner, Guy,
Hoffman,
Lounge,
Parise,
Parker.
Payload: Columbia F10 / BBXRT. Mass: 11,943 kg (26,329 lb). Nation: USA.
Related Persons: Brand,
Durrance,
Gardner, Guy,
Hoffman,
Lounge,
Parise,
Parker.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-35.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 8.96 days. Decay Date: 1990-12-11 . USAF Sat Cat: 20980 . COSPAR: 1990-106A. Apogee: 362 km (224 mi). Perigee: 352 km (218 mi). Inclination: 28.50 deg. Period: 91.70 min. Manned seven crew. Carried ASTRO-1 observatory. Payloads: Ultraviolet Astronomy TeIescope (Astro), Broad-Band X-Ray Telescope (BBXRT), Shuttle Amateur Radio Experiment (SAREX), Air Force Maui Optical Site (AMOS)..
- Astro 1 Fwd - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1990-12-11 . USAF Sat Cat: 20980 . COSPAR: 1990-106xx. Apogee: 361 km (224 mi). Perigee: 339 km (210 mi). Inclination: 28.50 deg. Period: 91.50 min.
- Astro 1 Aft - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1990-12-11 . USAF Sat Cat: 20980 . COSPAR: 1990-106xx. Apogee: 361 km (224 mi). Perigee: 339 km (210 mi). Inclination: 28.50 deg. Period: 91.50 min.
- BBXRT - .
Payload: BBXRT/TAPS. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: BBXRT.
Decay Date: 1990-12-11 . USAF Sat Cat: 20980 . COSPAR: 1990-106xx. Apogee: 361 km (224 mi). Perigee: 339 km (210 mi). Inclination: 28.50 deg. Period: 91.50 min.
1991 April 5 - .
14:22 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-37 - .
Call Sign: Atlantis. Crew: Apt,
Cameron,
Godwin,
Nagel,
Ross.
Payload: Atlantis F08 / Compton Gamma Ray Observatory. Mass: 16,611 kg (36,620 lb). Nation: USA.
Related Persons: Apt,
Cameron,
Godwin,
Nagel,
Ross.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-37.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 5.98 days. Decay Date: 1991-04-11 . USAF Sat Cat: 21224 . COSPAR: 1991-027A. Apogee: 462 km (287 mi). Perigee: 450 km (270 mi). Inclination: 28.50 deg. Period: 93.70 min.
Manned five crew. Unscheduled EVA to manually deploy the Gamma-Ray Observatory's high-gain antenna, which failed to deploy upon ground command. Payloads: Gamma-Ray Observatory (GRO), Crew/ Equipment Translation Aids (part of Extravehicular Activity Development Flight Experiment), Ascent Particle Monitor (APM), Bioserve Instrumentation Technology Associates Materials Dispersion Apparatus (BlMDA), Protein Crystal Growth (PCG)-Block Il, Space Station Heatpipe Advanced Radiator Element (SHARE)-ll, Shuttle Amateur Radio Experiment (SAREX)-ll, Radiation Monitoring Equipment (RME)-lIl, Air Force Maui Optical Site (AMOS) Calibration Test.
1991 April 7 - .
- EVA STS-37-1 - .
Crew: Apt,
Ross.
EVA Duration: 0.19 days. Nation: USA.
Related Persons: Apt,
Ross.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-37.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Manually deployed Gamma-Ray Observatory's high-gain antenna..
1991 April 8 - .
- EVA STS-37-2 - .
Crew: Apt,
Ross.
EVA Duration: 0.25 days. Nation: USA.
Related Persons: Apt,
Ross.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-37.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Tested CETA (Crew / Equipment Translation Aids - rail with cart for moving astronauts around exterior of International Space Station)..
1991 April 11 - .
1991 April 28 - .
11:33 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-39 - .
Call Sign: Discovery. Crew: Bluford,
Coats,
Hammond,
Harbaugh,
Hieb,
McMonagle,
Veach.
Payload: Discovery F12. Mass: 9,712 kg (21,411 lb). Nation: USA.
Related Persons: Bluford,
Coats,
Hammond,
Harbaugh,
Hieb,
McMonagle,
Veach.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-39.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 8.31 days. Decay Date: 1991-05-06 . USAF Sat Cat: 21242 . COSPAR: 1991-031A. Apogee: 263 km (163 mi). Perigee: 248 km (154 mi). Inclination: 57.00 deg. Period: 89.60 min.
Manned seven crew. Deployed USA 70, CRO A, CRO B, CRO C; deployed and retrieved IBSS. Payloads: Infrared Background Signature Survey (lBSS), Air Force Program (AFP)-675, Space Test Payload (STP)-I, Multi-Purpose Experiment Canister (MPEC), Cloud Logic to Optimize Use of Defense Systems (CLOUDS)-1A, Radiation Monitoring Equipment (RME)-lll.
- STP-1 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: STP-1.
Decay Date: 1991-05-06 . USAF Sat Cat: 21242 . COSPAR: 1991-031xx. Apogee: 265 km (164 mi). Perigee: 250 km (150 mi). Inclination: 57.00 deg. Period: 89.70 min.
- AFP-675 - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft: AFP-675.
Decay Date: 1991-05-06 . USAF Sat Cat: 21242 . COSPAR: 1991-031xx. Apogee: 265 km (164 mi). Perigee: 250 km (150 mi). Inclination: 57.00 deg. Period: 89.70 min.
- USA 70 - .
Payload: MPEC. Nation: USA.
Agency: DARPA.
Program: STS.
Class: Technology.
Type: Military technology satellite. Spacecraft: MPEC.
USAF Sat Cat: 21262 . COSPAR: 1991-031C. Classified subsatellite released from shuttle..
1991 May 6 - .
- Landing of STS-39 - .
Return Crew: Bluford,
Coats,
Hammond,
Harbaugh,
Hieb,
McMonagle,
Veach.
Nation: USA.
Related Persons: Bluford,
Coats,
Hammond,
Harbaugh,
Hieb,
McMonagle,
Veach.
Program: STS.
Flight: STS-39.
STS-39 landed at 18:53 GMT. .
1991 June 5 - .
13:24 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-40 - .
Call Sign: Columbia. Crew: Bagian,
Gaffney,
Gutierrez,
Hughes-Fulford,
Jernigan,
O Connor,
Seddon.
Payload: Columbia F11 / GBA-2. Mass: 11,767 kg (25,941 lb). Nation: USA.
Related Persons: Bagian,
Gaffney,
Gutierrez,
Hughes-Fulford,
Jernigan,
O Connor,
Seddon.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-40.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 9.09 days. Decay Date: 1991-06-14 . USAF Sat Cat: 21399 . COSPAR: 1991-040A. Apogee: 296 km (183 mi). Perigee: 287 km (178 mi). Inclination: 39.00 deg. Period: 90.40 min.
Carried Spacelab life sciences module. Payloads: Spacelab Life Sciences (SLS)-1 with long module, getaway special bridge assembly with 12 getaway specials, Physiological Monitoring System (PMS), Urine Monitoring System (UMS), Animal Enclosure Modules (AEM), Middeck Zero-gravity Dynamics Experiment (MODE), 7 Orbiter Experiments Program experiments.
- GBA-2 - .
Payload: GAS Bridge. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: GBA.
Decay Date: 1991-06-14 . USAF Sat Cat: 21399 . COSPAR: 1991-040xx. Apogee: 289 km (179 mi). Perigee: 276 km (171 mi). Inclination: 39.00 deg. Period: 90.20 min.
1991 August 2 - .
15:02 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-43 - .
Call Sign: Atlantis. Crew: Adamson,
Baker, Mike,
Blaha,
Low,
Lucid.
Payload: Atlantis F09 / TDRS 5 [IUS]. Mass: 21,265 kg (46,881 lb). Nation: USA.
Related Persons: Adamson,
Baker, Mike,
Blaha,
Low,
Lucid.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-43.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 8.89 days. Decay Date: 1991-08-11 . USAF Sat Cat: 21638 . COSPAR: 1991-054A. Apogee: 306 km (190 mi). Perigee: 301 km (187 mi). Inclination: 28.50 deg. Period: 90.60 min.
Manned five crew. Deployed TDRS 5 satellite. Payloads: Tracking and Data Relay Satellite (TDRS)-E/lnertial Upper Stage (lUS), Space Station Heatpipe Advanced Radiator Element (SHARE)-ll, Shuttle Solar Backscatter Ultraviolet (SSBUV) instrument 03, Optical Communications Through the Shuttle Window (OCTW), Air Force Maui Optical Site (AMOS) Calibration Test, Auroral Photography Experiment (APE)-B, Bioserve-lnstrumentation Technology Associates Materials Dispersion Apparatus (BlMDA)-02, Investigations Into Polymer Membrane Processing (IPMP)-03, Protein Crystal Growth Ill Block Il, Space Acceleration Measure-ment System (SAMS), Solid Surface Combustion Experiment (SSCE)-02, Tank Pressure Control Experiment (TPCE).
1991 August 10 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Columbia overhauled at Palmdale - .
Nation: USA.
Program: STS.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
The orbiter returned to service on 9 February 1992. 62 modifications were made, including replacement of the nose cap; removal of the SEADS and SUMS experiment packages; new Auxiliary Power Units installed; carbon brakes and a drag chute installed; Orbiter 6.0 structural modifications made; AP-101S General Purpose Computers replaced the older AP-101P's; and the Thermal Protection System was reworked.
1991 August 11 - .
- Landing of STS-43 - .
Return Crew: Adamson,
Baker, Mike,
Blaha,
Low,
Lucid.
Nation: USA.
Related Persons: Adamson,
Baker, Mike,
Blaha,
Low,
Lucid.
Program: STS.
Flight: STS-43.
STS-43 landed at 12:28 GMT. .
1991 September 12 - .
23:11 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-48 - .
Call Sign: Discovery. Crew: Brown, Mark,
Buchli,
Creighton,
Gemar,
Reightler.
Payload: Discovery F13 / UARS. Mass: 7,854 kg (17,315 lb). Nation: USA.
Related Persons: Brown, Mark,
Buchli,
Creighton,
Gemar,
Reightler.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-48.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 5.35 days. Decay Date: 1991-09-19 . USAF Sat Cat: 21700 . COSPAR: 1991-063A. Apogee: 580 km (360 mi). Perigee: 575 km (357 mi). Inclination: 57.00 deg. Period: 96.20 min.
Manned five crew. Deployed UARS; conducted materials and biological research. Payloads: Upper Atmosphere Research Satellite (UARS), Ascent Particle Monitor (APM)-03, Physiological and Anatomical Rodent Experiment (PARE)-01, Protein Crystal Growth (PCG)-ll-2, Middeck Zero-Gravity Dynamics, Experiment (MODE)-01, Investigations Into Polymer Membrane Processing (IPMP)-04, Cosmic Radiation Effects and Activation Monitor (CREAM-02), Radiation Monitoring Equipment (RME)-lll-06, Shuttle Activation Monitor (SAM)-03, Air Force Maui Optical Site (AMOS) Calibration Test.
1991 September 18 - .
- Landing of STS-48 - .
Return Crew: Brown, Mark,
Buchli,
Creighton,
Gemar,
Reightler.
Nation: USA.
Related Persons: Brown, Mark,
Buchli,
Creighton,
Gemar,
Reightler.
Program: STS.
Flight: STS-48.
STS-48 landed at 07:38 GMT. .
1991 November 24 - .
23:44 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-44 - .
Call Sign: Atlantis. Crew: Gregory,
Hennen,
Henricks,
Musgrave,
Runco,
Voss.
Payload: Atlantis F10 / DSP 16 [IUS]. Mass: 20,242 kg (44,625 lb). Nation: USA.
Related Persons: Gregory,
Hennen,
Henricks,
Musgrave,
Runco,
Voss.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-44.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 6.95 days. Decay Date: 1991-11-30 . USAF Sat Cat: 21795 . COSPAR: 1991-080A. Apogee: 371 km (230 mi). Perigee: 363 km (225 mi). Inclination: 28.50 deg. Period: 91.90 min.
Manned six crew. Deployed Defense Support Program satellite. Payloads: Defense Support Program satellite/ Inertial Upper Stage, Interim Operational Contamination Monitor, Terra Scout, Military Man in Space, Shuttle Activation Monitor, Cosmic Radiation Effects and Activation Monitor, Radiation Monitoring Equipment Ill, Air Force Maui Optical Site Calibration Test, Ultraviolet Plume Instrument, Visual Function Tester 1.
1991 December 2 - .
- Landing of STS-44 - .
Return Crew: Gregory,
Hennen,
Henricks,
Musgrave,
Runco,
Voss.
Nation: USA.
Related Persons: Gregory,
Hennen,
Henricks,
Musgrave,
Runco,
Voss.
Program: STS.
Flight: STS-44.
STS-44 landed at 22:36 GMT. .
1992 January 22 - .
14:52 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-42 - .
Call Sign: Discovery. Crew: Bondar,
Grabe,
Hilmers,
Merbold,
Oswald,
Readdy,
Thagard.
Payload: Discovery F14 / GBA-3. Mass: 13,001 kg (28,662 lb). Nation: USA.
Related Persons: Bondar,
Grabe,
Hilmers,
Merbold,
Oswald,
Readdy,
Thagard.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-42.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Duration: 8.05 days. Decay Date: 1992-01-30 . USAF Sat Cat: 21846 . COSPAR: 1992-002A. Apogee: 307 km (190 mi). Perigee: 291 km (180 mi). Inclination: 57.00 deg. Period: 90.50 min.
Manned seven crew. Carried International Microgravity Laboratory-1. Payloads: International Microgravity Laboratory (lML)-1, getaway special (GAS) bridge with 10 getaway specials, IMAX camera, Gelation of Sols: Applied Microgravity Research (GOSAMR)-1, Investigations Into Polymer Mem-brane Processing (IPMP), Radiation Monitoring Equipment (RME)-lll, Student Experiment 81-09: Convection in Zero Gravity, Student Experiment 83-02: Capillary Rise of Liquid Through Granular Porous Media.
- GBA-3 - .
Payload: GAS Bridge. Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: GBA.
Decay Date: 1992-01-30 . USAF Sat Cat: 21846 . COSPAR: 1992-002xx. Apogee: 299 km (185 mi). Perigee: 286 km (177 mi). Inclination: 57.00 deg. Period: 90.40 min.
1992 February 1 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Discovery OMDP-1 - .
Nation: USA.
Program: STS.
Spacecraft Bus: Shuttle.
Spacecraft: Discovery.
Shuttle Discovery undergoes its OMDP-1 Orbiter Maintenance Down Period at the Kennedy Space Center. These are undertaken every 10 to 12 shuttle missions. 70 modifications are made, including addition of a brake chute, structural inspection, and thermal protection system refit.
1992 March 24 - .
13:13 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-45 - .
Call Sign: Atlantis. Crew: Bolden,
Duffy,
Foale,
Frimout,
Leestma,
Lichtenberg,
Sullivan.
Payload: Atlantis F11 / Atlas 1 Fwd. Mass: 8,020 kg (17,680 lb). Nation: USA.
Related Persons: Bolden,
Duffy,
Foale,
Frimout,
Leestma,
Lichtenberg,
Sullivan.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-45.
Spacecraft Bus: Shuttle.
Spacecraft: Atlantis.
Duration: 8.92 days. Decay Date: 1992-04-02 . USAF Sat Cat: 21915 . COSPAR: 1992-015A. Apogee: 294 km (182 mi). Perigee: 282 km (175 mi). Inclination: 57.00 deg. Period: 90.30 min.
Manned seven crew. Carried ATLAS-1 experimental package. Payloads: Atmospheric Laboratory for Applications and Science (ATLAS)-1, Shuttle Solar Backscat-ter Ultraviolet (SSBUV)-4, Getaway Special Experiment G-229, Space Tissue Loss (STL)-1, Radiation Monitoring Equipment (RME)-lIl, Visual Function Tester (VFT)-lI, Cloud Logic To Opti-mize Use of Defense Systems (CLOUDS)-1A, Investigations Into Polymer Membrane Process-ing (IPMP), Shuttle Amateur Radio Experiment (SAREX)-Il, Ultraviolet Plume Instrument (UVPl).
- Atlas 1 Aft - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1992-04-02 . USAF Sat Cat: 21915 . COSPAR: 1992-015xx. Apogee: 293 km (182 mi). Perigee: 283 km (175 mi). Inclination: 57.00 deg. Period: 90.30 min.
- Atlas 1 Fwd - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1992-04-02 . USAF Sat Cat: 21915 . COSPAR: 1992-015xx. Apogee: 293 km (182 mi). Perigee: 283 km (175 mi). Inclination: 57.00 deg. Period: 90.30 min.
1992 May 7 - .
23:40 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-49 - .
Call Sign: Endeavour. Crew: Akers,
Brandenstein,
Chilton,
Hieb,
Melnick,
Thornton,
Thuot.
Payload: Endeavour F01 / Intelsat 6 SRM. Mass: 14,786 kg (32,597 lb). Nation: USA.
Related Persons: Akers,
Brandenstein,
Chilton,
Hieb,
Melnick,
Thornton,
Thuot.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-49.
Spacecraft Bus: Shuttle.
Spacecraft: Endeavour.
Duration: 8.89 days. Decay Date: 1992-05-16 . USAF Sat Cat: 21963 . COSPAR: 1992-026A. Apogee: 341 km (211 mi). Perigee: 268 km (166 mi). Inclination: 28.30 deg. Period: 90.60 min.
Retrieved Intelsat 6 and attached new SRM. First active dual rendezvous of two orbiting spacecraft (Endeavour and Intelsat-Vl). First deployment of a drag chute on the orbiter fleet. Payloads: Intelsat-Vl reboost mission hardware, Assembly of Station by EVA Methods (ASEM), Commercial Protein Crystal Growth (CPCG), Air Force Maui Optical Site (AMOS) Calibration Test, Ultraviolet Plume Instrument (UVPl).
- Intelsat Cradle - .
Nation: International.
Agency: NASA.
Program: STS.
Decay Date: 1992-05-16 . USAF Sat Cat: 21963 . COSPAR: 1992-026xx. Apogee: 361 km (224 mi). Perigee: 344 km (213 mi). Inclination: 28.30 deg. Period: 91.60 min.
- Orbus 21S - .
Nation: USA.
Agency: NASA.
Program: STS.
COSPAR: 1992-026xx.
- MPESS-ASEM - .
Nation: USA.
Agency: NASA.
Program: STS.
Spacecraft Bus: Shuttle Attached Payloads.
Spacecraft: SLP.
Decay Date: 1992-05-16 . USAF Sat Cat: 21963 . COSPAR: 1992-026xx. Apogee: 361 km (224 mi). Perigee: 344 km (213 mi). Inclination: 28.30 deg. Period: 91.60 min. Space shuttle bay Multi Purpose Experiment Support Structure and ASEM Node Carrier, providing stowage for EVA equipment..
1992 May 11 - .
20:40 GMT - .
- EVA STS-49-1 - .
Crew: Hieb,